[170230] in Hotline Meeting

home help back first fref pref prev next nref lref last post

*REVISED *Extended and Modified - Bldg. 32 - Gates, Floors 4

daemon@ATHENA.MIT.EDU (Janine Findlay)
Mon Jun 17 13:57:00 2013

From: Janine Findlay <jfindlay@plant.mit.edu>
To: "mwf@mit.edu" <mwf@mit.edu>, "liscott@mit.edu" <liscott@mit.edu>,
        "tommyl@mit.edu" <tommyl@mit.edu>, "myersm@MIT.EDU" <myersm@mit.edu>,
        "jackc@csail.mit.edu" <jackc@csail.mit.edu>,
        "steverug@CSAIL.MIT.EDU"
	<steverug@csail.mit.edu>,
        "isabell@mit.edu" <isabell@mit.edu>, "sbleeb@mit.edu" <sbleeb@mit.edu>,
        Michael Fahie <mfahie@plant.mit.edu>,
        "OPS RM Campus Services Main" <rm-mcs@mit.edu>,
        "Martin O'Brien"
	<mobrien@plant.mit.edu>,
        "Stata-Custodial@mit.edu" <Stata-Custodial@mit.edu>,
        Ops CSG All <csg-all@mit.edu>, "dwright@MIT.EDU" <dwright@mit.edu>,
        "stata-desk@mit.edu" <stata-desk@mit.edu>,
        "rosko@mit.edu" <rosko@mit.edu>, Michael Smith <masmith@mit.edu>,
        "edel@mit.edu" <edel@mit.edu>, "shanlon@mit.edu" <shanlon@mit.edu>,
        "lrbrutti@mit.edu" <lrbrutti@mit.edu>, "rcruz@mit.edu" <rcruz@mit.edu>,
        "aneely@mit.edu" <aneely@mit.edu>,
        "MIT
 Schedules Office" <schedules@mit.edu>,
        "kdonaher@mit.edu" <kdonaher@mit.edu>,
        "kasabula@mit.edu" <kasabula@mit.edu>,
        "rpittari@mit.edu" <rpittari@mit.edu>,
        "ksimons@mit.edu" <ksimons@mit.edu>,
        "rwong@brighthorizons.com"
	<rwong@brighthorizons.com>,
        "worklife@mit.edu" <worklife@mit.edu>,
        "shutdowns@mit.edu" <shutdowns@mit.edu>,
        "whomeyer@mit.edu"
	<whomeyer@mit.edu>,
        "ksemerj@mit.edu" <ksemerj@mit.edu>,
        "Ops RM Electrical
 Controls Team" <rm-elecctl@mit.edu>,
        "rlucas@mit.edu" <rlucas@mit.edu>, "dcrovo@mit.edu" <dcrovo@mit.edu>
CC: Keith Diggans <kdiggans@plant.mit.edu>
Date: Mon, 17 Jun 2013 13:56:44 -0400
Message-ID: <4EEA516695C10541B7CB963FF54A56AF13C40CCABB@dof-exchmbx01.facilities.ms.mit.edu>
Content-Language: en-US
Content-Type: multipart/alternative;
	boundary="_000_4EEA516695C10541B7CB963FF54A56AF13C40CCABBdofexchmbx01f_"
MIME-Version: 1.0

--_000_4EEA516695C10541B7CB963FF54A56AF13C40CCABBdofexchmbx01f_
Content-Type: text/plain; charset="us-ascii"
Content-Transfer-Encoding: quoted-printable

The following *REVISED *extended and modified normal building power and air=
 handler 3 shutdown request for Bldg. 32 - Gates, Floors 4 through 9, on Tu=
esday, June *25, 2013, 5:00am - 7:00am, is for your information and respons=
e.  Any questions, please contact Billy Homeyer, x8-0432.



Please let us know whether this does or does not have your approval.



