NEED APPROVAL - Bldg. 24 - All Normal Building Power 208V/120V

daemon@ATHENA.MIT.EDU (Jennifer Garland)
Tue Aug 13 14:11:19 2013

From: Jennifer Garland <jennygar@plant.mit.edu>
To: "swade@mit.edu" <swade@mit.edu>, "craigp@MIT.EDU" <craigp@mit.edu>,
        "sbleeb@mit.edu" <sbleeb@mit.edu>, "ramsay@mit.edu" <ramsay@mit.edu>,
        "hbsweet@mit.edu" <hbsweet@mit.edu>,
        OPS RM Campus Services Main
	<rm-mcs@mit.edu>,
        "opsnote@mit.edu" <opsnote@mit.edu>, "elk@MIT.EDU"
	<elk@mit.edu>,
        "diadiuk@mit.edu" <diadiuk@mit.edu>,
        "mcgrath@mtl.mit.edu"
	<mcgrath@mtl.mit.edu>,
        "pbrenton@MIT.EDU" <pbrenton@mit.edu>,
        "censabel@MIT.EDU" <censabel@mit.edu>,
        "khewitt@mit.edu" <khewitt@mit.edu>, "elsye@MIT.EDU" <elsye@mit.edu>,
        "cubstead@MIT.EDU" <cubstead@mit.edu>,
        "cmodica@mit.edu" <cmodica@mit.edu>,
        MIT Schedules Office
	<schedules@mit.edu>,
        "jdaley@nano.mit.edu" <jdaley@nano.mit.edu>,
        "mondol@mit.edu" <mondol@mit.edu>,
        "heatherg@mit.edu" <heatherg@mit.edu>,
        "shutdowns@mit.edu" <shutdowns@mit.edu>,
        "whomeyer@mit.edu"
	<whomeyer@mit.edu>,
        "ksemerj@mit.edu" <ksemerj@mit.edu>,
        Steven Gilligan
	<sgilliga@plant.mit.edu>,
        "garysaffie@plant.mit.edu"
	<garysaffie@plant.mit.edu>
Date: Tue, 13 Aug 2013 14:11:12 -0400
Message-ID: <4EEA516695C10541B7CB963FF54A56AF13C69DE533@dof-exchmbx01.facilities.ms.mit.edu>
Content-Language: en-US
Content-Type: multipart/alternative;
	boundary="_000_4EEA516695C10541B7CB963FF54A56AF13C69DE533dofexchmbx01f_"
MIME-Version: 1.0

--_000_4EEA516695C10541B7CB963FF54A56AF13C69DE533dofexchmbx01f_
Content-Type: text/plain; charset="us-ascii"
Content-Transfer-Encoding: quoted-printable

The following UPDATED Normal Building Power 208V/120V Shutdown is for bldg.=
 24 - all on Friday, August 16, 2013 from 12:01am til 6:00am is for your in=
formation and approval.  Any questions please contact Billy Homeyer x8-0432=
.

Would you please let us know if this does or does not have your approval.

Thank you,


Jennifer M. Garland
Repair and Maintenance
4-4350

Type: Normal
Date: August 13, 2013/// DATE CHANGED:  August 16, 2013
Day: Tuesday// FRIDAY
Time: 12:01am - 6:00am
Building(s): 24
Room(s): All
System: normal building power, access controls, computers, telephones, ligh=
ting, chilled water, heating hot water, supply vent/cooling/heating, gen ex=
haust/hood exhaust
Duration: 12:01am - 6:00am - 6 hrs
Reason:

*** Dear all, this bldg 24-DP1 normal 208V/120V power shutdown has been res=
cheduled. We will conduct the shutdown from 12:01 AM to 6 AM on this coming=
 Friday morning, August 16th.  Both the shutdown form and work order 520726=
7 have been modified to reflect the new date and thank you, Billy H. 8-0432=
.***



We request bldg 24-DP1 normal 208V/120V bldg power shutdown from 12:01 AM t=
o 6 AM on Tuesday morning, August 13th, 2013 for Bennett Electric to instal=
l a 125A circuit breaker in DP1 and tie-in power for a new 24-114 computer =
power panel as part of the 24-4th floor LNS renovation project by Barr and =
Barr Builders (John Bidgood 508-686-0870). Sudy Nally 8-8010 and Jennifer C=
ombs 3-7671 are the MIT project managers.
DP1 feeds the following panels/equipment

The bldg 24-elevator

Normal power to the telephone switch room (ATS will switch to the emergency=
 power)

6th floor power panels CP6-2 and CP6-3; all of 6th floor affected

Ground and 1st floor panels CP0-1 and CP1-1; Ground floor hallway outlets/l=
ighting (includes the soda and snack machines) and all of the 1st floor

24-032 panel P-032-B-1; all the 24-032 computer power

24-011 panel P-011; all the power to grad student office 011

Ground floor panel CP0-1; also serves some power in 032 suite offices and s=
ome hallway power


Effect:
Loss of all normal building power for the duration of this shutdown.



