[171492] in Hotline Meeting
Approved - Bldg. 24 - 6th fl, 1st fl, 011, 0323 office/computer
daemon@ATHENA.MIT.EDU (Jennifer Garland)
Wed Aug 14 13:39:20 2013
From: Jennifer Garland <jennygar@plant.mit.edu>
To: "swade@mit.edu" <swade@MIT.EDU>, "craigp@MIT.EDU" <craigp@MIT.EDU>,
"sbleeb@mit.edu" <sbleeb@MIT.EDU>, "ramsay@mit.edu" <ramsay@MIT.EDU>,
"hbsweet@mit.edu" <hbsweet@MIT.EDU>,
OPS RM Campus Services Main
<rm-mcs@MIT.EDU>,
"opsnote@mit.edu" <opsnote@MIT.EDU>, "elk@MIT.EDU"
<elk@MIT.EDU>,
"diadiuk@mit.edu" <diadiuk@MIT.EDU>,
"mcgrath@mtl.mit.edu"
<mcgrath@mtl.mit.edu>,
"pbrenton@MIT.EDU" <pbrenton@MIT.EDU>,
"censabel@MIT.EDU" <censabel@MIT.EDU>,
"khewitt@mit.edu" <khewitt@MIT.EDU>, "elsye@MIT.EDU" <elsye@MIT.EDU>,
"cubstead@MIT.EDU" <cubstead@MIT.EDU>,
"cmodica@mit.edu" <cmodica@MIT.EDU>,
MIT Schedules Office
<schedules@MIT.EDU>,
"jdaley@nano.mit.edu" <jdaley@nano.mit.edu>,
"mondol@mit.edu" <mondol@MIT.EDU>,
"heatherg@mit.edu" <heatherg@MIT.EDU>,
"shutdowns@mit.edu" <shutdowns@MIT.EDU>,
"whomeyer@mit.edu"
<whomeyer@MIT.EDU>,
"ksemerj@mit.edu" <ksemerj@MIT.EDU>,
Steven Gilligan
<sgilliga@plant.mit.edu>,
"garysaffie@plant.mit.edu"
<garysaffie@plant.mit.edu>,
Ops RM Shutdown <rm-shutdown@MIT.EDU>, DOF EHS
<dof-ehs@MIT.EDU>,
"cp-command@mit.edu" <cp-command@MIT.EDU>,
"safety@mit.edu" <safety@MIT.EDU>, Operators <Operators@plant.mit.edu>,
"DOF
Customer Service Center" <dof-csc@MIT.EDU>,
"Ops Custodial Admin & Support
Staff" <cust-staff@MIT.EDU>
Date: Wed, 14 Aug 2013 13:39:12 -0400
Message-ID: <4EEA516695C10541B7CB963FF54A56AF13C69DEAFA@dof-exchmbx01.facilities.ms.mit.edu>
Content-Language: en-US
Content-Type: multipart/alternative;
boundary="_000_4EEA516695C10541B7CB963FF54A56AF13C69DEAFAdofexchmbx01f_"
MIME-Version: 1.0
--_000_4EEA516695C10541B7CB963FF54A56AF13C69DEAFAdofexchmbx01f_
Content-Type: text/plain; charset="us-ascii"
Content-Transfer-Encoding: quoted-printable
The following Approved Normal Building Power 208V/120V Shutdown is for bldg=
. 24 - all on Friday, August 16, 2013 from 12:01am til 6:00am is for your i=
nformation. Any questions please contact Billy Homeyer x8-0432.
Thank you,
Jennifer M. Garland
Repair and Maintenance
4-4350
Type: Normal
Date: August 13, 2013/// DATE CHANGED: August 16, 2013
Day: Tuesday// FRIDAY
Time: 12:01am - 6:00am
Building(s): 24
Room(s): All
System: normal building power, access controls, computers, telephones, ligh=
ting, chilled water, heating hot water, supply vent/cooling/heating, gen ex=
haust/hood exhaust
Duration: 12:01am - 6:00am - 6 hrs
Reason:
*** Dear all, this bldg 24-DP1 normal 208V/120V power shutdown has been res=
cheduled. We will conduct the shutdown from 12:01 AM to 6 AM on this coming=
Friday morning, August 16th, bldg 24 - 6th fl. 1st fl all, 011, 032 office=
/computer sute, bsmt hallway. Both the shutdown form and work order 520726=
7 have been modified to reflect the new date and thank you, Billy H. 8-0432=
.***
We request bldg 24-DP1 normal 208V/120V bldg power shutdown from 12:01 AM t=
o 6 AM on Tuesday morning, August 13th, 2013 for Bennett Electric to instal=
l a 125A circuit breaker in DP1 and tie-in power for a new 24-114 computer =
power panel as part of the 24-4th floor LNS renovation project by Barr and =
Barr Builders (John Bidgood 508-686-0870). Sudy Nally 8-8010 and Jennifer C=
ombs 3-7671 are the MIT project managers.
