Bldg. 38 - All - Chilled Water Shutdown (CyPress Design Eng Studio renovation project)
daemon@ATHENA.MIT.EDU (shutdown-response@MIT.EDU)
Thu Aug 15 12:10:45 2013
From: shutdown-response@MIT.EDU
To: <undisclosed_recipients@MIT.EDU>
Cc: <jennygar@MIT.EDU>, <pisanin@MIT.EDU>
Date: Thu, 15 Aug 2013 12:10:40 -0400
Message-ID: <5538617AE6CB42D9BE99A30F4D573695@facilities.ms.mit.edu>
MIME-Version: 1.0
Content-Type: text/plain;
charset="iso-8859-1"
Content-Transfer-Encoding: 7bit
Content-Class: urn:content-classes:message
The following Chilled Water shutdown (CyPress Design Eng Studio renovation project) is for bldg. 38 - All on Tuesday, August 20, 2013 from 4:00am til 8:00am is for your information and approval. Any questions please contact Billy Homeyer x8-0432.
Would you please let us know if this does or does not have your approval.
Thank you,
Jennifer M. Garland
Repair and Maintenance
4-4350
Type: Normal
Date: August 20, 2013
Day: Tuesday
Time: 4:00am 8:00am
Building(s): 38
Room(s): All
System: chilled water, supply cooling
Duration: 4 hrs
Reason:
We request a bldg 38-partial chilled water shutdown from 4 AM to 8 AM on Tuesday morning, August 20th, 2013 for AHC Mechanical (Al Cairns 781-844-7817) to tie-in new fan coil unit service for the 5th floor from a main chilled water riser as part of the 5th floor CyPress Design Eng Studio project by Acella Construction (Marcilio Silva 781-733-1248). Nicole Pisani 5-5157 and Biss Teelucksingh 2-5972 are the MIT project managers.
AH1-bsmt, AH2-fls 1-6 north, AH3-fls 1-6 south, AH4-MBE Lab are not affected however 38-301 and any other equipment cooling will be affected. Bldg 38 fan coil units will also not be cooling during the shutdown. AH1, 2, 3 provide the overhead cooling from the diffusers in the ceilings.
Effect:
Loss of chilled water and supply cooling for the duration of this shutdown.