NEED APPROVAL - RESCHEDULED DATES: - Bldg. 6-All Labs (fume hoods)
daemon@ATHENA.MIT.EDU (Jennifer Garland)
Fri Jun 14 12:58:37 2013
From: Jennifer Garland <jennygar@plant.mit.edu>
To: "jdoughty@mit.edu" <jdoughty@mit.edu>, "swade@mit.edu" <swade@mit.edu>,
"rjwilk@mit.edu" <rjwilk@mit.edu>, "sdimond@mit.edu" <sdimond@mit.edu>,
"galanek@mit.edu" <galanek@mit.edu>, "bobk@mit.edu" <bobk@mit.edu>,
"nmorriso@MIT.EDU" <nmorriso@mit.edu>,
Paul Lyons <plyons@plant.mit.edu>,
"OPS RM Campus Services Main" <rm-mcs@mit.edu>,
Gerry Hughes
<ghughes@mit.edu>, "Tarky@mit.edu" <Tarky@mit.edu>,
"help@math.mit.edu"
<help@math.mit.edu>,
"pelletier@math.mit.edu" <pelletier@math.mit.edu>,
"khewitt@mit.edu" <khewitt@mit.edu>, "elsye@MIT.EDU" <elsye@mit.edu>,
"cmodica@mit.edu" <cmodica@mit.edu>, "morley@mit.edu" <morley@mit.edu>,
MIT
Schedules Office <schedules@mit.edu>,
"scottide@MIT.EDU" <scottide@mit.edu>,
"jimwhite@MIT.EDU" <jimwhite@mit.edu>,
"heatherg@mit.edu" <heatherg@mit.edu>,
"chibcha@MIT.EDU" <chibcha@mit.edu>, "zqueen@mit.edu" <zqueen@mit.edu>,
"shutdowns@mit.edu" <shutdowns@mit.edu>,
"whomeyer@mit.edu"
<whomeyer@mit.edu>,
"ksemerj@mit.edu" <ksemerj@mit.edu>,
Steven Gilligan
<sgilliga@plant.mit.edu>
CC: "jennygar@mit.edu" <jennygar@mit.edu>, "mdeluga@mit.edu" <mdeluga@mit.edu>
Date: Fri, 14 Jun 2013 12:58:29 -0400
Message-ID: <4EEA516695C10541B7CB963FF54A56AF13C40CC277@dof-exchmbx01.facilities.ms.mit.edu>
Content-Language: en-US
Content-Type: multipart/alternative;
boundary="_000_4EEA516695C10541B7CB963FF54A56AF13C40CC277dofexchmbx01f_"
MIME-Version: 1.0
--_000_4EEA516695C10541B7CB963FF54A56AF13C40CC277dofexchmbx01f_
Content-Type: text/plain; charset="us-ascii"
Content-Transfer-Encoding: quoted-printable
The following RESCHEDULED Normal 480V Bldg Power Shutdown is for bldg. 6-Al=
l labs (fume hoods) and Power Panel MDP (Chemistry project) is for bldg. 2=
-017E (reheat, lab waste) Shutdown on Tuesday, June 25, 2013 from 6:00PM ti=
lWednesday, June 26, 2013 6:00AM is for your information and approval. Any=
questions please contact Billy Homeyer x8-0432.
Would you please let us know if this does or does not have your approval.
Thank you,
Jennifer M. Garland
Repair and Maintenance
4-4350
Type: Normal
Date: June 25, 2013
Day: Tuesday
Time: 6:00PM (Tue) - 6:00AM (Wed)
Building(s): 6-All labs and bldg. 2 - 017E
Room(s): labs (fume hoods)bldg. 6 - reheat, lab waste for bldg. 2
System: building power,heating hot water, supply heating, laboratory, lab w=
aste, exhaust hood
Duration: 6:00PM (Tue) - 6:00AM (Wed)
Reason:
RESCHEDULED: Dear all, this bldg 2-480V normal power panel MDP shutdown h=
as been rescheduled to Tuesday evening, June 25th until 6 AM on Wednesday m=
orning, June 26th. This coincides with the rescheduled 6-EF1A-D fume hood e=
xhaust fans shutdown which this panel feeds. The other major effect of this=
panel shutdown is that the bldg 2-bsmt laser labs reheat system will lose =
power through panel MP422 also being fed from panel MDP.
Both the shutdown form and work order 5193114 have been modified to reflect=
this change, Billy H. 8-0432
We request a bldg 2-217E 480V distribution panel MDP normal bldg power shut=
down from 6 PM on Thursday evening, June 20th to 6 AM on Friday morning, Ju=
ne 21st, 2013 for Bennett Electric (John Shaw 617-293-4806) to install a 22=
5A circuit breaker for future new rooftop air handling units and to refeed =
the 2-PH power panel MP4PH1 (conduit relocation) as part of the 2 Chemistry=
renovation project by Bond Brothers (Jesse Conklin 617-938-4175). Marty De=
luga 4-5081 and Joe Collins 3-3621 are the MIT project managers.
