Approved: EXTENDED: Bldg. E25-6th fl. Fire Alarm Shutdown (*live
daemon@ATHENA.MIT.EDU (Jennifer Garland)
Tue Aug 20 14:55:09 2013
From: Jennifer Garland <jennygar@plant.mit.edu>
To: "jdoughty@mit.edu" <jdoughty@MIT.EDU>, "swade@mit.edu" <swade@MIT.EDU>,
"macdonaj@mit.edu" <macdonaj@MIT.EDU>,
"craigp@MIT.EDU" <craigp@MIT.EDU>,
"OPS RM Campus Services East" <rm-ecs@MIT.EDU>,
Ops Custodial Admin & Support
Staff <cust-staff@MIT.EDU>,
"bengel@mit.edu" <bengel@MIT.EDU>, "rdfadel@MIT.EDU" <rdfadel@MIT.EDU>,
"tquinn@mit.edu" <tquinn@MIT.EDU>, "ninadm@mit.edu" <ninadm@MIT.EDU>,
Michael Smith <masmith@MIT.EDU>, "brig@med.mit.edu" <brig@med.mit.edu>,
MIT Schedules Office
<schedules@MIT.EDU>,
"scottide@MIT.EDU" <scottide@MIT.EDU>,
"heatherg@mit.edu" <heatherg@MIT.EDU>,
"shutdowns@mit.edu"
<shutdowns@MIT.EDU>,
"whomeyer@mit.edu" <whomeyer@MIT.EDU>,
"ksemerj@mit.edu"
<ksemerj@MIT.EDU>,
Steven Gilligan <sgilliga@plant.mit.edu>,
Ops RM Shutdown
<rm-shutdown@MIT.EDU>, DOF EHS <dof-ehs@MIT.EDU>,
"cp-command@mit.edu"
<cp-command@MIT.EDU>,
"safety@mit.edu" <safety@MIT.EDU>,
Operators
<Operators@plant.mit.edu>,
"DOF Customer Service Center" <dof-csc@MIT.EDU>,
"Ops Custodial Admin & Support Staff" <cust-staff@MIT.EDU>
CC: "jennygar@mit.edu" <jennygar@MIT.EDU>, "biss@mit.edu" <biss@MIT.EDU>
Date: Tue, 20 Aug 2013 14:55:03 -0400
Message-ID: <4EEA516695C10541B7CB963FF54A56AF13C7DD218D@dof-exchmbx01.facilities.ms.mit.edu>
Content-Language: en-US
Content-Type: multipart/alternative;
boundary="_000_4EEA516695C10541B7CB963FF54A56AF13C7DD218Ddofexchmbx01f_"
MIME-Version: 1.0
--_000_4EEA516695C10541B7CB963FF54A56AF13C7DD218Ddofexchmbx01f_
Content-Type: text/plain; charset="us-ascii"
Content-Transfer-Encoding: quoted-printable
The following Approved Extended Fire Alarm Shutdown (*live audible testing=
on 8/7 and 8/8) is for bldg. E25- 6th fl on Wednesday, August 7, 2013 til =
Thursday, August 8, 2013/ EXTENDED to include Wednesday, August 21, 20132 =
from 6:00am til 7:30am to conduct *live audible 3rd party test of the new E=
25 - 6th fl fir ealarm system*. Any questions please contact Billy Homeyer =
x8-0432.
Thank you,
Jennifer M. Garland
Repair and Maintenance
4-4350
Type: Normal
Date: August 7, 2013//EXTENDED to include Wednesday, August 21, 2013
Day: Wednesday
Time: 6:00am - 7:30am
Building(s): E25
Room(s): 6th fl.
System: fire alarm
Duration: 6:00am - 7:30am
Reason:
**EXTENDED: We would like to extend the E25-all fire alarm shutdown from 6 =
AM to 7:30 AM on Wednesday, August 21st, 2013 for JMBCo (Wayne Maginnis 617=
-212-2059/Rich Cucchi 617-522-6800) to complete tie-in, programming and tes=
ting the new speaker/strobes and exhaust fan HOA switches; and we will cond=
uct a *live audible 3rd party test of the new E25-6th floor fire alarm syst=
em* as part of the Prof. McGee lab cleanroom renovation project by DC Beane=
(Ryan Kucinski 617-997-9498). Both the shutdown request form and work ord=
er #5206749 have been modified to reflect this extension on behalf of Billy=
Homeyer.**
We request bldg E25-6th floor fire alarm shutdowns as follows;from 6 AM to =
2 PM on Wednesday, August 7th, 2013, Simplex (Rich Perron 781-603-7799) wil=
l program HOA switches for the new exhaust fans and from 6 AM to 7:30 AM, w=
e will conduct a *live audible 1st party test of the new E25-6th floor fire=
alarm devices*. On Thursday, August 8th, 2013 from 6 AM to 7:30 AM, JMB=
Co (Rich Cucchi 617-522-6800) will conduct a *live audible 3rd party test o=
f the E25-6th floor fire alarm system* as part of the Prof. McGee lab clean=
room renovation project by DC Beane (Ryan Kucinski 617-997-9498). Biss Tee=
lucksingh 2-5972 and Paul Murphy 4-6361 are the MIT project managers on beh=
alf of Billy Homeyer.
