Bldg. E23- Air Handler #11 - North end flrs , bsmt thru 5 fl. (Pharmacy storefront project)

daemon@ATHENA.MIT.EDU (shutdown-response@MIT.EDU)
Thu May 16 08:54:01 2013

From: shutdown-response@MIT.EDU
To: <undisclosed_recipients@MIT.EDU>
Cc: <jennygar@MIT.EDU>, <biss@MIT.EDU>
Date: Thu, 16 May 2013 08:53:57 -0400
Message-ID: <6DBE6B0EE3754E7290463F6465C781A7@facilities.ms.mit.edu>
MIME-Version: 1.0
Content-Type: text/plain;
	charset="iso-8859-1"
Content-Transfer-Encoding: 7bit
Content-Class: urn:content-classes:message

The following Air Handler #11 - North end flrs , bsmt thru 5 fl. (Pharmacy storefront project) is for bldg. E23 on Saturday, May 18, 2013 from 6:00am til Monday, May 20, 2013 at 6:00am is for your information and approval.  Any questions please contact Billy Homeyer x8-0432.


Would you please let us know if this does or does not have your approval.


Thank you,


Jennifer M. Garland
Repair and Maintenance
4-4350

Type: Normal
Date: May 18, 2013
Day: Saturday
Time: 6:00am (Sat) til 6:00am (Mon)
Building(s): E23
Room(s): North End fls, bsmt thru 5th fl
System: supply ventilation, cooling
Duration: 6:00am (Sat) til 6:00am (Mon)
Reason: 
We request a bldg E23-AH11 shutdown (by the OPS Center) from 6 AM on Saturday morning, May 18th to 6 AM on Monday morning, May 20th, 2013 for the installation of medium pressure ductwork and VAV boxes off the main trunk of AH11 located behind the passenger elevator shaft in the Pediatrics Member Services area E23-191 and to allow time for the duct sealant to set and as part of the E23 Pharmacy storefront project by Elaine Construction (Bernie Cincotta 617-590-3944). Kim Sutherland 8-5962 and Biss Teelucksingh 2-5972 are the MIT project managers.

Effect: 
Loss of supply ventilation and cooling for the duration of this shutdown. 