[170654] in Hotline Meeting
Bldg. 38- Air Handler #2 Shutdown - serves fls. 1- 6 (Cypress engineering design studio project)
daemon@ATHENA.MIT.EDU (shutdown-response@MIT.EDU)
Thu Jul 11 12:29:43 2013
From: shutdown-response@MIT.EDU
To: <undisclosed_recipients@MIT.EDU>
Cc: <jennygar@MIT.EDU>, <biss@MIT.EDU>
Date: Thu, 11 Jul 2013 12:29:37 -0400
Message-ID: <D083A93EEBFA4BD7806CE20BABC83800@facilities.ms.mit.edu>
MIME-Version: 1.0
Content-Type: text/plain;
charset="iso-8859-1"
Content-Transfer-Encoding: 7bit
Content-Class: urn:content-classes:message
The following Air Handler #2 Shutdown serves fls. 1-6 is for bldg. 38 on Monday, July 15, 2013 and Tuesday, July 16, 2013 from 6:00am - 9:00am is for your information and approval. Any questions please contact Billy Homeyer x8-0432.
Would you please let us know if this does or does not have your approval.
Thank you,
Jennifer M. Garland
Repair and Maintenance
4-4350
Type: Normal
Date: July 15, 2013
Day: Monday
Time: 6:00am - 9:00am
Building(s): 38
Room(s): flr 1-6
System: air handler #2
Duration: 2 days - 6:00am - 9:00am
Reason:
We request a bldg 38- AH2 shutdown (PM # 701946) from 6 AM to 9 AM on Monday, July 15th and Tuesday, July 16th, 2013 for the removal of asbestos contaminated ductwork (NOTE: AH2 serves floors 1-6), as part of the Cypress engineering design studio project by Acella Construction (Marcilio Silva 781-733-1248). Biss Teelucksingh 2-5972 and Nicole Bernabei 5-5157 are the MIT project managers on behalf of Billy Homeyer.
Effect:
Loss of air handler #2 for the duration of this shutdown.