Bldg. E25-6th fl Normal Building Power Shutdown, panel P26A3

daemon@ATHENA.MIT.EDU (shutdown-response@MIT.EDU)
Thu May 16 14:16:58 2013

From: shutdown-response@MIT.EDU
To: <undisclosed_recipients@MIT.EDU>
Cc: <jennygar@MIT.EDU>, <biss@MIT.EDU>
Date: Thu, 16 May 2013 14:16:51 -0400
Message-ID: <3652F5DCBC0E43CB9AA69774DB79A6EC@facilities.ms.mit.edu>
MIME-Version: 1.0
Content-Type: text/plain;
	charset="iso-8859-1"
Content-Transfer-Encoding: 7bit
Content-Class: urn:content-classes:message

The following Normal Building Power Shutdown (panel P26A3) is for bldg. E25-6th fl on Monday, May 20, 2013 from 10:00am - 10:20am is for your information and approval.  Any questions please contact Billy Homeyer x8-0432.


Would you please let us know if this does or does not have your approval.


Thank you,

Jennifer M. Garland
Repair and Maintenance
4-4350

Type: Normal
Date: May 20, 2013
Day: Monday
Time: 10:00am - 10:20am
Building(s): E25
Room(s): 6th fl (panel P26A3)
System: building power
Duration: 10:00am - 10:20am
Reason: 
We request a bldg E25-6th floor normal bldg power panel P26A3 shutdown, located in and serving the Prof Ono Lab, from 10 AM to 10:20 AM on Monday, May 20th, 2013 for MIT HV to tie-in a welding machine for Beacon Piping which will be welding black iron chilled water pipe overnight as part of the E25-6th floor Prof McGee Lab cleanroom project by DC Beane (Ryan Kucinski 617-997-9498). Paul Murphy 4-6163 and Biss Teelucksingh 2-5972 are the MIT project managers.



Effect: 
Loss of building power for the duration of this shutdown. 