[169340] in Hotline Meeting

home help back first fref pref prev next nref lref last post

Approved - Bldg. E25-Floors 1- 6 Heating Hot Water Shutdown

daemon@ATHENA.MIT.EDU (Jennifer Garland)
Thu May 16 10:06:44 2013

From: Jennifer Garland <jennygar@plant.mit.edu>
To: "jdoughty@mit.edu" <jdoughty@mit.edu>, "swade@mit.edu" <swade@mit.edu>,
        "jmganno@MIT.EDU" <jmganno@mit.edu>,
        "macdonaj@mit.edu" <macdonaj@mit.edu>,
        "craigp@MIT.EDU" <craigp@mit.edu>,
        OPS RM Campus Services East
	<rm-ecs@mit.edu>,
        Ops Custodial Admin & Support Staff <cust-staff@mit.edu>,
        "adaz@mit.edu" <adaz@mit.edu>, "bengel@mit.edu" <bengel@mit.edu>,
        "rdfadel@MIT.EDU" <rdfadel@mit.edu>, "tquinn@mit.edu" <tquinn@mit.edu>,
        "ninadm@mit.edu" <ninadm@mit.edu>, Michael Smith <masmith@mit.edu>,
        "brig@med.mit.edu" <brig@med.mit.edu>,
        MIT Schedules Office
	<schedules@mit.edu>,
        "scottide@MIT.EDU" <scottide@mit.edu>,
        "heatherg@mit.edu" <heatherg@mit.edu>,
        "shutdowns@mit.edu"
	<shutdowns@mit.edu>,
        "whomeyer@mit.edu" <whomeyer@mit.edu>,
        "ksemerj@mit.edu"
	<ksemerj@mit.edu>,
        Warren Scott <WScott@plant.mit.edu>,
        Ops RM Shutdown
	<rm-shutdown@mit.edu>, DOF EHS <dof-ehs@mit.edu>,
        "cp-command@mit.edu"
	<cp-command@mit.edu>,
        "safety@mit.edu" <safety@mit.edu>,
        Operators
	<Operators@plant.mit.edu>,
        DOF Customer Service Center <dof-csc@mit.edu>,
        "Ops Custodial Admin & Support Staff" <cust-staff@mit.edu>
CC: "jennygar@mit.edu" <jennygar@mit.edu>, "plyons@mit.edu" <plyons@mit.edu>,
        "biss@mit.edu" <biss@mit.edu>
Date: Thu, 16 May 2013 10:06:32 -0400
Message-ID: <4EEA516695C10541B7CB963FF54A56AF13AE436930@dof-exchmbx01.facilities.ms.mit.edu>
Content-Language: en-US
Content-Type: text/plain; charset="us-ascii"
MIME-Version: 1.0
Content-Transfer-Encoding: 8bit

The following Approved Heating Hot Water Shutdown is for bldg. E25 - floors 1 - 6 is on Friday, May 17, 2013 from 6:00am - 2:00pm is for your information.  Any questions please contact Billy Homeyer  x8-0432.


Thank you,

Jennifer M. Garland
Repair and Maintenance
4-4350

Type: Normal
Date: May 17, 2013
Day: Friday
Time: 6:00am - 2:00pm
Building(s): E25
Room(s): floors 1 - 6
System: heating hot water, supply heating
Duration: 6:00am - 2:00pm
Reason: 
We request a bldg E25-floors 1 thru 6 heating hot water shutdown from 6 AM to 2 PM on Friday, May 17th, 2013 for Beacon Pipe (Dennis Minahan 781-589-6863) to reconfigure some 6th floor heating hot water piping and install isolation valves as part of the E25-6th floor Prof McGee Lab cleanroom project by DC Beane (Ryan Kucinski 617-997-9498). Paul Murphy 4-6163 and Biss Teelucksingh 2-5972 are the MIT project managers.

Effect: 
Loss of heating hot water and supply heating for the duration of this shutdown. 



home help back first fref pref prev next nref lref last post