[169746] in Hotline Meeting
*RESCHEDULED - Bldg. 32D - 9th Floor Kitchen/Roof - Normal Building
daemon@ATHENA.MIT.EDU (Janine Findlay)
Tue May 28 11:37:12 2013
From: Janine Findlay <jfindlay@plant.mit.edu>
To: "mwf@mit.edu" <mwf@mit.edu>, "liscott@mit.edu" <liscott@mit.edu>,
"tommyl@mit.edu" <tommyl@mit.edu>, "myersm@MIT.EDU" <myersm@mit.edu>,
"jackc@csail.mit.edu" <jackc@csail.mit.edu>,
"steverug@CSAIL.MIT.EDU"
<steverug@csail.mit.edu>,
"isabell@mit.edu" <isabell@mit.edu>, "sbleeb@mit.edu" <sbleeb@mit.edu>,
Michael Fahie <mfahie@plant.mit.edu>,
"OPS RM Campus Services Main" <rm-mcs@mit.edu>,
"Martin O'Brien"
<mobrien@plant.mit.edu>,
"Stata-Custodial@mit.edu" <Stata-Custodial@mit.edu>,
Ops CSG All <csg-all@mit.edu>, "dwright@MIT.EDU" <dwright@mit.edu>,
"stata-desk@mit.edu" <stata-desk@mit.edu>,
"rosko@mit.edu" <rosko@mit.edu>, Michael Smith <masmith@mit.edu>,
"edel@mit.edu" <edel@mit.edu>, "shanlon@mit.edu" <shanlon@mit.edu>,
"lrbrutti@mit.edu" <lrbrutti@mit.edu>, "rcruz@mit.edu" <rcruz@mit.edu>,
"aneely@mit.edu" <aneely@mit.edu>,
"MIT
Schedules Office" <schedules@mit.edu>,
"kdonaher@mit.edu" <kdonaher@mit.edu>,
"kasabula@mit.edu" <kasabula@mit.edu>,
"rpittari@mit.edu" <rpittari@mit.edu>,
"ksimons@mit.edu" <ksimons@mit.edu>,
"rwong@brighthorizons.com"
<rwong@brighthorizons.com>,
"worklife@mit.edu" <worklife@mit.edu>,
"shutdowns@mit.edu" <shutdowns@mit.edu>,
Ops RM Electrical Controls Team
<rm-elecctl@mit.edu>,
"rlucas@mit.edu" <rlucas@mit.edu>, "dcrovo@mit.edu"
<dcrovo@mit.edu>,
"whomeyer@mit.edu" <whomeyer@mit.edu>,
"ksemerj@mit.edu"
<ksemerj@mit.edu>,
Ops RM Shutdown <rm-shutdown@mit.edu>
CC: "kdiggans@mit.edu" <kdiggans@mit.edu>
Date: Tue, 28 May 2013 11:36:24 -0400
Message-ID: <4EEA516695C10541B7CB963FF54A56AF13AEE09937@dof-exchmbx01.facilities.ms.mit.edu>
Content-Language: en-US
Content-Type: multipart/alternative;
boundary="_000_4EEA516695C10541B7CB963FF54A56AF13AEE09937dofexchmbx01f_"
MIME-Version: 1.0
--_000_4EEA516695C10541B7CB963FF54A56AF13AEE09937dofexchmbx01f_
Content-Type: text/plain; charset="us-ascii"
Content-Transfer-Encoding: quoted-printable
The following *rescheduled normal building power (120/208V) shutdown reques=
t for Bldg. 32D - 9th Floor Kitchen/Roof, on *Wednesday, May 29*, 2013, 5:0=
0am - 7:00am, is for your information and response. Any questions, please =
contact Billy Homeyer, x8-0432.
Please let us know whether this does or does not have your approval.
