[170829] in Hotline Meeting
Bldg. E25 - Normal Emergency Power and Emergency Power Panel ELR-R Shutdown (E25-6th fl Mcgee lab cleanroom project)
daemon@ATHENA.MIT.EDU (shutdown-response@MIT.EDU)
Thu Jul 18 08:51:58 2013
From: shutdown-response@MIT.EDU
To: <undisclosed_recipients@MIT.EDU>
Cc: <jennygar@MIT.EDU>, <biss@MIT.EDU>
Date: Thu, 18 Jul 2013 08:51:52 -0400
Message-ID: <51F0B76C872340489EC94B45BB74B427@facilities.ms.mit.edu>
MIME-Version: 1.0
Content-Type: text/plain;
charset="iso-8859-1"
Content-Transfer-Encoding: 7bit
Content-Class: urn:content-classes:message
The following Normal Emergency Power and Emergency Power Panel ELR-R Shutdown is for bldg. E25 - on Tuesday, July 23, 2013 from 3:00am til 6:00am is for your information and approval. Any questions please contact Billy Homeyer x8-0432.
Would you please let us know if this does or does not have your approval.
Thank you,
Jennifer M. Garland
Repair and Maintenance
4-4350
Type: Normal
Date: July 23, 2013
Day: Tuesday
Time: 3:00am - 6:00am
Building(s): E23
Room(s): all
System: emergency/building power
Duration: 3:00am - 6:00am
Reason:
We request a bldg E25 normal emergency power shutdown, 480V emergency panel ELR-R, located in the penthouse and serving stairwell pressurization fans and EF86, from 3 AM to 6 AM on Tuesday morning, July 23rd, 2013 for EG Sawyer Electric (Ed Murphy 781-974-0679) to install two 25A circuit breakers and tie-in new exhaust fans that will serve the cleanroom for the E25-6th floor Prof McGee Lab project by DC Beane (Ryan Kucinski 617-997-9498). Paul Murphy 4-6163 and Biss Teelucksingh 2-5972 are the MIT project managers.
Panel ELR-R serves stairwell pressurization fans 1 and 2 (normally off) and EF86 is the E23/E25 atrium exhaust fan.
Effect:
Loss of normal emergency power for the duration of this shutdown.