[169279] in Hotline Meeting
NEED APPROVAL - Extended - To include Thursday, May 13, 2013 - RE:
daemon@ATHENA.MIT.EDU (Jennifer Garland)
Tue May 14 12:39:51 2013
From: Jennifer Garland <jennygar@plant.mit.edu>
To: OPS RM Campus Services Main <rm-mcs@mit.edu>,
"Ops Custodial Admin &
Support Staff" <cust-staff@mit.edu>,
"jbartels@MIT.EDU" <jbartels@mit.edu>,
"mbulsara@mit.edu" <mbulsara@mit.edu>,
"jeileef@mit.edu" <jeileef@mit.edu>, "elk@MIT.EDU" <elk@mit.edu>,
MIT Schedules Office <schedules@mit.edu>,
"jingkong@mit.edu" <jingkong@mit.edu>,
"shutdowns@mit.edu"
<shutdowns@mit.edu>,
"whomeyer@mit.edu" <whomeyer@mit.edu>,
"ksemerj@mit.edu"
<ksemerj@mit.edu>,
Gary Saffie <gsaffie@plant.mit.edu>,
Ops RM Shutdown
<rm-shutdown@mit.edu>
CC: "jennygar@mit.edu" <jennygar@mit.edu>, "biss@mit.edu" <biss@mit.edu>
Date: Tue, 14 May 2013 12:39:43 -0400
Message-ID: <4EEA516695C10541B7CB963FF54A56AF13AD5A89A0@dof-exchmbx01.facilities.ms.mit.edu>
Content-Language: en-US
Content-Type: multipart/alternative;
boundary="_000_4EEA516695C10541B7CB963FF54A56AF13AD5A89A0dofexchmbx01f_"
MIME-Version: 1.0
--_000_4EEA516695C10541B7CB963FF54A56AF13AD5A89A0dofexchmbx01f_
Content-Type: text/plain; charset="us-ascii"
Content-Transfer-Encoding: quoted-printable
The following EXTENDED - Fire Alarm Shutdown (w/*brief live audible testin=
g on 5/3 at 8AM-9AM) for bldg. 13-All is on Thursday, May 2, 2013 from 6:00=
am - 10:00am and then on Friday, May 3, 2013 from 6:00am - 10:00am//*EXTEND=
ED to also include Thursday, May 16, 2013 from 6:00am - 7:00am is for your=
information and approval. Any questions please contact Billy Homeyer x8-0=
432.
Would you please let us know if this does or does not have your approval.
Thank you,
Jennifer M. Garland
Repair and Maintenance
4-4350
Type: Normal
Date: May 2, 2013 ---**EXTENDED to include Thursday, May 16, 2013**
Day: Thursday
Time: 6:00am -10:00am **EXTENDED to include Thursday, May 16, 2013 from =
6:00am - 7:00am**
Building(s): 13
Room(s): All
System: fire alarm
Duration: 6:00am -10:00am 4 hrs
Reason:
**Dear all, I'd like to extend this bldg 13 fire alarm shutdown to include =
a brief *live audible 3rd party test of the bldg 13 fire alarm system betwe=
en 6 and 7 AM on Thursday, May 16th, 2013*. Due to an error in scheduling o=
n my part, JMBCo was not present for the May 3rd test. The 13-3064 toxic ga=
s system reports only a trouble condition to the 13 fire alarm system which=
we will test and then follow with a bldg wide *brief live test*, I apologi=
ze for any inconvenience, Billy H. 8-0432
As usual the 1st floor lab HVAC will be in bypass during the testing. **
We request bldg 13-all fire alarm shutdowns at 6 AM to 10 AM on Thursday, M=
ay 2nd, 2013 and Friday, May 3rd, 2013 for MacNichol Electric (Tom Durant 9=
78-930-6001), Simplex (Bob Gauvin 781-603-7765) and JMBCo (Wayne Maginnis 6=
17-212-2059) to tie-in, program and test the bldg 13-3064 toxic gas system =
that is being tied into the MIT fire alarm system. We will conduct a *brie=
f live audible testing on Friday, May 3rd, 2013 between 8 AM - 9 AM of the =
bldg 13-fire alarm system* as part of the 13-3064 NFS Funded lab renovation=
project by Barr and Barr Builders (John Bidgood 508-686-0870). Biss Teelu=
cksingh is the MIT project manager 2-5972.