Thank you,



Jani Findlay

Comprehensive Stewardship Group

Dept. of Facilities

x3-6381



Type: Normal

Date: June 18, 2013  June 25, 2013

Day: Tuesday

Time: 5:00am - 7:00am

Building(s): 32

Room(s): Gates, Floors 4 through 9

System: Normal Building Power and Air Handler 3

Duration: 2 hours

Reason:

Original request: We request a brief 32-Gates AH3 shutdown (serves floors 4=
 thru 9 Gates) from 6 AM to 7 AM on Tuesday morning, June 11th, 2013 to tie=
-in temporary power for the 32 roof repair project out of 32G-949E 208V/120=
V power panel M2GP. M2GP serves AH3 auxiliaries; VFD housing heatpump and f=
an coil unit. AH3 will probably not need to be shutdown during this power p=
anel shutdown but I see it best to request the shutdown none the less. Cons=
igli Construction contact/super is Carlin Grenier 508-509-2935, thank you, =
Billy Homeyer 8-0432



*Extended/Modified Request - We would like to extend and modify the 32-Gate=
s AH3 (serves floor 4 thru 9 Gates) normal power shutdown from 5 AM to 7 AM=
 on Tuesday morning, June 25th, 2013 to install a permanent 50 amp breaker =
for a welding outlet that is being installed on the roof out of 32G-949 208=
V/120V power panel M2GP.   M2GP serves AH3 auxiliaries; VFD housing heatpum=
p and fan coil unit as part the 32-roof repair project by Consigli Construc=
tion (Carlin Grenier 508-509-2935.  Keith Diggans 4-6174 and John Engle 4-5=
001 are the MIT project managers on behalf of Billy Homeyer.



*REVISED DATE:  I apologize but sent this out with the incorrect date.  The=
 date should be Tuesday, June 25th.  Sorry for any confusion.  Thank you, J=
ani



Effect:

Loss of normal building power, and supply ventilation and cooling air for t=
he duration of the shutdown.



--_000_4EEA516695C10541B7CB963FF54A56AF13C40CCABBdofexchmbx01f_
Content-Type: text/html; charset="us-ascii"
Content-Transfer-Encoding: quoted-printable

