[171403] in Hotline Meeting

home help back first fref pref prev next nref lref last post

Approved Shutdowns for Friday, August 9, 2013

daemon@ATHENA.MIT.EDU (Jennifer Garland)
Thu Aug 8 15:01:14 2013

From: Jennifer Garland <jennygar@plant.mit.edu>
To: "shutdowns@mit.edu" <shutdowns@mit.edu>
Date: Thu, 8 Aug 2013 15:01:10 -0400
Message-ID: <4EEA516695C10541B7CB963FF54A56AF13C687EBC5@dof-exchmbx01.facilities.ms.mit.edu>
Content-Language: en-US
Content-Type: multipart/alternative;
	boundary="_000_4EEA516695C10541B7CB963FF54A56AF13C687EBC5dofexchmbx01f_"
MIME-Version: 1.0

--_000_4EEA516695C10541B7CB963FF54A56AF13C687EBC5dofexchmbx01f_
Content-Type: text/plain; charset="us-ascii"
Content-Transfer-Encoding: quoted-printable

W.O. SAP: 5201199 - bldg. W20 - basement kitchen exhaust fan shutdown for t=
emporary removal of fan in prep for demo of W20-AH3 is on Wednesday, July 1=
7, 2013 at 6:00am - til Wednesday, August 14, 2013. Any questions please co=
ntact Billy Homeyer x8-0432.

W.O. SAP: 5206189 Bldg. E34 - All Heating Hot Water Shutdown is on Friday, =
August 9, 2013 from 5:00am - 8:00am, for AHC to tie in (2) fan coil units. =
 Any questions please contact Billy Homeyer x8-0432.

W.O. #5197859, Bldg. 46 - All, Normal Building Power, refeed MRI power, Thu=
rsday, August 8, 2013, 10:00pm through 6:00am Friday, August 9, 2013.  Cont=
act Sudy Nally, x8-8010.

W.O.#5188163, Bldg. W20-019, Fan Exhaust Hood #703521, This hood will not b=
e used during construction period, starting Thursday, May 23, 2013 @ 12:00p=
m through Friday, August 16, 2013 @ 3:00pm. Contact Billy Homeyer x8-0432.

W.O. SAP: 5204362  Bldg. 1-All - Fire Alarm Shutdown/3rd Party Live Audible=
 Testing to conduct live audible  testing of bldg. 1 fire alarm system on S=
unday, August 4, 2013 from 11:00pm til Friday, August 9, 2013 at 7:00am.  A=
ny questions please contact Billy Homeyer x8-0432.

W/O# 5206333, Bldg.7-301, 303 & 307, Fire Alarm with /*brief live audible t=
est on 8/9 is to install temporary heat detectors, to test & program remove=
d & installed temp heats, Thursday, August 8, 2013 from 6:00am-8:00am and F=
riday, August 9, 2013 from 6:00am - 7:00am, Contact Billy Homeyer 8-0432.

W/O# 5205976, Bldg.26-All, Smoke Detectors, for construction dust and all g=
eneral construction-related activities, Monday, August 5, 2013 through Frid=
ay, September 27, 2013 (regular work days only) from 5:00am-2:00pm, Contact=
 Billy Homeyer 8-0432.

W.O. #5203624, Bldg. W71-Entire Building, Smoke Detectors, Window replaceme=
nt and painting, Monday, July 29, 2013 through Friday, August 16, 2013 from=
 7am to 3pm (regular work days),  Contact M. Whelan @ 3-4324.

W/O# 5206380, Bldg.3-309, Fire Protection Water, to remove existing and to =
install new sprinkler heads, Thursday, August 8, 2013 and Friday, August 9,=
 2013 from 6:00am-2:00pm, Contact Billy Homeyer 8-0432.

W.O. #5203545, Bldg.NW86-5th Floor, Smoke Detectors, painting and floor san=
ding, Tuesday, July 23, 2013 through Friday, August 2, 2013 (regular work d=
ays only) from 7:00am-3:00pm, Contact Marsha Whelan 3-4324.

W.O.# 5194928, Bldg.NW61-All Random Hall, Smoke Detectors, for construction=
 dust and all general construction-related activities, Wednesday, June 19, =
2013 through Wednesday, August 14, 2013 (regular work days only, excluding =
MIT holiday July 4th) from 6:00am-2:00pm, Contact Billy Homeyer 8-0432.