--_000_4EEA516695C10541B7CB963FF54A56AF13C69DE533dofexchmbx01f_
Content-Type: text/html; charset="us-ascii"
Content-Transfer-Encoding: quoted-printable

<html>
<head>
<meta http-equiv=3D"Content-Type" content=3D"text/html; charset=3Dus-ascii"=
>
<meta name=3D"Generator" content=3D"Microsoft Exchange Server">
<!-- converted from rtf -->
<style><!-- .EmailQuote { margin-left: 1pt; padding-left: 4pt; border-left:=
 #800000 2px solid; } --></style>
</head>
<body>
<font face=3D"Calibri, sans-serif" size=3D"2">
<div>The following <font color=3D"#1F497D"><b>UPDATED</b></font><b> </b>Nor=
mal Building Power 208V/120V Shutdown is for bldg. 24 - all on <font color=
=3D"#1F497D"><b>Friday, August 16, 2013</b></font><b> from 12:01am til 6:00=
am</b> is for your <b>information</b><font color=3D"#1F497D"><b>
and approval</b></font>.&nbsp; Any questions please contact Billy Homeyer x=
8-0432.</div>
<div>&nbsp;</div>
<div><font color=3D"#1F497D"><b>Would you please let us know if this does o=
r does not have your approval.</b></font></div>
<div><font color=3D"#1F497D">&nbsp;</font></div>
<div>Thank you,</div>
<div>&nbsp;</div>
<div>&nbsp;</div>
<div>Jennifer M. Garland</div>
<div>Repair and Maintenance</div>
<div>4-4350</div>
<div>&nbsp;</div>
<div>Type: Normal</div>
<div>Date: August 13, 2013/// <font color=3D"#1F497D"><b>DATE CHANGED:&nbsp=
; August 16, 2013</b></font></div>
<div>Day: Tuesday<b>// </b><font color=3D"#1F497D"><b>FRIDAY</b></font></di=
v>
<div>Time: 12:01am - 6:00am</div>
<div>Building(s): 24</div>
<div>Room(s): All</div>
<div>System: normal building power, access controls, computers, telephones,=
 lighting, chilled water, heating hot water, supply vent/cooling/heating, g=
en exhaust/hood exhaust</div>
<div>Duration: 12:01am - 6:00am - 6 hrs</div>
<div>Reason: </div>
<div><font color=3D"#1F497D">&nbsp;</font></div>
<div><font face=3D"Calibri, sans-serif" color=3D"#1F497D">***<font face=3D"=
Calibri, sans-serif"> </font><font face=3D"Calibri, sans-serif">Dear all, t=
his bldg 24-DP1 normal 208V/120V power shutdown has been rescheduled. We wi=
ll conduct the shutdown from 12:01 AM to
6 AM on this coming Friday morning, August 16</font><font face=3D"Calibri, =
sans-serif" size=3D"1"><sup>th</sup></font><font face=3D"Calibri, sans-seri=
f">.&nbsp; Both the shutdown form and work order 5207267 have been modified=
 to reflect the new date and thank you, Billy
H. 8-0432</font><font face=3D"Calibri, sans-serif">.***</font></font></div>
<div><font color=3D"#1F497D">&nbsp;</font></div>
<div><font color=3D"#1F497D">&nbsp;</font></div>
<div><font color=3D"#1F497D">&nbsp;</font></div>
<div>We request bldg 24-DP1 normal 208V/120V bldg power shutdown from 12:01=
 AM to 6 AM on Tuesday morning, August 13th, 2013 for Bennett Electric to i=
nstall a 125A circuit breaker in DP1 and tie-in power for a new 24-114 comp=
uter power panel as part of the
24-4th floor LNS renovation project by Barr and Barr Builders (John Bidgood=
 508-686-0870). Sudy Nally 8-8010 and Jennifer Combs 3-7671 are the MIT pro=
ject managers.</div>
<div>DP1 feeds the following panels/equipment</div>
<div>&nbsp;</div>
<div>The bldg 24-elevator</div>
<div>&nbsp;</div>
<div>Normal power to the telephone switch room (ATS will switch to the emer=
gency power) </div>
<div>&nbsp;</div>
<div>6th floor power panels CP6-2 and CP6-3; all of 6th floor affected</div=
>
<div>&nbsp;</div>
<div>Ground and 1st floor panels CP0-1 and CP1-1; Ground floor hallway outl=
ets/lighting (includes the soda and snack machines) and all of the 1st floo=
r</div>
<div>&nbsp;</div>
<div>24-032 panel P-032-B-1; all the 24-032 computer power</div>
<div>&nbsp;</div>
<div>24-011 panel P-011; all the power to grad student office 011</div>
<div>&nbsp;</div>
<div>Ground floor panel CP0-1; also serves some power in 032 suite offices =
and some hallway power</div>
<div>&nbsp;</div>
<div>&nbsp;</div>
<div>Effect: </div>
<div>Loss of all normal building power for the duration of this shutdown. <=
/div>
<div>&nbsp;</div>
<div>&nbsp;</div>
</font>
</body>
</html>

--_000_4EEA516695C10541B7CB963FF54A56AF13C69DE533dofexchmbx01f_--

home help back first fref pref prev next nref lref last post