Approved-: Bldg 24- 5th fl Normal Building Power Shutdown 208V/120V

daemon@ATHENA.MIT.EDU (Jennifer Garland)
Fri Jul 26 14:57:47 2013

From: Jennifer Garland <jennygar@plant.mit.edu>
To: "swade@mit.edu" <swade@mit.edu>, "craigp@MIT.EDU" <craigp@mit.edu>,
        "sbleeb@mit.edu" <sbleeb@mit.edu>, "ramsay@mit.edu" <ramsay@mit.edu>,
        "hbsweet@mit.edu" <hbsweet@mit.edu>,
        OPS RM Campus Services Main
	<rm-mcs@mit.edu>,
        "opsnote@mit.edu" <opsnote@mit.edu>, "elk@MIT.EDU"
	<elk@mit.edu>,
        "diadiuk@mit.edu" <diadiuk@mit.edu>,
        "mcgrath@mtl.mit.edu"
	<mcgrath@mtl.mit.edu>,
        "pbrenton@MIT.EDU" <pbrenton@mit.edu>,
        "censabel@MIT.EDU" <censabel@mit.edu>,
        "khewitt@mit.edu" <khewitt@mit.edu>, "elsye@MIT.EDU" <elsye@mit.edu>,
        "cubstead@MIT.EDU" <cubstead@mit.edu>,
        "cmodica@mit.edu" <cmodica@mit.edu>,
        MIT Schedules Office
	<schedules@mit.edu>,
        "mondol@MIT.EDU" <mondol@mit.edu>,
        "heatherg@mit.edu"
	<heatherg@mit.edu>,
        "shutdowns@mit.edu" <shutdowns@mit.edu>,
        "whomeyer@mit.edu" <whomeyer@mit.edu>,
        "ksemerj@mit.edu" <ksemerj@mit.edu>,
        Steven Gilligan <sgilliga@plant.mit.edu>,
        Ops RM Shutdown
	<rm-shutdown@mit.edu>, DOF EHS <dof-ehs@mit.edu>,
        "cp-command@mit.edu"
	<cp-command@mit.edu>,
        "safety@mit.edu" <safety@mit.edu>,
        Operators
	<Operators@plant.mit.edu>,
        DOF Customer Service Center <dof-csc@mit.edu>,
        "Ops Custodial Admin & Support Staff" <cust-staff@mit.edu>
CC: "jennygar@mit.edu" <jennygar@mit.edu>, "sudy@mit.edu" <sudy@mit.edu>
Date: Fri, 26 Jul 2013 14:57:39 -0400
Message-ID: <4EEA516695C10541B7CB963FF54A56AF13C63A9173@dof-exchmbx01.facilities.ms.mit.edu>
Content-Language: en-US
Content-Type: text/plain; charset="us-ascii"
MIME-Version: 1.0
Content-Transfer-Encoding: 8bit

The following Approved Normal building power shutdown 208V/120V is for bldg. 24 - 5th fl on Monday, July 29, 2013 from 12:01AM til 6:00AM is for your information.  Any questions please contact Billy Homeyer x8-0432.



Thank you,


Jennifer M. Garland
Repair and Maintenance
4-4350

Type: Normal
Date: July 29, 2013
Day: Monday
Time: 12:01AM - 6:00AM
Building(s): 24
Room(s): 5th fl
System: building power,telephones, supply ventilation
Duration: 12:01AM - 6:00AM 6 hrs
Reason: 
We request a bldg 24-5th floor normal bldg power shutdown, 208V/120V power panel P-519-2, from 12:01 AM to 6 AM on Monday early morning, July 29th, 2013 for Bennett Electric (Joe Iuditone 617-719-6954) to relocate 4th floor power panel P-411 as part of the 24-4th floor renovation project for LNS by Barr and Barr Builders (John Bidgood 508-686-0870). Sudy Nally 8-8010 is the MIT project manager.

P-519-2 serves the following
(basically everything on the 5th floor less lighting and air conditioning)

Electrical outlets in rooms
502
504
506
507
508
509
510
511
512
514
515
516
518
519
519A
519B
519C
519D
521
522
523

Corridor outlets
Elevator lights
Elevator outlets
Tel/data room outlets
Air handling unit for 515/519
(note the refrigerator in 519?) 

Other than the elevator light, lighting is not affected Fan coil units are not affected


Effect: 
Loss of normal building power for the duration of this shutdown. 