[17683] in Hotline Meeting
update on 3900 field service calls
daemon@ATHENA.MIT.EDU (kim@Athena.MIT.EDU)
Fri Aug 20 09:39:04 1993
From: kim@Athena.MIT.EDU
To: op@Athena.MIT.EDU
Cc: hotline@Athena.MIT.EDU
Date: Fri, 20 Aug 93 09:38:56 EDT
Aphrodite - DEC will be in 9:00am Monday to work on the system.
Drive 1 is commented out of fstab.
Hecate - DEC replaced the drive 0/3 controller and the fan. All
disks are online and in service.
Themis - DEC replaced the ECM and power supply for drive 3.
The drive was offline when the system was last booted.
Drive 3 needs to be put back in fstab and the system rebooted.
Then the disk needs to be tested before moira puts any real
volumes on it. The reboot is scheduled for 9:00 Monday.