Approved - Bldg. E23- 023, blood lab, phlebotomy lab Normal and

daemon@ATHENA.MIT.EDU (Jennifer Garland)
Mon Jun 24 08:19:28 2013

From: Jennifer Garland <jennygar@plant.mit.edu>
To: OPS RM Campus Services East <rm-ecs@mit.edu>,
        "Ops Custodial Admin &
 Support Staff" <cust-staff@mit.edu>,
        "bengel@mit.edu" <bengel@mit.edu>, "tquinn@mit.edu" <tquinn@mit.edu>,
        "brig@med.mit.edu" <brig@med.mit.edu>,
        "fris@med.mit.edu" <fris@med.mit.edu>,
        "heatherg@mit.edu" <heatherg@mit.edu>,
        "shutdowns@mit.edu" <shutdowns@mit.edu>,
        "whomeyer@mit.edu"
	<whomeyer@mit.edu>,
        "ksemerj@mit.edu" <ksemerj@mit.edu>,
        Steven Gilligan
	<sgilliga@plant.mit.edu>,
        "plyons@mit.edu" <plyons@mit.edu>,
        Ops RM Shutdown
	<rm-shutdown@mit.edu>, DOF EHS <dof-ehs@mit.edu>,
        "cp-command@mit.edu"
	<cp-command@mit.edu>,
        "safety@mit.edu" <safety@mit.edu>,
        Operators
	<Operators@plant.mit.edu>,
        DOF Customer Service Center <dof-csc@mit.edu>,
        "Ops Custodial Admin & Support Staff" <cust-staff@mit.edu>
CC: "jennygar@mit.edu" <jennygar@mit.edu>, "biss@mit.edu" <biss@mit.edu>
Date: Mon, 24 Jun 2013 08:19:16 -0400
Message-ID: <4EEA516695C10541B7CB963FF54A56AF13C4422CCD@dof-exchmbx01.facilities.ms.mit.edu>
Content-Language: en-US
Content-Type: text/plain; charset="us-ascii"
MIME-Version: 1.0
Content-Transfer-Encoding: 8bit

The following Approved Normal and Emergency Power Shutdown is for bldg. E23 - 023, blood lab, phlebotomy lab on Tuesday, June 25, 2013 from 12:01am til 6:00am is for your information.  Any questions please contact Billy Homeyer x8-0432.



Thank you,


Jennifer M. Garland
Repair and Maintenance
4-4350

Type: Normal
Date: June 25, 2013
Day: Tuesday
Time: 12:01am til 6:00am
Building(s): E23
Room(s): 023, blood lab, phlebotomy lab
System: emergency power and building power
Duration: 12:01am til 6:00am
Reason: 
We request bldg E23 480V/277V/208V/120V emergency power panel ESH23B1 (includes blood lab 208V panel ESL23111) and 208V panel PS2311 (Phlebotomy lab) normal bldg power shutdowns from 12:01 AM midnight to 6 AM on Tuesday morning, June 25th, 2013 for Crocker Electric to tie-in a lab waste transfer pump in the bsmt E25-001 mech room at 480V EP ESH23B1 in E23 HV Room and to install circuit breakers and tie-in electric reheat for Urgent Care at panel PS2311 as part of an add to the Pharmacy Storefront project by Elaine Construction (Bernie Cincotta 617-590-3944). Kim Sutherland 8-5972 and Biss Teelucksingh 2-5972 are the MIT project managers.

Affected equipment other than the 1st floor labs noted above are copiers/printers in E23-023 suite and a bsmt ejector pump. A bsmt fan coil unit is also noted.


Effect: 
Loss of building power and emergency power for the duration of this shutdown. 