[169949] in Hotline Meeting

home help back first fref pref prev next nref lref last post

Bldg. W20-basement Domestic Hot and Cold Water Shutdown (W20 catering kitchen renovation project)

daemon@ATHENA.MIT.EDU (shutdown-response@MIT.EDU)
Wed Jun 5 08:53:22 2013

From: shutdown-response@MIT.EDU
To: <undisclosed_recipients@MIT.EDU>
Cc: <jennygar@MIT.EDU>, <sudy@MIT.EDU>
Date: Wed, 5 Jun 2013 08:53:04 -0400
Message-ID: <679EF1A4B0B54EA491DCBDDF4AC9614C@facilities.ms.mit.edu>
MIME-Version: 1.0
Content-Type: text/plain;
	charset="iso-8859-1"
Content-Transfer-Encoding: 7bit
Content-Class: urn:content-classes:message

The following Domestic Hot and Cold Water Shutdown (W20 catering kitchen renovation project) is in Bldg. W20 - basement on Monday, June 8:00PM til 9:00PM is for your information and approval.  Any questions please contact Billy Homeyer x8-0432.


Would you please let us know if this does or does not have your approval.


Thank you,


Jennifer M. Garland
Repair and Maintenance
4-4350

Type: Normal
Date: June 10, 2013
Day: Monday
Time: 8:00PM - 9:00PM
Building(s): W20
Room(s): basement
System: hot/cold domestic water
Duration: 8:00PM - 9:00PM 1 hr
Reason: 
We request a bldg W20-bsmt domestic water shutdown from 8 PM to 9 PM on Monday evening, June 10th, 2013 for the installation of isolation valves in W20-019 for shutting down water to the bsmt kitchens - for wall demo and as part of the catering kitchen renovation project by Elaine Construction (Robin Lorscheider 781-727-8835). Sudy Nally 8-8010 and Jennifer Combs 3-7671 are the MIT project manager.

Effect: 
Loss of hot and cold domestic water for the duration of this shutdown. 