W.O. #5191434, Bldg.W61-G-Entry 2nd floor, Smoke Detectors, Area Director A=
pt. Reno, Wednesday, June 12, 2013 through Friday, August 30, 2013 (regular=
 work days only) from 6:00am-6:00pm,  Contact Marsha Whelan 3-4324.

W.O. #5194066, Bldg.W7-5th&6th floors, Smoke Detectors, area director apt. =
reno, Wednesday, June 12, 2013 through Friday, August 30, 2013 (regular wor=
k days only) from 6:00am-6:00pm,  Contact Marsha Whelan 3-4324.

W.O. #5197028: Bldg.W1-1st, 2nd & Ground floors, Smoke Detectors, to replac=
e flooring in the dining area, Monday, July 3, 2013 through Thursday, Augus=
t 15, 2013 (regular work days only) from 6:00AM - 3:00PM, contact Billy Hom=
eyer 8-0432.

W.O.# 5205766, Bldg.7-Rooms 301, 303 & 307, Fire Protection Water, as a pre=
cautionary measure for demolition & removing of ceiling, Thursday, August 1=
, 2013 through Friday, August 16, 2013 (including Saturday 8/10 but not 8/3=
) from 6:00am-2:00pm,  Contact Billy Homeyer 8-0432.

W/O# 5206406, Bldg.N9-101, Fire Alarm, removal of equipment that may set of=
f beam detector, Thursday, August 8, 2013 and Friday, August 9, 2013 from 6=
:00am-3:30pm, Contact Billy Homeyer 8-0432.

W.O.# 5201093, Bldg.W20-Basement/4th Floor, Smoke Detectors, for constructi=
on dust and all general construction-related activities, Thursday, August 1=
, 2013 through Friday, August 30, 2013 (including Saturdays) from 6:00am-4:=
00pm,  Contact Billy Homeyer 8-0432.

W.O. #5201760, Bldg.4-South, Smoke Detectors, for construction dust and all=
 general construction-related activities, Tuesday, July 16, 2013 through Fr=
iday, August 30, 2013 (regular work days only) from 6:00am-2:00pm, Contact =
Billy Homeyer 8-0432.

W.O. #5202274, Bldg.24-4th Floor, Smoke Detectors, for construction dust an=
d all general construction-related activities, Thursday, July 18, 2013 thro=
ugh Friday, August 23, 2013 (regular work days only) from 5:00am-2:00pm, Co=
ntact Billy Homeyer 8-0432.

W.O. # 5204471 Bldg. 62 - 5th Floor Smoke Detectors, Demolition of plaster =
ceiling, construction dust, Monday, July 29 thru Wednesday August 14, 2013,=
 from 6:00am-10:30pm, regular work days except for Saturday, August 3, 2013=
 and Saturday, August, 10, 2013 as well as Sunday, August 11, 2013 from 7:0=
0am-3:30pm, Contact Billy Homeyer X.8-0432.

W/O# 5205991, Bldg.W13-All, Smoke Detectors, demolition of plaster walls an=
d ceiling, Friday, August 2, 2013 through Friday, August 9, 2013 (regular w=
ork days only) from 6:00am-4:00pm, Contact Billy Homeyer 8-0432.

W/O# 5205961, Bldg.24-4th Floor, Fire Protection Water, to modify sprinkler=
 system & add new sprinkler heads, 6 AM on Friday, August 2nd and to restor=
e back at 6 AM on Friday, August 30th, 2013, Contact Billy Homeyer 8-0432.

W/O# 5204085, Bldg.W31-Basement, Fire Protection Water, to remove existing =
sprinkler & install new valves and sprinkler heads, Wednesday, August 7, 20=
13 through Friday, August 9, 2013 from 6:00am-2:00pm, Contact Billy Homeyer=
 8-0432.