DP1 feeds the following panels/equipment
The bldg 24-elevator
Normal power to the telephone switch room (ATS will switch to the emergency=
power)
6th floor power panels CP6-2 and CP6-3; all of 6th floor affected
Ground and 1st floor panels CP0-1 and CP1-1; Ground floor hallway outlets/l=
ighting (includes the soda and snack machines) and all of the 1st floor
24-032 panel P-032-B-1; all the 24-032 computer power
24-011 panel P-011; all the power to grad student office 011
Ground floor panel CP0-1; also serves some power in 032 suite offices and s=
ome hallway power
Effect:
Loss of all normal building power for the duration of this shutdown.
--_000_4EEA516695C10541B7CB963FF54A56AF13C69DEAFAdofexchmbx01f_
Content-Type: text/html; charset="us-ascii"
Content-Transfer-Encoding: quoted-printable
<html>
<head>
<meta http-equiv=3D"Content-Type" content=3D"text/html; charset=3Dus-ascii"=
>
<meta name=3D"Generator" content=3D"Microsoft Exchange Server">
<!-- converted from rtf -->
<style><!-- .EmailQuote { margin-left: 1pt; padding-left: 4pt; border-left:=
#800000 2px solid; } --></style>
</head>
<body>
<font face=3D"Calibri, sans-serif" size=3D"2">
<div>The following <font color=3D"#1F497D">Approved </font>Normal Building =
Power 208V/120V Shutdown is for bldg. 24 - all on <font color=3D"#1F497D"><=
b>Friday, August 16, 2013</b></font><b> from 12:01am til 6:00am</b> is for =
your <b>information</b>. Any questions
please contact Billy Homeyer x8-0432.</div>
<div> </div>
<div><font color=3D"#1F497D"> </font></div>
<div>Thank you,</div>
<div> </div>
<div> </div>
<div>Jennifer M. Garland</div>
<div>Repair and Maintenance</div>
<div>4-4350</div>
<div> </div>
<div>Type: Normal</div>
<div>Date: August 13, 2013/// <font color=3D"#1F497D"><b>DATE CHANGED: =
; August 16, 2013</b></font></div>
<div>Day: Tuesday<b>// </b><font color=3D"#1F497D"><b>FRIDAY</b></font></di=
v>
<div>Time: 12:01am - 6:00am</div>
<div>Building(s): 24</div>
<div>Room(s): All</div>
<div>System: normal building power, access controls, computers, telephones,=
lighting, chilled water, heating hot water, supply vent/cooling/heating, g=
en exhaust/hood exhaust</div>
<div>Duration: 12:01am - 6:00am - 6 hrs</div>
<div>Reason: </div>
<div><font color=3D"#1F497D"> </font></div>
<div><font color=3D"#1F497D">*** Dear all, this bldg 24-DP1 normal 208V/120=
V power shutdown has been rescheduled. We will conduct the shutdown from 12=
:01 AM to 6 AM on this coming Friday morning, August 16<font size=3D"1"><su=
p>th</sup></font><font size=3D"1"><sup>,
</sup></font>bldg 24 – 6<font size=3D"1"><sup>th</sup></font> fl. 1<f=
ont size=3D"1"><sup>st</sup></font> fl all, 011, 032 office/computer sute, =
bsmt hallway. Both the shutdown form and work order 5207267 have been=
modified to reflect the new date and thank you,
Billy H. 8-0432.***</font></div>
<div><font color=3D"#1F497D"> </font></div>
<div>We request bldg 24-DP1 normal 208V/120V bldg power shutdown from 12:01=
AM to 6 AM on Tuesday morning, August 13th, 2013 for Bennett Electric to i=
nstall a 125A circuit breaker in DP1 and tie-in power for a new 24-114 comp=
uter power panel as part of the
24-4th floor LNS renovation project by Barr and Barr Builders (John Bidgood=
508-686-0870). Sudy Nally 8-8010 and Jennifer Combs 3-7671 are the MIT pro=
ject managers.</div>
<div>DP1 feeds the following panels/equipment</div>
<div> </div>
<div>The bldg 24-elevator</div>
<div> </div>
<div>Normal power to the telephone switch room (ATS will switch to the emer=
gency power) </div>
<div> </div>
<div>6th floor power panels CP6-2 and CP6-3; all of 6th floor affected</div=
>
<div> </div>
<div>Ground and 1st floor panels CP0-1 and CP1-1; Ground floor hallway outl=
ets/lighting (includes the soda and snack machines) and all of the 1st floo=
r</div>
<div> </div>
<div>24-032 panel P-032-B-1; all the 24-032 computer power</div>
<div> </div>
<div>24-011 panel P-011; all the power to grad student office 011</div>
<div> </div>
<div>Ground floor panel CP0-1; also serves some power in 032 suite offices =
and some hallway power</div>
<div> </div>
<div> </div>
<div>Effect: </div>
<div>Loss of all normal building power for the duration of this shutdown. <=
/div>
<div> </div>
<div> </div>
</font>
</body>
</html>
--_000_4EEA516695C10541B7CB963FF54A56AF13C69DEAFAdofexchmbx01f_--