Effect:
Loss of fire alarms for the duration of this shutdown.
--_000_4EEA516695C10541B7CB963FF54A56AF13AD5A89A0dofexchmbx01f_
Content-Type: text/html; charset="us-ascii"
Content-Transfer-Encoding: quoted-printable
<html>
<head>
<meta http-equiv=3D"Content-Type" content=3D"text/html; charset=3Dus-ascii"=
>
<meta name=3D"Generator" content=3D"Microsoft Exchange Server">
<!-- converted from rtf -->
<style><!-- .EmailQuote { margin-left: 1pt; padding-left: 4pt; border-left:=
#800000 2px solid; } --></style>
</head>
<body>
<font face=3D"Calibri, sans-serif" size=3D"2">
<div>The following <b>EXTENDED</b> - Fire Alarm Shutdown (w/*brief li=
ve audible testing on 5/3 at 8AM-9AM) for bldg. 13-All is on Thursday, May =
2, 2013 from 6:00am - 10:00am and then on Friday, May 3, 2013 from 6:00am -=
10:00am//*<b>EXTENDED to also include
Thursday, May 16, 2013 from 6:00am - 7:00am</b> is for your informati=
on and <b>approval</b><b>.</b> Any questions please contact Billy Hom=
eyer x8-0432.</div>
<div> </div>
<div><b>Would you please let us know if this does or does not have your app=
roval.</b></div>
<div> </div>
<div> </div>
<div>Thank you,</div>
<div> </div>
<div>Jennifer M. Garland</div>
<div>Repair and Maintenance</div>
<div>4-4350</div>
<div> </div>
<div>Type: Normal</div>
<div>Date: May 2, 2013 ---**<b>EXTENDED to include Thursday, May 16, 2013</=
b>**</div>
<div>Day: Thursday</div>
<div>Time: 6:00am -10:00am **EXTENDED to include Thursday, May =
16, 2013 from 6:00am - 7:00am**</div>
<div>Building(s): 13</div>
<div>Room(s): All</div>
<div>System: fire alarm</div>
<div>Duration: 6:00am -10:00am 4 hrs</div>
<div>Reason: </div>
<div> </div>
<div>**Dear all, I’d like to extend this bldg 13 fire alarm shutdown =
to include a brief *live audible 3rd party test of the bldg 13 fire alarm s=
ystem between 6 and 7 AM on Thursday, May 16th, 2013*. Due to an error in s=
cheduling on my part, JMBCo was not present
for the May 3rd test. The 13-3064 toxic gas system reports only a trouble c=
ondition to the 13 fire alarm system which we will test and then follow wit=
h a bldg wide *brief live test*, I apologize for any inconvenience, Billy H=
. 8-0432 </div>
<div> </div>
<div>As usual the 1st floor lab HVAC will be in bypass during the testing. =
**</div>
<div> </div>
<div> </div>
<div> </div>
<div>We request bldg 13-all fire alarm shutdowns at 6 AM to 10 AM on Thursd=
ay, May 2nd, 2013 and Friday, May 3rd, 2013 for MacNichol Electric (Tom Dur=
ant 978-930-6001), Simplex (Bob Gauvin 781-603-7765) and JMBCo (Wayne Magin=
nis 617-212-2059) to tie-in, program
and test the bldg 13-3064 toxic gas system that is being tied into the MIT =
fire alarm system. We will conduct a *brief live audible testing on F=
riday, May 3rd, 2013 between 8 AM - 9 AM of the bldg 13-fire alarm system* =
as part of the 13-3064 NFS Funded lab
renovation project by Barr and Barr Builders (John Bidgood 508-686-0870).&n=
bsp; Biss Teelucksingh is the MIT project manager 2-5972.</div>
<div> </div>
<div>Effect: </div>
<div>Loss of fire alarms for the duration of this shutdown.</div>