Thank you,
Jani Findlay
Comprehensive Stewardship Group
Dept. of Facilities
x3-6381
Type: Normal
Date: May 28, 2013 May 29, 2013
Day: Tuesday Wednesday
Time: 5:00am - 7:00am
Building(s): 32 - Dreyfoos
Room(s): 9th Floor Kitchen/Roof
System: Normal Building Power (120/208V)
Duration: 2 hours
Reason:
We request a bldg 32D-9thfl/roof normal 208V/120V bldg power shutdown, powe=
r panel M2D91 from 5 AM to 7 AM on Tuesday morning, May 28th, 2013 for the =
removal of a welding machine pigtail and the tie-in of temporary power for =
another phase of the 32 roof repairs project by Consigli Construction (Carl=
in Grenier 508-509-2935). Keith Diggans 4-6174 is the MIT project manager.
*Rescheduled - Dear all, I would like to reschedule this bldg 32D-9th fl po=
wer panel M2D91 shutdown to tomorrow morning, Wednesday, May 29th, 2013 fro=
m 5 to 7 AM and include panel M1D91. An MIT Instrument tech will also be on=
site to verify the shutdown and restart of the fan monitoring equipment af=
fected mostly by the shutdown of the second panel (M1D91). The effects of t=
he originally published shutdown remain effectively the same; general conve=
nience outlets, kitchen outlets and some hallway lighting, all on the 9th f=
loor 32D. Your cooperation in this matter is greatly appreciated, Billy H. =
8-0432
Effect:
Loss of normal building power in the area designated, hall lighting, elevat=
or machine room cooling, domestic hot water, and supply cooling air for the=
duration of the shutdown.
--_000_4EEA516695C10541B7CB963FF54A56AF13AEE09937dofexchmbx01f_
Content-Type: text/html; charset="us-ascii"
Content-Transfer-Encoding: quoted-printable
<html xmlns:v=3D"urn:schemas-microsoft-com:vml" xmlns:o=3D"urn:schemas-micr=
osoft-com:office:office" xmlns:w=3D"urn:schemas-microsoft-com:office:word" =
xmlns:m=3D"http://schemas.microsoft.com/office/2004/12/omml" xmlns=3D"http:=
//www.w3.org/TR/REC-html40"><head><META HTTP-EQUIV=3D"Content-Type" CONTENT=
=3D"text/html; charset=3Dus-ascii"><meta name=3DGenerator content=3D"Micros=
oft Word 14 (filtered medium)"><style><!--
/* Font Definitions */
@font-face
{font-family:Calibri;
panose-1:2 15 5 2 2 2 4 3 2 4;}
/* Style Definitions */
p.MsoNormal, li.MsoNormal, div.MsoNormal
{margin:0in;
margin-bottom:.0001pt;
font-size:11.0pt;
font-family:"Calibri","sans-serif";}
a:link, span.MsoHyperlink
{mso-style-priority:99;
color:blue;
text-decoration:underline;}
a:visited, span.MsoHyperlinkFollowed
{mso-style-priority:99;
color:purple;
text-decoration:underline;}
p.MsoPlainText, li.MsoPlainText, div.MsoPlainText
{mso-style-priority:99;
mso-style-link:"Plain Text Char";
margin:0in;
margin-bottom:.0001pt;
font-size:11.0pt;
font-family:"Calibri","sans-serif";}
span.PlainTextChar
{mso-style-name:"Plain Text Char";
mso-style-priority:99;
mso-style-link:"Plain Text";
font-family:"Calibri","sans-serif";}
.MsoChpDefault
{mso-style-type:export-only;
font-family:"Calibri","sans-serif";}
@page WordSection1
{size:8.5in 11.0in;
margin:1.0in 1.0in 1.0in 1.0in;}
div.WordSection1
{page:WordSection1;}
--></style><!--[if gte mso 9]><xml>
<o:shapedefaults v:ext=3D"edit" spidmax=3D"1026" />
</xml><![endif]--><!--[if gte mso 9]><xml>
<o:shapelayout v:ext=3D"edit">
