[170237] in Hotline Meeting

home help back first fref pref prev next nref lref last post

Approved - Bldg. E25-6th fl labs 650B, 650C, office numbered above

daemon@ATHENA.MIT.EDU (Jennifer Garland)
Tue Jun 18 07:19:20 2013

From: Jennifer Garland <jennygar@plant.mit.edu>
To: "jdoughty@mit.edu" <jdoughty@mit.edu>, "swade@mit.edu" <swade@mit.edu>,
        "macdonaj@mit.edu" <macdonaj@mit.edu>,
        "craigp@MIT.EDU" <craigp@mit.edu>,
        "OPS RM Campus Services East" <rm-ecs@mit.edu>,
        Ops Custodial Admin & Support
 Staff <cust-staff@mit.edu>,
        "adaz@mit.edu" <adaz@mit.edu>, "bengel@mit.edu"
	<bengel@mit.edu>,
        "rdfadel@MIT.EDU" <rdfadel@mit.edu>,
        "tquinn@mit.edu"
	<tquinn@mit.edu>, "ninadm@mit.edu" <ninadm@mit.edu>,
        Michael Smith
	<masmith@mit.edu>,
        "brig@med.mit.edu" <brig@med.mit.edu>,
        "MIT Schedules
 Office" <schedules@mit.edu>,
        "scottide@MIT.EDU" <scottide@mit.edu>,
        "heatherg@mit.edu" <heatherg@mit.edu>,
        "shutdowns@mit.edu"
	<shutdowns@mit.edu>,
        "plyons@mit.edu" <plyons@mit.edu>,
        "wradochi@mit.edu"
	<wradochi@mit.edu>,
        "sgilliga@mit.edu" <sgilliga@mit.edu>,
        "whomeyer@mit.edu"
	<whomeyer@mit.edu>,
        "ksemerj@mit.edu" <ksemerj@mit.edu>,
        Ops RM Shutdown
	<rm-shutdown@mit.edu>, DOF EHS <dof-ehs@mit.edu>,
        "cp-command@mit.edu"
	<cp-command@mit.edu>,
        "safety@mit.edu" <safety@mit.edu>,
        Operators
	<Operators@plant.mit.edu>,
        DOF Customer Service Center <dof-csc@mit.edu>,
        "Ops Custodial Admin & Support Staff" <cust-staff@mit.edu>
CC: "jennygar@mit.edu" <jennygar@mit.edu>, "biss@mit.edu" <biss@mit.edu>
Date: Tue, 18 Jun 2013 07:19:10 -0400
Message-ID: <4EEA516695C10541B7CB963FF54A56AF13C40CCDAD@dof-exchmbx01.facilities.ms.mit.edu>
Content-Language: en-US
Content-Type: text/plain; charset="us-ascii"
MIME-Version: 1.0
Content-Transfer-Encoding: 8bit

The following Approved Normal 208V/120V Building Power Shutdown, West distribution panel DP26A is for bldg. E25-6th fl. labs 650B, 650C, offices numbered above 631 on  Wednesday, June 19, 2013 from 3:00AM - 7:00AM is for your information.  Any questions please contact Billy Homeyer x8-0432.


Thank you,


Jennifer M. Garland
Repair and Maintenance
4-4350

Type: Normal
Date: June 19, 2013
Day: Wednesday
Time: 3:00AM - 7:00AM
Building(s): E25
Room(s): 6th fl labs, 650B, 650C offices numbered above 631
System: building power, computers, lighting, telephones
Duration: 3:00AM - 7:00AM
Reason: 
We would like to reschedule the E25-6th floor west normal bldg power shutdown, 208V/120V distribution panel DP26A, from 3 AM to 7 AM on Wednesday morning, June 19th, 2013 for EG Sawyer to install a 150A circuit breaker in this panel and to install additional circuit breakers in P26A3 as part of the Prof McGee Lab cleanroom project by DC Beane (Ryan Kucinski 617-997-9498). Paul Murphy 4-6163 and Biss Teelucksingh 2-5972 are the MIT project managers.  Both the shutdown request form and work order #5192693 have been modified to reflect this change on behalf of Billy Homeyer.

DP26A feeds panels P26A1, A2 and A3. All 120V/208V normal lab power from Prof Ono's lab area to the freight elevator will be affected. The hoods in these areas will remain active but will not have power or lighting in them. West offices 633 up to 653 should also prepare for this power outage. The walk in constant temperature boxes will not be affected as they are on emergency power.


Effect: 
Loss of building power, computers, lighting, telephones for the duration of this shutdown. 