RE: NEED APPROVAL - UPDATED - DATES CHANGED - Bldg. NW13 and NW14
daemon@ATHENA.MIT.EDU (Jennifer Garland)
Fri Jul 19 15:05:35 2013
From: Jennifer Garland <jennygar@plant.mit.edu>
To: "wardle@mit.edu" <wardle@mit.edu>, "alz@MIT.EDU" <alz@mit.edu>,
"jdoughty@mit.edu" <jdoughty@mit.edu>, "swade@mit.edu" <swade@mit.edu>,
"craigp@MIT.EDU" <craigp@mit.edu>, "galanek@mit.edu" <galanek@mit.edu>,
"bobk@mit.edu" <bobk@mit.edu>, "wbm@mit.edu" <wbm@mit.edu>,
"nmorriso@MIT.EDU" <nmorriso@mit.edu>,
"domara@mit.edu" <domara@mit.edu>,
"OPS RM Campus Services West" <rm-wcs@mit.edu>,
"jhaggert@mit.edu"
<jhaggert@mit.edu>, "jcrm@MIT.EDU" <jcrm@mit.edu>,
"pbrenton@MIT.EDU"
<pbrenton@mit.edu>,
"censabel@MIT.EDU" <censabel@mit.edu>,
"jpfoster@mit.edu"
<jpfoster@mit.edu>,
"Eslau@mit.edu" <Eslau@mit.edu>, "mfulton@mit.edu"
<mfulton@mit.edu>,
"hrycaj@psfc.mit.edu" <hrycaj@psfc.mit.edu>,
"scottide@MIT.EDU" <scottide@mit.edu>,
"heatherg@mit.edu" <heatherg@mit.edu>,
"shutdowns@mit.edu" <shutdowns@mit.edu>,
"sgilliga@mit.edu"
<sgilliga@mit.edu>,
"alegere@mit.edu" <alegere@mit.edu>
CC: "jennygar@mit.edu" <jennygar@mit.edu>, "rlucas@mit.edu" <rlucas@mit.edu>
Date: Fri, 19 Jul 2013 15:05:22 -0400
Message-ID: <4EEA516695C10541B7CB963FF54A56AF13C60ADA40@dof-exchmbx01.facilities.ms.mit.edu>
Content-Language: en-US
Content-Type: multipart/alternative;
boundary="_000_4EEA516695C10541B7CB963FF54A56AF13C60ADA40dofexchmbx01f_"
MIME-Version: 1.0
--_000_4EEA516695C10541B7CB963FF54A56AF13C60ADA40dofexchmbx01f_
Content-Type: text/plain; charset="us-ascii"
Content-Transfer-Encoding: quoted-printable
The following CANCELLED normal 208&120volt power shutdown is for bldgs. NW1=
3 and NW14 on **DATES CHANGED - Thursday, August 1, 2013 from 10:00pm til F=
riday, August 2, 2013 at 7:00am is for your information. Any questions ple=
ase contact Rich Lucas 617-324-6801.
Thank you,
Jennifer M. Garland
Repair and Maintenance
4-4350
Type: Normal
Date: DATES CHANGED - August 1, 2013/// CANCELLED
Day: Thursday
Time: 10:00pm (Thu) - 7:00am (Fri)/// CANCELLED
Building(s): NW13 and NW14
Room(s): all
System: emergency generator, emergency power,building power,elevator,comput=
er, telephones, lighting,corr/stairs, chilled water, condenser water, suppl=
y vent/cooling/heating, general and toilet exhaust, condensate return, fire=
alarm
Duration: 10 hrs - 10:00pm (Thu) - 7:00am (Fri)
Reason:
*** DATES CHANGED - Thursday, August 1, 2013 from 10:00pm til Friday, Augus=
t 2, 2013 at 7:00am***
Shutdown of Normal power to buildings NW13 and NW14 in order to repair, PM =
and address an NSTAR issue we need to take care of. NSTAR will shut down p=
ower per the following schedule.
Start of Shutdown: Thursday night, 10:00 PM, 7/18/2013 End of Shutdown: Fri=
day morning, 7:00 AM, 7/19/2013
For a maximum of 10 hours.
During this time Emergency Power will not be affected.
Effect:
Loss of normal 208&120volt power for the duration of this shutdown.
--_000_4EEA516695C10541B7CB963FF54A56AF13C60ADA40dofexchmbx01f_
Content-Type: text/html; charset="us-ascii"
Content-Transfer-Encoding: quoted-printable
<html>
<head>
<meta http-equiv=3D"Content-Type" content=3D"text/html; charset=3Dus-ascii"=
>
<meta name=3D"Generator" content=3D"Microsoft Exchange Server">
<!-- converted from rtf -->
<style><!-- .EmailQuote { margin-left: 1pt; padding-left: 4pt; border-left:=
#800000 2px solid; } --></style>
</head>
<body>
<font face=3D"Calibri, sans-serif" size=3D"2">
<div>The following<font color=3D"#1F497D"> CANCELLED</font> normal 208&=
120volt power shutdown is for bldgs. NW13 and NW14 on **<b>DATES CHANGED - =
Thursday, August 1, 2013 from 10:00pm til Friday, August 2, 2013 at 7:00am =
is for your information</b>. Any questions
please contact Rich Lucas 617-324-6801.</div>
<div> </div>
<div> </div>
<div> </div>
<div>Thank you,</div>
<div> </div>
<div> </div>
<div>Jennifer M. Garland</div>
<div>Repair and Maintenance</div>
<div>4-4350</div>
<div> </div>
<div>Type: Normal</div>
<div>Date: <font color=3D"#1F497D">D</font><b>ATES CHANGED - August 1, 2013=
</b><font color=3D"#1F497D"><b>/// CANCELLED</b></font></div>
<div>Day: Thursday</div>
<div>Time: 10:00pm (Thu) - 7:00am (Fri)<font color=3D"#1F497D">/// CANCELLE=
D</font></div>
<div>Building(s): NW13 and NW14</div>
<div>Room(s): all</div>
<div>System: emergency generator, emergency power,building power,elevator,c=
omputer, telephones, lighting,corr/stairs, chilled water, condenser water, =
supply vent/cooling/heating, general and toilet exhaust, condensate return,=
fire alarm</div>
<div>Duration: 10 hrs - 10:00pm (Thu) - 7:00am (Fri)</div>
<div>Reason: </div>
<div>*** <b>DATES CHANGED - Thursday, August 1, 2013 from 10:00pm til Frida=
y, August 2, 2013 at 7:00am</b>***</div>
<div> </div>
<div>Shutdown of Normal power to buildings NW13 and NW14 in order to repair=
, PM and address an NSTAR issue we need to take care of. NSTAR will s=
hut down power per the following schedule. </div>
<div> </div>
<div>Start of Shutdown: Thursday night, 10:00 PM, 7/18/2013 End of Shutdown=
: Friday morning, 7:00 AM, 7/19/2013</div>
<div> </div>
<div>For a maximum of 10 hours.</div>
<div>During this time Emergency Power will not be affected.</div>
<div> </div>
<div> </div>
<div>Effect: </div>
<div>Loss of normal 208&120volt power for the duration of this shutdown=
. </div>
<div> </div>
<div> </div>
</font>
</body>
</html>
--_000_4EEA516695C10541B7CB963FF54A56AF13C60ADA40dofexchmbx01f_--