[170623] in Hotline Meeting
Bldg. 32 - Dreyfoos, Floors 4 through 9, Air Handler 1 and 11, Chilled Water to Air Handler 1 and 11 Shutdown Request
daemon@ATHENA.MIT.EDU (shutdown-response@MIT.EDU)
Wed Jul 10 14:33:40 2013
From: shutdown-response@MIT.EDU
To: <undisclosed_recipients@MIT.EDU>
Cc: <kdiggans@MIT.EDU>
Date: Wed, 10 Jul 2013 14:33:33 -0400
Message-ID: <C74B7DCA09FC48DC8EF4273AC54FDE3C@facilities.ms.mit.edu>
MIME-Version: 1.0
Content-Type: text/plain;
charset="iso-8859-1"
Content-Transfer-Encoding: 7bit
Content-Class: urn:content-classes:message
The following air handler 1 and 11, chilled water to air handler 1 and 11 shutdown request for Bldg. 32 - Dreyfoos, Floors 4 through 9, on Saturday, July 13, 2013, 6:00am - 6:00pm, is for your information and response. Any questions, please contact Billy Homeyer, x8-0432.
Please let us know whether this does or does not have your approval.
Thank you,
Jani Findlay
Comprehensive Stewardship Group
Dept. of Facilities
x3-6381
Type: Normal
Date: July 13, 2013
Day: Saturday
Time: 6:00am - 6:00pm
Building(s): 32
Room(s): Dreyfoos, Floors 4 through 9
System: Air Handler 1 and 11, Chilled Water to Air Handler 1 and 11
Duration: 12 hours
Reason:
We request bldg 32-AH1 and AH11 shutdowns from 6 AM to 6 PM on Saturday, July 13th, 2013 for Cox Mechanical (Rich Meradian 781-953-0318) and JM Electric (Mike DeGloria 781-718-9648) to relocate AH1/AH11chilled water piping off the roof to the 9th floor and also to install and wire new fan chilled water and heating hot water control valves (also on the 9th floor) as part of the bldg 32 roof repair project by Consigli Construction (Carlin Grenier 508-458-0590). Keith Diggans 4-6174 is the MIT project manager.
AH1 and AH11 serve bldg 32-Droofus floors 4 thru 9 and floors 5 thru 9 respectively. Note AH2 remains running which serves the south side floors 4-9.
Effect:
Loss of chilled water, and supply ventilation, cooling, and heating air for the duration of the shutdown.