[185803] in Hotline Meeting

home help back first fref pref prev next nref lref last post

*Correction* Bldg 66 - All - Chilled Water Shutdown Request

daemon@ATHENA.MIT.EDU (Amy Chioccola)
Thu Jan 21 13:21:01 2016

From: Amy Chioccola <amychamb@mit.edu>
To: shutdown-response <shutdown-response@mit.edu>,
        Adrienne Bruno
	<brunoa@mit.edu>, Sandra Lopes <slopes@mit.edu>,
        Stephen K Wetzel
	<swetzel@mit.edu>, csg-all <csg-all@mit.edu>,
        rm-ecs <rm-ecs@mit.edu>, cust-staff <cust-staff@mit.edu>,
        schedules <schedules@mit.edu>, shutdowns
	<shutdowns@mit.edu>
CC: Michael J Smalley <msmalley@mit.edu>, Billy Homeyer <whomeyer@mit.edu>,
        Joyand Charles <joyand@mit.edu>
Date: Thu, 21 Jan 2016 18:18:53 +0000
Message-ID: <5D3B80144603274BA8C8BC8A608883E393932186@OC11EXPO32.exchange.mit.edu>
Content-Language: en-US
Content-Type: multipart/alternative;
	boundary="_000_5D3B80144603274BA8C8BC8A608883E393932186OC11EXPO32excha_"
MIME-Version: 1.0

--_000_5D3B80144603274BA8C8BC8A608883E393932186OC11EXPO32excha_
Content-Type: text/plain; charset="us-ascii"
Content-Transfer-Encoding: quoted-printable

The following *corrected* chilled water shutdown request for bldg. 66 - all=
, on Friday, January 29, 2016, from 11:00pm thru 8:00pm on Saturday, Januar=
y 30, 2016,  is for your information and response.  Any questions please co=
ntact Billy Homeyer x8-0432.

Please let us know whether this does or does not have your approval.

Thank you,

Amy Chamberlain-Chioccola
Comprehensive Stewardship Group
Dept. of Facilities
x5-4164


Type: Normal
Date: January 29, 2016
Day: Friday
Time: 11:00pm(Fri) - 8:00pm(Sat)
Building(s): 66
Room(s): All
System: Chilled Water
Duration: 21 Hours
Reason:
We request a bldg 66-all chilled water shutdown from 11 PM on Friday night,=
 January 29th to 8 PM on Saturday night, January 30th, 2016 for AHC Mechani=
cal (Guy Fossiano 781-844-7815) to replace two 10" chw pump isolation valve=
s in 0051. Over the course of the following two weeks CHWP3 and CHWP3A and =
associated suction/discharge valves and piping/strainers/checks will all be=
 replaced as part of the bldg 66 renovation project. Joyand Charles 4-6910 =
is the MIT project manager.

Effect:
Loss of chilled water, cold lab process, and supply cooling for the duratio=
n of the shutdown.


--_000_5D3B80144603274BA8C8BC8A608883E393932186OC11EXPO32excha_
Content-Type: text/html; charset="us-ascii"
Content-Transfer-Encoding: quoted-printable