Effect:
Loss of fire alarms for the duration of this shutdown.
--_000_4EEA516695C10541B7CB963FF54A56AF13C7DD218Ddofexchmbx01f_
Content-Type: text/html; charset="us-ascii"
Content-Transfer-Encoding: quoted-printable
<html>
<head>
<meta http-equiv=3D"Content-Type" content=3D"text/html; charset=3Dus-ascii"=
>
<meta name=3D"Generator" content=3D"Microsoft Exchange Server">
<!-- converted from rtf -->
<style><!-- .EmailQuote { margin-left: 1pt; padding-left: 4pt; border-left:=
#800000 2px solid; } --></style>
</head>
<body>
<font face=3D"Calibri, sans-serif" size=3D"2">
<div>The following <font color=3D"#1F497D"> Approved </font><b>Extended </b=
>Fire Alarm Shutdown (*live audible testing on 8/7 and 8/8) is for bldg. E2=
5- 6th fl on Wednesday, August 7, 2013 til Thursday, August 8, 2013/ <b>EXT=
ENDED to include Wednesday, August
21, 20132 from 6:00am til 7:30am to conduct *live audible 3rd party test of=
the new E25 - 6th fl fir ealarm system</b>*. Any questions please contact =
Billy Homeyer x8-0432.</div>
<div> </div>
<div> </div>
<div>Thank you,</div>
<div> </div>
<div>Jennifer M. Garland</div>
<div>Repair and Maintenance</div>
<div>4-4350</div>
<div> </div>
<div>Type: Normal</div>
<div>Date: August 7, 2013//EXTENDED to include Wednesday, August 21, 2013</=
div>
<div>Day: Wednesday</div>
<div>Time: 6:00am - 7:30am</div>
<div>Building(s): E25</div>
<div>Room(s): 6th fl.</div>
<div>System: fire alarm</div>
<div>Duration: 6:00am - 7:30am</div>
<div>Reason: </div>
<div> </div>
<div>**<b>EXTENDED: </b><font color=3D"#1F497D"><b>We would like to extend =
the E25-all fire alarm shutdown from </b></font><font color=3D"#1F497D"><u>=
<b>6 AM to 7:30 AM</b></u></font><font color=3D"#1F497D"><b> on Wednesday, =
August 21</b></font><font size=3D"1" color=3D"#1F497D"><sup><b>st</b></sup>=
</font><font color=3D"#1F497D"><b>,
2013</b></font><font color=3D"#1F497D"><b> for JMBCo (Wayne Maginnis 617-21=
2-2059/Rich Cucchi 617-522-6800) to complete tie-in, programming and testin=
g the new speaker/strobes and exhaust fan HOA switches; and we will conduct=
a *</b></font><font color=3D"#1F497D"><b>live
audible 3</b></font><font size=3D"1" color=3D"#1F497D"><sup><b>rd</b></sup>=
</font><font color=3D"#1F497D"><b> party test of the new E25-6</b></font><f=
ont size=3D"1" color=3D"#1F497D"><sup><b>th</b></sup></font><font color=3D"=
#1F497D"><b> floor fire alarm system</b></font><font color=3D"#1F497D"><b>*
as part of the Prof. McGee lab cleanroom renovation project by DC Beane (Ry=
an Kucinski 617-997-9498). Both the shutdown request form and work or=
der #5206749 have been modified to reflect this extension on behalf of Bill=
y Homeyer</b></font><font color=3D"#1F497D">.**</font></div>
<div> </div>
<div>We request bldg E25-6th floor fire alarm shutdowns as follows;from 6 A=
M to 2 PM on Wednesday, August 7th, 2013, Simplex (Rich Perron 781-603-7799=
) will program HOA switches for the new exhaust fans and from 6 AM to 7:30 =
AM, we will conduct a *live audible
1st party test of the new E25-6th floor fire alarm devices*. On=
Thursday, August 8th, 2013 from 6 AM to 7:30 AM, JMBCo (Rich Cucchi =
617-522-6800) will conduct a *live audible 3rd party test of the E25-6th fl=
oor fire alarm system* as part of the Prof. McGee
lab cleanroom renovation project by DC Beane (Ryan Kucinski 617-997-9498).&=
nbsp; Biss Teelucksingh 2-5972 and Paul Murphy 4-6361 are the MIT project m=
anagers on behalf of Billy Homeyer.</div>
<div> </div>
<div>Effect: </div>
<div>Loss of fire alarms for the duration of this shutdown. </div>
<div> </div>
<div> </div>
</font>
</body>
</html>
--_000_4EEA516695C10541B7CB963FF54A56AF13C7DD218Ddofexchmbx01f_--