Panel MDP feeds the 2 penthouse panel MP4PH1 which in turn feeds EF1A, 1B, =
1C and 1D (bldg 6 lab fume hood exhaust fans shutdowns requested on another=
shutdown request for the same time frame), some roof lighting and a Schnei=
der CX panel.
MDP also feeds 2-012 power panel MP422 which in turn feeds the heating hot =
water system (reheats), the bldg 2 lab waste transfer system and a local me=
chanical room exhaust fan.
Effect: Loss building power,heating hot water, supply heating, laboratory,=
lab waste, exhaust hood for the duration of this shutdown.
--_000_4EEA516695C10541B7CB963FF54A56AF13C40CC277dofexchmbx01f_
Content-Type: text/html; charset="us-ascii"
Content-Transfer-Encoding: quoted-printable
<html>
<head>
<meta http-equiv=3D"Content-Type" content=3D"text/html; charset=3Dus-ascii"=
>
<meta name=3D"Generator" content=3D"Microsoft Exchange Server">
<!-- converted from rtf -->
<style><!-- .EmailQuote { margin-left: 1pt; padding-left: 4pt; border-left:=
#800000 2px solid; } --></style>
</head>
<body>
<font face=3D"Calibri, sans-serif" size=3D"2">
<div>The following <b>RESCHEDULED</b><b> </b>Normal 480V Bldg Power Shutdow=
n is for bldg. 6-All labs (fume hoods) and Power Panel MDP (Chemistry=
project) is for bldg. 2-017E (reheat, lab waste) Shutdown on <b>Tuesday, J=
une 25, 2013</b><b> from 6:00PM til</b><b>Wednesday,
June 26, 2013</b><b> 6:00AM</b> is for your information and approval. =
Any questions please contact Billy Homeyer x8-0432.</div>
<div> </div>
<div> </div>
<div><b>Would you please let us know if this does or does not have your app=
roval.</b></div>
<div> </div>
<div>Thank you,</div>
<div> </div>
<div> </div>
<div>Jennifer M. Garland</div>
<div>Repair and Maintenance</div>
<div>4-4350</div>
<div> </div>
<div>Type: Normal</div>
<div>Date: <b>June 2</b><b>5</b><b>, 2013</b></div>
<div>Day: Tuesday</div>
<div>Time: 6:00PM (Tue) - 6:00AM (Wed)</div>
<div>Building(s): 6-All labs and bldg. 2 - 017E</div>
<div>Room(s): labs (fume hoods)bldg. 6 - reheat, lab waste for bldg. 2</div=
>
<div>System: building power,heating hot water, supply heating, laboratory, =
lab waste, exhaust hood</div>
<div>Duration: 6:00PM (Tue) - 6:00AM (Wed)</div>
<div>Reason: </div>
<div><b>RESCHEDULED: </b><b> </b><b>Dear all, this bldg 2-480V normal=
power panel MDP shutdown has been rescheduled to Tuesday evening, June 25t=
h until 6 AM on Wednesday morning, June 26th. This coincides with the resch=
eduled 6-EF1A-D fume hood exhaust fans
shutdown which this panel feeds. </b><b>Th</b><b>e other major effect of th=
is panel shutdown is that the bldg 2-bsmt laser labs reheat system will los=
e power through panel MP422 also being fed from panel MDP.</b></div>
<div><b>Both the shutdown form and work order 5193114 have been modified to=
reflect this change, Billy H. 8-0432</b></div>
<div> </div>
<div>We request a bldg 2-217E 480V distribution panel MDP normal bldg power=
shutdown from 6 PM on Thursday evening, June 20th to 6 AM on Friday mornin=
g, June 21st, 2013 for Bennett Electric (John Shaw 617-293-4806) to install=
a 225A circuit breaker for future
new rooftop air handling units and to refeed the 2-PH power panel MP4PH1 (c=
onduit relocation) as part of the 2 Chemistry renovation project by Bond Br=
others (Jesse Conklin 617-938-4175). Marty Deluga 4-5081 and Joe Collins 3-=
3621 are the MIT project managers.</div>
<div> </div>
<div>Panel MDP feeds the 2 penthouse panel MP4PH1 which in turn feeds EF1A,=
1B, 1C and 1D (bldg 6 lab fume hood exhaust fans shutdowns requested on an=
other shutdown request for the same time frame), some roof lighting and a S=
chneider CX panel.</div>
<div>MDP also feeds 2-012 power panel MP422 which in turn feeds the heating=
hot water system (reheats), the bldg 2 lab waste transfer system and a loc=
al mechanical room exhaust fan. </div>
<div> </div>
<div> </div>
<div> </div>
<div>Effect: Loss building power,heating hot water, supply heating, l=
aboratory, lab waste, exhaust hood for the duration of this shutdown. </div=
>
<div> </div>
<div> </div>
</font>
</body>
</html>
--_000_4EEA516695C10541B7CB963FF54A56AF13C40CC277dofexchmbx01f_--