[171616] in Hotline Meeting
Emergency EXTENTION: Approved: Bldg. 38 - All - Chilled Water
daemon@ATHENA.MIT.EDU (Jennifer Garland)
Tue Aug 20 09:29:51 2013
From: Jennifer Garland <jennygar@plant.mit.edu>
To: "achow@mit.edu" <achow@mit.edu>,
"fletch1@EECS.MIT.EDU"
<fletch1@EECS.MIT.EDU>,
"sbleeb@mit.edu" <sbleeb@mit.edu>,
"OPS RM Campus
Services Main" <rm-mcs@mit.edu>,
"burkhart@mtl.mit.edu"
<burkhart@mtl.mit.edu>,
"diadiuk@mit.edu" <diadiuk@mit.edu>,
"mcgrath@mtl.mit.edu" <mcgrath@mtl.mit.edu>,
"agallant@mit.edu"
<agallant@mit.edu>,
"airyan@MIT.EDU" <airyan@mit.edu>,
MIT Schedules Office
<schedules@mit.edu>,
"jdaley@nano.mit.edu" <jdaley@nano.mit.edu>,
"wgibbs@rle.mit.edu" <wgibbs@rle.mit.edu>,
"amcgurl@RLE.MIT.EDU"
<amcgurl@rle.mit.edu>,
"mondol@mit.edu" <mondol@mit.edu>,
"heatherg@mit.edu"
<heatherg@mit.edu>,
"shutdowns@mit.edu" <shutdowns@mit.edu>,
"whomeyer@mit.edu" <whomeyer@mit.edu>,
"ksemerj@mit.edu" <ksemerj@mit.edu>,
Gary Saffie <gsaffie@plant.mit.edu>,
Ops RM Shutdown <rm-shutdown@mit.edu>, DOF EHS <dof-ehs@mit.edu>,
"cp-command@mit.edu" <cp-command@mit.edu>,
"safety@mit.edu" <safety@mit.edu>, Operators <Operators@plant.mit.edu>,
"DOF
Customer Service Center" <dof-csc@mit.edu>,
"Ops Custodial Admin & Support
Staff" <cust-staff@mit.edu>
CC: "jennygar@mit.edu" <jennygar@mit.edu>, "pisanin@mit.edu" <pisanin@mit.edu>
Date: Tue, 20 Aug 2013 09:29:42 -0400
Message-ID: <4EEA516695C10541B7CB963FF54A56AF13C7DD1E29@dof-exchmbx01.facilities.ms.mit.edu>
Content-Language: en-US
Content-Type: multipart/alternative;
boundary="_000_4EEA516695C10541B7CB963FF54A56AF13C7DD1E29dofexchmbx01f_"
MIME-Version: 1.0
--_000_4EEA516695C10541B7CB963FF54A56AF13C7DD1E29dofexchmbx01f_
Content-Type: text/plain; charset="us-ascii"
Content-Transfer-Encoding: quoted-printable
The following Emergency extention of the Approved Chilled Water shutdown (C=
yPress Design Eng Studio renovation project) is for bldg. 38 - All on Tuesd=
ay, August 20, 2013 from 4:00am til 11:00am is for your information. Any q=
uestions please contact Billy Homeyer x8-0432.
Thank you,
Jennifer M. Garland
Repair and Maintenance
4-4350
Type: Normal
Date: August 20, 2013
Day: Tuesday
Time: 4:00am 8:00am// Emergency extention til 11:00am
Building(s): 38
Room(s): All
System: chilled water, supply cooling
Duration: 4 hrs
Reason:
**Emergency Extention til 11:00am requested by contractors for further revi=
ew of system, per Billy Homeyer x8-0432.**
We request a bldg 38-partial chilled water shutdown from 4 AM to 8 AM on Tu=
esday morning, August 20th, 2013 for AHC Mechanical (Al Cairns 781-844-7817=
) to tie-in new fan coil unit service for the 5th floor from a main chilled=
water riser as part of the 5th floor CyPress Design Eng Studio project by =
Acella Construction (Marcilio Silva 781-733-1248). Nicole Pisani 5-5157 and=
Biss Teelucksingh 2-5972 are the MIT project managers.
AH1-bsmt, AH2-fls 1-6 north, AH3-fls 1-6 south, AH4-MBE Lab are not affecte=
d however 38-301 and any other equipment cooling will be affected. Bldg 38 =
fan coil units will also not be cooling during the shutdown. AH1, 2, 3 prov=
ide the overhead cooling from the diffusers in the ceilings.
Effect:
Loss of chilled water and supply cooling for the duration of this shutdown.
--_000_4EEA516695C10541B7CB963FF54A56AF13C7DD1E29dofexchmbx01f_
Content-Type: text/html; charset="us-ascii"
Content-Transfer-Encoding: quoted-printable
<html>
<head>
<meta http-equiv=3D"Content-Type" content=3D"text/html; charset=3Dus-ascii"=
>
<meta name=3D"Generator" content=3D"Microsoft Exchange Server">
<!-- converted from rtf -->
<style><!-- .EmailQuote { margin-left: 1pt; padding-left: 4pt; border-left:=
#800000 2px solid; } --></style>
</head>
<body>
<font face=3D"Calibri, sans-serif" size=3D"2">
<div>The following <b>Emergency</b> <b>e</b><b>xtention</b> of the Approved=
Chilled Water shutdown (CyPress Design Eng Studio renovation project) is f=
or bldg. 38 - All on <b>Tuesday, August 20, 2013 from 4:00am til </b><b>11<=
/b><b>:00am is for your information.</b>
Any questions please contact Billy Homeyer x8-0432.</div>
<div> </div>
<div> </div>
<div>Thank you,</div>
<div> </div>
<div>Jennifer M. Garland</div>
<div>Repair and Maintenance</div>
<div>4-4350</div>
<div> </div>
<div>Type: Normal</div>
<div>Date: August 20, 2013</div>
<div>Day: Tuesday</div>
<div>Time: 4:00am 8:00am// <b>Emergency extention</b><b> til 11:00am<=
/b></div>
<div>Building(s): 38</div>
<div>Room(s): All</div>
<div>System: chilled water, supply cooling</div>
<div>Duration: 4 hrs</div>
<div>Reason: </div>
<div>**<b>Emergency Extention til 11:00am requested by contractors for furt=
her review of system, per Billy Homeyer x8-0432.</b><b>**</b></div>
<div> </div>
<div> </div>
<div> </div>
<div>We request a bldg 38-partial chilled water shutdown from 4 AM to 8 AM =
on Tuesday morning, August 20th, 2013 for AHC Mechanical (Al Cairns 781-844=
-7817) to tie-in new fan coil unit service for the 5th floor from a main ch=
illed water riser as part of the
5th floor CyPress Design Eng Studio project by Acella Construction (Marcili=
o Silva 781-733-1248). Nicole Pisani 5-5157 and Biss Teelucksingh 2-5972 ar=
e the MIT project managers.</div>
<div> </div>
<div>AH1-bsmt, AH2-fls 1-6 north, AH3-fls 1-6 south, AH4-MBE Lab are not af=
fected however 38-301 and any other equipment cooling will be affected. Bld=
g 38 fan coil units will also not be cooling during the shutdown. AH1, 2, 3=
provide the overhead cooling from
the diffusers in the ceilings.</div>
<div> </div>
<div> </div>
<div>Effect: </div>
<div>Loss of chilled water and supply cooling for the duration of this shut=
down.</div>
<div> </div>
<div> </div>
</font>
</body>
</html>
--_000_4EEA516695C10541B7CB963FF54A56AF13C7DD1E29dofexchmbx01f_--