--_000_4EEA516695C10541B7CB963FF54A56AF13C687EBC5dofexchmbx01f_
Content-Type: text/html; charset="us-ascii"
Content-Transfer-Encoding: quoted-printable

<html xmlns:v=3D"urn:schemas-microsoft-com:vml" xmlns:o=3D"urn:schemas-micr=
osoft-com:office:office" xmlns:w=3D"urn:schemas-microsoft-com:office:word" =
xmlns:m=3D"http://schemas.microsoft.com/office/2004/12/omml" xmlns=3D"http:=
//www.w3.org/TR/REC-html40"><head><meta http-equiv=3DContent-Type content=
=3D"text/html; charset=3Dus-ascii"><meta name=3DGenerator content=3D"Micros=
oft Word 14 (filtered medium)"><style><!--
/* Font Definitions */
@font-face
	{font-family:Calibri;
	panose-1:2 15 5 2 2 2 4 3 2 4;}
/* Style Definitions */
p.MsoNormal, li.MsoNormal, div.MsoNormal
	{margin:0in;
	margin-bottom:.0001pt;
	font-size:11.0pt;
	font-family:"Calibri","sans-serif";}
a:link, span.MsoHyperlink
	{mso-style-priority:99;
	color:blue;
	text-decoration:underline;}
a:visited, span.MsoHyperlinkFollowed
	{mso-style-priority:99;
	color:purple;
	text-decoration:underline;}
span.EmailStyle17
	{mso-style-type:personal-compose;
	font-family:"Calibri","sans-serif";
	color:windowtext;}
.MsoChpDefault
	{mso-style-type:export-only;
	font-family:"Calibri","sans-serif";}
@page WordSection1
	{size:8.5in 11.0in;
	margin:1.0in 1.0in 1.0in 1.0in;}
div.WordSection1
	{page:WordSection1;}
--></style><!--[if gte mso 9]><xml>
<o:shapedefaults v:ext=3D"edit" spidmax=3D"1026" />
</xml><![endif]--><!--[if gte mso 9]><xml>
<o:shapelayout v:ext=3D"edit">
<o:idmap v:ext=3D"edit" data=3D"1" />
</o:shapelayout></xml><![endif]--></head><body lang=3DEN-US link=3Dblue vli=
nk=3Dpurple><div class=3DWordSection1><p class=3DMsoNormal>W.O. SAP: 520119=
9 &#8211; bldg. W20 &#8211; basement kitchen exhaust fan shutdown for tempo=
rary removal of fan in prep for demo of W20-AH3 is on Wednesday, July 17, 2=
013 at 6:00am &#8211; til Wednesday, August 14, 2013. Any questions please =
contact Billy Homeyer x8-0432.<o:p></o:p></p><p class=3DMsoNormal><o:p>&nbs=
p;</o:p></p><p class=3DMsoNormal>W.O. SAP: 5206189 Bldg. E34 &#8211; All He=
ating Hot Water Shutdown is on Friday, August 9, 2013 from 5:00am &#8211; 8=
:00am, for AHC to tie in (2) fan coil units.&nbsp; Any questions please con=
tact Billy Homeyer x8-0432.<o:p></o:p></p><p class=3DMsoNormal><o:p>&nbsp;<=
/o:p></p><p class=3DMsoNormal>W.O. #5197859, Bldg. 46 &#8211; All, Normal B=
uilding Power, refeed MRI power, Thursday, August 8, 2013, 10:00pm through =
6:00am Friday, August 9, 2013.&nbsp; Contact Sudy Nally, x8-8010.<o:p></o:p=
></p><p class=3DMsoNormal><o:p>&nbsp;</o:p></p><p class=3DMsoNormal>W.O.#51=
88163, Bldg. W20-019, Fan Exhaust Hood #703521, This hood will not be used =
during construction period, starting Thursday, May 23, 2013 @ 12:00pm throu=
gh Friday, August 16, 2013 @ 3:00pm. Contact Billy Homeyer x8-0432.<o:p></o=
:p></p><p class=3DMsoNormal><o:p>&nbsp;</o:p></p><p class=3DMsoNormal>W.O. =
SAP: 5204362&nbsp; Bldg. 1-All &#8211; Fire Alarm Shutdown/3<sup>rd</sup> P=
arty Live Audible Testing to conduct live audible&nbsp; testing of bldg. 1 =
fire alarm system on Sunday, August 4, 2013 from 11:00pm til Friday, August=