<o:idmap v:ext=3D"edit" data=3D"1" />
</o:shapelayout></xml><![endif]--></head><body lang=3DEN-US link=3Dblue vli=
nk=3Dpurple><div class=3DWordSection1><p class=3DMsoPlainText>The following=
*rescheduled normal building power (120/208V) shutdown request for Bldg. 3=
2D - 9th Floor Kitchen/Roof, on *Wednesday, May 29*, 2013, 5:00am - 7:00am,=
is for your information and response. Any questions, please contact =
Billy Homeyer, x8-0432.<o:p></o:p></p><p class=3DMsoPlainText><o:p> </=
o:p></p><p class=3DMsoPlainText>Please let us know whether this does or doe=
s not have your approval.<o:p></o:p></p><p class=3DMsoPlainText><o:p> =
</o:p></p><p class=3DMsoPlainText>Thank you,<o:p></o:p></p><p class=3DMsoPl=
ainText><o:p> </o:p></p><p class=3DMsoPlainText>Jani Findlay<o:p></o:p=
></p><p class=3DMsoPlainText>Comprehensive Stewardship Group<o:p></o:p></p>=
<p class=3DMsoPlainText>Dept. of Facilities<o:p></o:p></p><p class=3DMsoPla=
inText>x3-6381<o:p></o:p></p><p class=3DMsoPlainText><o:p> </o:p></p><=
p class=3DMsoPlainText>Type: Normal<o:p></o:p></p><p class=3DMsoPlainText>D=
ate: <s>May 28, 2013</s> May 29, 2013<o:p></o:p></p><p class=3DMsoPla=
inText>Day: <s>Tuesday </s> Wednesday<o:p></o:p></p><p class=3DMsoPlai=
nText>Time: 5:00am - 7:00am<o:p></o:p></p><p class=3DMsoPlainText>Building(=
s): 32 - Dreyfoos<o:p></o:p></p><p class=3DMsoPlainText>Room(s): 9th Floor =
Kitchen/Roof<o:p></o:p></p><p class=3DMsoPlainText>System: Normal Building =
Power (120/208V)<o:p></o:p></p><p class=3DMsoPlainText>Duration: 2 hours<o:=
p></o:p></p><p class=3DMsoPlainText>Reason: <o:p></o:p></p><p class=3DMsoPl=
ainText>We request a bldg 32D-9thfl/roof normal 208V/120V bldg power shutdo=
wn, power panel M2D91 from 5 AM to 7 AM on Tuesday morning, May 28th, 2013 =
for the removal of a welding machine pigtail and the tie-in of temporary po=
wer for another phase of the 32 roof repairs project by Consigli Constructi=
on (Carlin Grenier 508-509-2935). Keith Diggans 4-6174 is the MIT project m=
anager.<o:p></o:p></p><p class=3DMsoPlainText><o:p> </o:p></p><p class=
=3DMsoNormal>*Rescheduled - Dear all, I would like to reschedule this bldg =
32D-9<sup>th</sup> fl power panel M2D91 shutdown to tomorrow morning, Wedne=
sday, May 29<sup>th</sup>, 2013 from 5 to 7 AM and include panel M1D91. An =
MIT Instrument tech will also be on site to verify the shutdown and restart=
of the fan monitoring equipment affected mostly by the shutdown of the sec=
ond panel (M1D91). The effects of the originally published shutdown remain =
effectively the same; general convenience outlets, kitchen outlets and some=
hallway lighting, all on the 9<sup>th</sup> floor 32D. Your cooperation in=
this matter is greatly appreciated, Billy H. 8-0432<o:p></o:p></p><p class=
=3DMsoPlainText><span style=3D'color:black'><o:p> </o:p></span></p><p =
class=3DMsoPlainText>Effect: <o:p></o:p></p><p class=3DMsoPlainText>Loss of=
normal building power in the area designated, hall lighting, elevator mach=
ine room cooling, domestic hot water, and supply cooling air for the durati=
on of the shutdown.<o:p></o:p></p><p class=3DMsoPlainText><o:p> </o:p>=
</p></div></body></html>=
--_000_4EEA516695C10541B7CB963FF54A56AF13AEE09937dofexchmbx01f_--