<html xmlns:v=3D"urn:schemas-microsoft-com:vml" xmlns:o=3D"urn:schemas-micr=
osoft-com:office:office" xmlns:w=3D"urn:schemas-microsoft-com:office:word" =
xmlns:m=3D"http://schemas.microsoft.com/office/2004/12/omml" xmlns=3D"http:=
//www.w3.org/TR/REC-html40">
<head>
<meta http-equiv=3D"Content-Type" content=3D"text/html; charset=3Dus-ascii"=
>
<meta name=3D"Generator" content=3D"Microsoft Word 14 (filtered medium)">
<style><!--
/* Font Definitions */
@font-face
	{font-family:Calibri;
	panose-1:2 15 5 2 2 2 4 3 2 4;}
@font-face
	{font-family:Tahoma;
	panose-1:2 11 6 4 3 5 4 4 2 4;}
/* Style Definitions */
p.MsoNormal, li.MsoNormal, div.MsoNormal
	{margin:0in;
	margin-bottom:.0001pt;
	font-size:11.0pt;
	font-family:"Calibri","sans-serif";}
a:link, span.MsoHyperlink
	{mso-style-priority:99;
	color:blue;
	text-decoration:underline;}
a:visited, span.MsoHyperlinkFollowed
	{mso-style-priority:99;
	color:purple;
	text-decoration:underline;}
p.MsoAcetate, li.MsoAcetate, div.MsoAcetate
	{mso-style-priority:99;
	mso-style-link:"Balloon Text Char";
	margin:0in;
	margin-bottom:.0001pt;
	font-size:8.0pt;
	font-family:"Tahoma","sans-serif";}
span.EmailStyle17
	{mso-style-type:personal-compose;
	font-family:"Calibri","sans-serif";
	color:windowtext;}
span.BalloonTextChar
	{mso-style-name:"Balloon Text Char";
	mso-style-priority:99;
	mso-style-link:"Balloon Text";
	font-family:"Tahoma","sans-serif";}
.MsoChpDefault
	{mso-style-type:export-only;
	font-family:"Calibri","sans-serif";}
@page WordSection1
	{size:8.5in 11.0in;
	margin:1.0in 1.0in 1.0in 1.0in;}
div.WordSection1
	{page:WordSection1;}
--></style><!--[if gte mso 9]><xml>
<o:shapedefaults v:ext=3D"edit" spidmax=3D"1026" />
</xml><![endif]--><!--[if gte mso 9]><xml>
<o:shapelayout v:ext=3D"edit">
<o:idmap v:ext=3D"edit" data=3D"1" />
</o:shapelayout></xml><![endif]-->
</head>
<body lang=3D"EN-US" link=3D"blue" vlink=3D"purple">
<div class=3D"WordSection1">
<p class=3D"MsoNormal">The following *<b>corrected</b>* chilled water shutd=
own request for bldg. 66 - all, on
<b>Friday, January 29, 2016</b>, from 11:00pm thru 8:00pm on <b>Saturday, J=
anuary 30, 2016</b>,&nbsp; is for your information and response.&nbsp; Any =
questions please contact Billy Homeyer x8-0432.<o:p></o:p></p>
<p class=3D"MsoNormal"><o:p>&nbsp;</o:p></p>
<p class=3D"MsoNormal">Please let us know whether this does or does not hav=
e your approval.<o:p></o:p></p>
<p class=3D"MsoNormal"><o:p>&nbsp;</o:p></p>
<p class=3D"MsoNormal">Thank you, <o:p></o:p></p>
<p class=3D"MsoNormal"><o:p>&nbsp;</o:p></p>
<p class=3D"MsoNormal">Amy Chamberlain-Chioccola<o:p></o:p></p>
<p class=3D"MsoNormal">Comprehensive Stewardship Group<o:p></o:p></p>
<p class=3D"MsoNormal">Dept. of Facilities<o:p></o:p></p>
<p class=3D"MsoNormal">x5-4164<o:p></o:p></p>
<p class=3D"MsoNormal"><o:p>&nbsp;</o:p></p>
<p class=3D"MsoNormal"><o:p>&nbsp;</o:p></p>
<p class=3D"MsoNormal">Type: Normal<o:p></o:p></p>
<p class=3D"MsoNormal">Date: <b>January 29, 2016</b><o:p></o:p></p>
<p class=3D"MsoNormal">Day: Friday<o:p></o:p></p>
<p class=3D"MsoNormal">Time: 11:00pm(Fri) - 8:00pm(Sat)<o:p></o:p></p>
<p class=3D"MsoNormal">Building(s): 66<o:p></o:p></p>
<p class=3D"MsoNormal">Room(s): All<o:p></o:p></p>
<p class=3D"MsoNormal">System: Chilled Water<o:p></o:p></p>
<p class=3D"MsoNormal">Duration: 21 Hours<o:p></o:p></p>
<p class=3D"MsoNormal">Reason: <o:p></o:p></p>
<p class=3D"MsoNormal">We request a bldg 66-all chilled water shutdown from=
 11 PM on Friday night, January 29th to 8 PM on Saturday night, January 30t=
h, 2016 for AHC Mechanical (Guy Fossiano 781-844-7815) to replace two 10&qu=
ot; chw pump isolation valves in 0051.
 Over the course of the following two weeks CHWP3 and CHWP3A and associated=
 suction/discharge valves and piping/strainers/checks will all be replaced =
as part of the bldg 66 renovation project. Joyand Charles 4-6910 is the MIT=
 project manager.<o:p></o:p></p>
<p class=3D"MsoNormal"><o:p>&nbsp;</o:p></p>
<p class=3D"MsoNormal">Effect: <o:p></o:p></p>
<p class=3D"MsoNormal">Loss of chilled water, cold lab process, and supply =
cooling for the duration of the shutdown.<o:p></o:p></p>
<p class=3D"MsoNormal"><o:p>&nbsp;</o:p></p>
</div>
</body>
</html>

--_000_5D3B80144603274BA8C8BC8A608883E393932186OC11EXPO32excha_--

home help back first fref pref prev next nref lref last post