 9, 2013 at 7:00am.&nbsp; Any questions please contact Billy Homeyer x8-043=
2.<o:p></o:p></p><p class=3DMsoNormal><o:p>&nbsp;</o:p></p><p class=3DMsoNo=
rmal>W/O# 5206333, Bldg.7-301, 303 &amp; 307, Fire Alarm with /*brief live =
audible test on 8/9 is to install temporary heat detectors, to test &amp; p=
rogram removed &amp; installed temp heats, Thursday, August 8, 2013 from 6:=
00am-8:00am and Friday, August 9, 2013 from 6:00am &#8211; 7:00am, Contact =
Billy Homeyer 8-0432.<o:p></o:p></p><p class=3DMsoNormal><o:p>&nbsp;</o:p><=
/p><p class=3DMsoNormal>W/O# 5205976, Bldg.26-All, Smoke Detectors, for con=
struction dust and all general construction-related activities, Monday, Aug=
ust 5, 2013 through Friday, September 27, 2013 (regular work days only) fro=
m 5:00am-2:00pm, Contact Billy Homeyer 8-0432.<o:p></o:p></p><p class=3DMso=
Normal><o:p>&nbsp;</o:p></p><p class=3DMsoNormal>W.O. #5203624, Bldg. W71-E=
ntire Building, Smoke Detectors, Window replacement and painting, Monday, J=
uly 29, 2013 through Friday, August 16, 2013 from 7am to 3pm (regular work =
days),&nbsp; Contact M. Whelan @ 3-4324.<o:p></o:p></p><p class=3DMsoNormal=
><o:p>&nbsp;</o:p></p><p class=3DMsoNormal>W/O# 5206380, Bldg.3-309, Fire P=
rotection Water, to remove existing and to install new sprinkler heads, Thu=
rsday, August 8, 2013 and Friday, August 9, 2013 from 6:00am-2:00pm, Contac=
t Billy Homeyer 8-0432.<o:p></o:p></p><p class=3DMsoNormal><o:p>&nbsp;</o:p=
></p><p class=3DMsoNormal>W.O. #5203545, Bldg.NW86-5<sup>th</sup> Floor, Sm=
oke Detectors, painting and floor sanding, Tuesday, July 23, 2013 through F=
riday, August 2, 2013 (regular work days only) from 7:00am-3:00pm, Contact =
Marsha Whelan 3-4324.<o:p></o:p></p><p class=3DMsoNormal><o:p>&nbsp;</o:p><=
/p><p class=3DMsoNormal>W.O.# 5194928, Bldg.NW61-All Random Hall, Smoke Det=
ectors, for construction dust and all general construction-related activiti=
es, Wednesday, June 19, 2013 through Wednesday, August 14, 2013 (regular wo=
rk days only, excluding MIT holiday July 4<sup>th</sup>) from 6:00am-2:00pm=
, Contact Billy Homeyer 8-0432.<o:p></o:p></p><p class=3DMsoNormal><o:p>&nb=
sp;</o:p></p><p class=3DMsoNormal>W.O. #5191434, Bldg.W61-G-Entry 2<sup>nd<=
/sup> floor, Smoke Detectors, Area Director Apt. Reno, Wednesday, June 12, =
2013 through Friday, August 30, 2013 (regular work days only) from 6:00am-6=
:00pm,&nbsp; Contact Marsha Whelan 3-4324.<o:p></o:p></p><p class=3DMsoNorm=
al><o:p>&nbsp;</o:p></p><p class=3DMsoNormal>W.O. #5194066, Bldg.W7-5<sup>t=
h</sup>&amp;6<sup>th</sup> floors, Smoke Detectors, area director apt. reno=
, Wednesday, June 12, 2013 through Friday, August 30, 2013 (regular work da=
ys only) from 6:00am-6:00pm,&nbsp; Contact Marsha Whelan 3-4324.<o:p></o:p>=
</p><p class=3DMsoNormal><o:p>&nbsp;</o:p></p><p class=3DMsoNormal>W.O. #51=
97028: Bldg.W1-1<sup>st</sup>, 2<sup>nd</sup> &amp; Ground floors, Smoke De=
tectors, to replace flooring in the dining area, Monday, July 3, 2013 throu=
gh Thursday, August 15, 2013 (regular work days only) from 6:00AM &#8211; 3=
:00PM, contact Billy Homeyer 8-0432.<o:p></o:p></p><p class=3DMsoNormal><o:=
p>&nbsp;</o:p></p><p class=3DMsoNormal>W.O.# 5205766, Bldg.7-Rooms 301, 303=