<html xmlns:v=3D"urn:schemas-microsoft-com:vml" xmlns:o=3D"urn:schemas-micr=
osoft-com:office:office" xmlns:w=3D"urn:schemas-microsoft-com:office:word" =
xmlns:m=3D"http://schemas.microsoft.com/office/2004/12/omml" xmlns=3D"http:=
//www.w3.org/TR/REC-html40"><head><META HTTP-EQUIV=3D"Content-Type" CONTENT=
=3D"text/html; charset=3Dus-ascii"><meta name=3DGenerator content=3D"Micros=
oft Word 14 (filtered medium)"><style><!--
/* Font Definitions */
@font-face
	{font-family:Calibri;
	panose-1:2 15 5 2 2 2 4 3 2 4;}
@font-face
	{font-family:Consolas;
	panose-1:2 11 6 9 2 2 4 3 2 4;}
/* Style Definitions */
p.MsoNormal, li.MsoNormal, div.MsoNormal
	{margin:0in;
	margin-bottom:.0001pt;
	font-size:11.0pt;
	font-family:"Calibri","sans-serif";}
a:link, span.MsoHyperlink
	{mso-style-priority:99;
	color:blue;
	text-decoration:underline;}
a:visited, span.MsoHyperlinkFollowed
	{mso-style-priority:99;
	color:purple;
	text-decoration:underline;}
p.MsoPlainText, li.MsoPlainText, div.MsoPlainText
	{mso-style-priority:99;
	mso-style-link:"Plain Text Char";
	margin:0in;
	margin-bottom:.0001pt;
	font-size:11.0pt;
	font-family:"Calibri","sans-serif";}
span.PlainTextChar
	{mso-style-name:"Plain Text Char";
	mso-style-priority:99;
	mso-style-link:"Plain Text";
	font-family:"Calibri","sans-serif";}
.MsoChpDefault
	{mso-style-type:export-only;
	font-family:"Calibri","sans-serif";}
@page WordSection1
	{size:8.5in 11.0in;
	margin:1.0in 1.0in 1.0in 1.0in;}
div.WordSection1
	{page:WordSection1;}
--></style><!--[if gte mso 9]><xml>
<o:shapedefaults v:ext=3D"edit" spidmax=3D"1026" />
</xml><![endif]--><!--[if gte mso 9]><xml>
<o:shapelayout v:ext=3D"edit">
<o:idmap v:ext=3D"edit" data=3D"1" />
</o:shapelayout></xml><![endif]--></head><body lang=3DEN-US link=3Dblue vli=
nk=3Dpurple><div class=3DWordSection1><p class=3DMsoPlainText>The following=
 *REVISED *extended and modified normal building power and air handler 3 sh=
utdown request for Bldg. 32 - Gates, Floors 4 through 9, on Tuesday, June *=
25, 2013, 5:00am - 7:00am, is for your information and response.&nbsp; Any =
questions, please contact Billy Homeyer, x8-0432.<o:p></o:p></p><p class=3D=
MsoPlainText><o:p>&nbsp;</o:p></p><p class=3DMsoPlainText>Please let us kno=
w whether this does or does not have your approval.<o:p></o:p></p><p class=
=3DMsoPlainText><o:p>&nbsp;</o:p></p><p class=3DMsoPlainText>Thank you,<o:p=
></o:p></p><p class=3DMsoPlainText><o:p>&nbsp;</o:p></p><p class=3DMsoPlain=
Text>Jani Findlay<o:p></o:p></p><p class=3DMsoPlainText>Comprehensive Stewa=
rdship Group<o:p></o:p></p><p class=3DMsoPlainText>Dept. of Facilities<o:p>=
</o:p></p><p class=3DMsoPlainText>x3-6381<o:p></o:p></p><p class=3DMsoPlain=
Text><o:p>&nbsp;</o:p></p><p class=3DMsoPlainText>Type: Normal<o:p></o:p></=
p><p class=3DMsoPlainText>Date: <s>June 18, 2013</s>&nbsp; June 25, 2013<o:=
p></o:p></p><p class=3DMsoPlainText>Day: Tuesday<o:p></o:p></p><p class=3DM=
soPlainText>Time: 5:00am - 7:00am<o:p></o:p></p><p class=3DMsoPlainText>Bui=
lding(s): 32<o:p></o:p></p><p class=3DMsoPlainText>Room(s): Gates, Floors 4=
 through 9<o:p></o:p></p><p class=3DMsoPlainText>System: Normal Building Po=
wer and Air Handler 3<o:p></o:p></p><p class=3DMsoPlainText>Duration: 2 hou=
rs<o:p></o:p></p><p class=3DMsoPlainText>Reason: <o:p></o:p></p><p class=3D=
MsoPlainText>Original request: We request a brief 32-Gates AH3 shutdown (se=
rves floors 4 thru 9 Gates) from 6 AM to 7 AM on Tuesday morning, June 11th=
, 2013 to tie-in temporary power for the 32 roof repair project out of 32G-=
949E 208V/120V power panel M2GP. M2GP serves AH3 auxiliaries; VFD housing h=
eatpump and fan coil unit. AH3 will probably not need to be shutdown during=
 this power panel shutdown but I see it best to request the shutdown none t=
he less. Consigli Construction contact/super is Carlin Grenier 508-509-2935=
, thank you, Billy Homeyer 8-0432<o:p></o:p></p><p class=3DMsoPlainText><o:=
p>&nbsp;</o:p></p><p class=3DMsoPlainText>*Extended/Modified Request - We w=
ould like to extend and modify the 32-Gates AH3 (serves floor 4 thru 9 Gate=
s) normal power shutdown from 5 AM to 7 AM on Tuesday morning, June 25th, 2=
013 to install a permanent 50 amp breaker for a welding outlet that is bein=
g installed on the roof out of 32G-949 208V/120V power panel M2GP.&nbsp;&nb=
sp; M2GP serves AH3 auxiliaries; VFD housing heatpump and fan coil unit as =
part the 32-roof repair project by Consigli Construction (Carlin Grenier 50=
8-509-2935.&nbsp; Keith Diggans 4-6174 and John Engle 4-5001 are the MIT pr=
oject managers on behalf of Billy Homeyer. <o:p></o:p></p><p class=3DMsoPla=
inText><o:p>&nbsp;</o:p></p><p class=3DMsoPlainText><span style=3D'color:bl=
ack'>*REVISED DATE:&nbsp; I apologize but sent this out with the incorrect =
date.&nbsp; The date should be Tuesday, June 25th.&nbsp; Sorry for any conf=
usion.&nbsp; Thank you, Jani<o:p></o:p></span></p><p class=3DMsoPlainText><=
span style=3D'color:black'><o:p>&nbsp;</o:p></span></p><p class=3DMsoPlainT=
ext>Effect: <o:p></o:p></p><p class=3DMsoPlainText>Loss of normal building =
power, and supply ventilation and cooling air for the duration of the shutd=
own.<o:p></o:p></p><p class=3DMsoPlainText><o:p>&nbsp;</o:p></p></div></bod=
y></html>=

--_000_4EEA516695C10541B7CB963FF54A56AF13C40CCABBdofexchmbx01f_--

home help back first fref pref prev next nref lref last post