Bldg. 66 - All/rm 413 Chilled Water Induction System Shutdown (66-Chemical Engineering bldg. renovation)

daemon@ATHENA.MIT.EDU (shutdown-response@MIT.EDU)
Tue Jul 30 08:01:54 2013

From: shutdown-response@MIT.EDU
To: <undisclosed_recipients@MIT.EDU>
Cc: <jennygar@MIT.EDU>, <kdiggans@MIT.EDU>
Date: Tue, 30 Jul 2013 08:01:47 -0400
Message-ID: <085AD4A355794BE5A25B041F0EE9BBD7@facilities.ms.mit.edu>
MIME-Version: 1.0
Content-Type: text/plain;
	charset="iso-8859-1"
Content-Transfer-Encoding: 7bit
Content-Class: urn:content-classes:message

The following Chilled Water Induction System Shutdown is for bldg. 66 - All/rm 413 on Saturday, August 3, 2013 from 6:00am til 2:00pm is for your information and approval.  Any questions please contact Billy Homeyer x8--0432.


Would you please let us know if this does or does not have your approval.


Thank you,

Jennifer M. Garland
Repair and Maintenance
4-4350

Type: Normal
Date: August 3, 2013
Day: Saturday
Time: 6:00am - 2:00pm
Building(s): 66
Room(s): All
System: chilled water
Duration: 8 hrs 6:00am - 2:00pm 
Reason: 
We request a bldg 66-all chilled water induction system shutdown at 6 AM to 2 PM on Saturday, August 3rd, 2013 to install (2) FCU's in 66-413 (NOTE:  there will no loss to the chilled water perimeter induction units) as part of the bldg 66-Chemical Engineering building renovations by Suffolk Construction (Sam Aureli 617-963-6193). Keith Diggans 4-6174 and Bernie Richard 2-2762 are the MIT project managers on behalf of Billy Homeyer.

Effect: 
Loss of chilled water for the duration of this shutdown. 