 &amp; 307, Fire Protection Water, as a precautionary measure for demolitio=
n &amp; removing of ceiling, Thursday, August 1, 2013 through Friday, Augus=
t 16, 2013 (including Saturday 8/10 but not 8/3) from 6:00am-2:00pm,&nbsp; =
Contact Billy Homeyer 8-0432.<o:p></o:p></p><p class=3DMsoNormal><o:p>&nbsp=
;</o:p></p><p class=3DMsoNormal>W/O# 5206406, Bldg.N9-101, Fire Alarm, remo=
val of equipment that may set off beam detector, Thursday, August 8, 2013 a=
nd Friday, August 9, 2013 from 6:00am-3:30pm, Contact Billy Homeyer 8-0432.=
<o:p></o:p></p><p class=3DMsoNormal><o:p>&nbsp;</o:p></p><p class=3DMsoNorm=
al>W.O.# 5201093, Bldg.W20-Basement/4<sup>th</sup> Floor, Smoke Detectors, =
for construction dust and all general construction-related activities, Thur=
sday, August 1, 2013 through Friday, August 30, 2013 (including Saturdays) =
from 6:00am-4:00pm,&nbsp; Contact Billy Homeyer 8-0432.<o:p></o:p></p><p cl=
ass=3DMsoNormal><o:p>&nbsp;</o:p></p><p class=3DMsoNormal>W.O. #5201760, Bl=
dg.4-South, Smoke Detectors, for construction dust and all general construc=
tion-related activities, Tuesday, July 16, 2013 through Friday, August 30, =
2013 (regular work days only) from 6:00am-2:00pm, Contact Billy Homeyer 8-0=
432.<o:p></o:p></p><p class=3DMsoNormal><o:p>&nbsp;</o:p></p><p class=3DMso=
Normal>W.O. #5202274, Bldg.24-4<sup>th</sup> Floor, Smoke Detectors, for co=
nstruction dust and all general construction-related activities, Thursday, =
July 18, 2013 through Friday, August 23, 2013 (regular work days only) from=
 5:00am-2:00pm, Contact Billy Homeyer 8-0432.<o:p></o:p></p><p class=3DMsoN=
ormal><o:p>&nbsp;</o:p></p><p class=3DMsoNormal>W.O. # 5204471 Bldg. 62 - 5=
th Floor Smoke Detectors, Demolition of plaster ceiling, construction dust,=
 Monday, July 29 thru Wednesday August 14, 2013, from 6:00am-10:30pm, regul=
ar work days except for Saturday, August 3, 2013 and Saturday, August, 10, =
2013 as well as Sunday, August 11, 2013 from 7:00am-3:30pm, Contact Billy H=
omeyer X.8-0432.<o:p></o:p></p><p class=3DMsoNormal><o:p>&nbsp;</o:p></p><p=
 class=3DMsoNormal>W/O# 5205991, Bldg.W13-All, Smoke Detectors, demolition =
of plaster walls and ceiling, Friday, August 2, 2013 through Friday, August=
 9, 2013 (regular work days only) from 6:00am-4:00pm, Contact Billy Homeyer=
 8-0432.<o:p></o:p></p><p class=3DMsoNormal><o:p>&nbsp;</o:p></p><p class=
=3DMsoNormal>W/O# 5205961, Bldg.24-4<sup>th</sup> Floor, Fire Protection Wa=
ter, to modify sprinkler system &amp; add new sprinkler heads, 6 AM on Frid=
ay, August 2nd and to restore back at 6 AM on Friday, August 30th, 2013, Co=
ntact Billy Homeyer 8-0432.<o:p></o:p></p><p class=3DMsoNormal><o:p>&nbsp;<=
/o:p></p><p class=3DMsoNormal>W/O# 5204085, Bldg.W31-Basement, Fire Protect=
ion Water, to remove existing sprinkler &amp; install new valves and sprink=
ler heads, Wednesday, August 7, 2013 through Friday, August 9, 2013 from 6:=
00am-2:00pm, Contact Billy Homeyer 8-0432.<o:p></o:p></p><p class=3DMsoNorm=
al><o:p>&nbsp;</o:p></p></div></body></html>=

--_000_4EEA516695C10541B7CB963FF54A56AF13C687EBC5dofexchmbx01f_--

home help back first fref pref prev next nref lref last post