Approved - Bldg. W91-All Fire Alarm Shutdown, Data Center Cooling

daemon@ATHENA.MIT.EDU (Jennifer Garland)
Tue Jun 4 09:09:05 2013

From: Jennifer Garland <jennygar@plant.mit.edu>
To: OPS RM Campus Services West <rm-wcs@mit.edu>,
        "lupo@mit.edu"
	<lupo@mit.edu>,
        "ois-plant-notify@mit.edu" <ois-plant-notify@mit.edu>,
        "W92site@mit.edu" <W92site@mit.edu>,
        "segaloff@MIT.EDU" <segaloff@mit.edu>,
        "shutdowns@mit.edu" <shutdowns@mit.edu>,
        "whomeyer@mit.edu"
	<whomeyer@mit.edu>,
        "kesemerj@mit.edu" <kesemerj@mit.edu>,
        "wradochi@mit.edu"
	<wradochi@mit.edu>,
        Ops RM Shutdown <rm-shutdown@mit.edu>, DOF EHS
	<dof-ehs@mit.edu>,
        "cp-command@mit.edu" <cp-command@mit.edu>,
        "safety@mit.edu" <safety@mit.edu>, Operators <Operators@plant.mit.edu>,
        "DOF
 Customer Service Center" <dof-csc@mit.edu>,
        "Ops Custodial Admin & Support
 Staff" <cust-staff@mit.edu>
CC: "jennygar@mit.edu" <jennygar@mit.edu>,
        "pjmurphy@mit.edu"
	<pjmurphy@mit.edu>
Date: Tue, 4 Jun 2013 09:08:56 -0400
Message-ID: <4EEA516695C10541B7CB963FF54A56AF13C2671EB4@dof-exchmbx01.facilities.ms.mit.edu>
Content-Language: en-US
Content-Type: text/plain; charset="us-ascii"
MIME-Version: 1.0
Content-Transfer-Encoding: 8bit

The following Approved Fire Alarm Shutdown is for bldg. W91- All on Monday, June 10, 2013 from 8:00am - 10:00am is for your information. Any questions please contact Billy Homeyer x8-0432.



Thank you,


Jennifer M. Garland
Repair and Maintenance
4-4350

Type: Normal
Date: June 10, 2013
Day: Monday
Time: 8:00am - 10;00am
Building(s): W91
Room(s): ALL
System: Fire alarm
Duration: 8:00am - 10:00am
Reason: 
We request a bldg W91 fire alarm shutdown from 8 AM to 10 AM on June 10th, 2013 in order to test the data center EPO / fire alarm system interface as it relates to the data center CRAC units while the EPO itself is disarmed. All 14 crac units will be remotely shutdown 6 times as we test all of the 6 above/below floor smoke detector scenarios (rm 130 two above, two below, one each above below and then the same for room 189) as part of the W91 AT&T Data Center upgrade project by Elaine Construction (Nick Murray 617-799-7913). Important note - pre-action sprinkler valves will be closed and simulated conditions will be monitored via the pre-action valve solenoid. The overall test will be witnessed as a 3rd party inspection test by J. & M. Brown Co. (Wayne Maginnis 617-212-2509). Paul Murphy 4-6163 is the MIT project manager.

The June 10th date was chosen by W91's DOST, Rich Ledoux, for being 'after Commencement'.

Effect: 
Loss of fire alarms for the duration of this shutdown. 