Approved - -- Extended - Bldg. 6- All Hot and Cold Lab Process

daemon@ATHENA.MIT.EDU (Jennifer Garland)
Fri May 10 14:50:38 2013

From: Jennifer Garland <jennygar@plant.mit.edu>
To: "jdoughty@mit.edu" <jdoughty@MIT.EDU>, "swade@mit.edu" <swade@MIT.EDU>,
        "rjwilk@mit.edu" <rjwilk@MIT.EDU>, "galanek@mit.edu" <galanek@MIT.EDU>,
        "bobk@mit.edu" <bobk@MIT.EDU>, "nmorriso@MIT.EDU" <nmorriso@MIT.EDU>,
        "Paul
 Lyons" <plyons@plant.mit.edu>,
        OPS RM Campus Services Main <rm-mcs@MIT.EDU>,
        Gerry Hughes <ghughes@MIT.EDU>, "Tarky@mit.edu" <Tarky@MIT.EDU>,
        "khewitt@mit.edu" <khewitt@MIT.EDU>, "elsye@MIT.EDU" <elsye@MIT.EDU>,
        "cmodica@mit.edu" <cmodica@MIT.EDU>, "morley@mit.edu" <morley@MIT.EDU>,
        "MIT
 Schedules Office" <schedules@MIT.EDU>,
        "scottide@MIT.EDU" <scottide@MIT.EDU>,
        "jimwhite@MIT.EDU" <jimwhite@MIT.EDU>,
        "heatherg@mit.edu" <heatherg@MIT.EDU>,
        "chibcha@MIT.EDU" <chibcha@MIT.EDU>, "zqueen@mit.edu" <zqueen@MIT.EDU>,
        "shutdowns@mit.edu" <shutdowns@MIT.EDU>,
        "whomeyer@mit.edu"
	<whomeyer@MIT.EDU>,
        "ksemerj@mit.edu" <ksemerj@MIT.EDU>,
        David Hingston
	<dhingsto@plant.mit.edu>,
        Ops RM Shutdown <rm-shutdown@MIT.EDU>, DOF EHS
	<dof-ehs@MIT.EDU>,
        "cp-command@mit.edu" <cp-command@MIT.EDU>,
        "safety@mit.edu" <safety@MIT.EDU>, Operators <Operators@plant.mit.edu>,
        "DOF
 Customer Service Center" <dof-csc@MIT.EDU>,
        "Ops Custodial Admin & Support
 Staff" <cust-staff@MIT.EDU>
CC: "jennygar@mit.edu" <jennygar@MIT.EDU>, "healyb@mit.edu" <healyb@MIT.EDU>
Date: Fri, 10 May 2013 14:50:29 -0400
Message-ID: <4EEA516695C10541B7CB963FF54A56AF13AD41F093@dof-exchmbx01.facilities.ms.mit.edu>
Content-Language: en-US
Content-Type: multipart/alternative;
	boundary="_000_4EEA516695C10541B7CB963FF54A56AF13AD41F093dofexchmbx01f_"
MIME-Version: 1.0

--_000_4EEA516695C10541B7CB963FF54A56AF13AD41F093dofexchmbx01f_
Content-Type: text/plain; charset="us-ascii"
Content-Transfer-Encoding: quoted-printable

The following APPROVED  - EXTENDED Hot and Cold Lab Process Water (lab sink=
s) Shutdown is for bldg. 6 - all on Monday, May 13, 2013 - at 11:00PM til T=
uesday, May 14, 2013 at 7:00AM//**EXTENDED to include 11:00pm to 7:00am on =
Wednesday May 15th til Friday May 17th into Saturday morning and then again=
 on Monday, May 20th is for your information.  Any questions please contact=
 Billy Homeyer x8-0432.



Thank you,


Jennifer M. Garland
Repair and Maintenance
4-4350

Type: Normal
Date: May 13, 2013
Day: Monday
Time: 11:00PM (Mon) - 7:00AM (Tue)--- extended to include 11PM - 7AM Wednes=
day, May 15th til Friday, May 17th into Saturday, then again on Monday, May=
 20th***
Building(s): 6
Room(s): All
System: hot/cold lab process water
Duration: 11:00PM (Mon) - 7:00AM (Tue)  ---- extended to include 11PM - 7AM=
 Wednesday, May 15th til Friday, May 17th into Saturday, then again on Mond=
ay, May 20th***

Reason:   NEED APPROVAL
**EXTENDED:  We would like to extend the bldg 6-all hot & cold lab process =
(lab sinks) shutdowns at 11 PM to 7 AM to include Wednesday, May 15th  thro=
ugh Friday, May 17th (into Saturday morning) and Monday, May 20th, 2013  as=
 more work has been anticipated to demo glass waste piping throughout the 2=
nd floor (NOTE:  all bldg 6 lab sinks will be without water during this tim=
e) part of the bldg 6-lab waste transfer system installation project by AHC=
 Mechanical (Guy Fossiano 781-844-7815).  Both the shutdown request form an=
d work order #5186017 has been modified to reflect this change.

Lock-out/tag-out is required.***


We request bldg 6-all hot & cold lab process water (lab sinks) shutdowns at=
 11 PM to 7 AM starting on Monday ,May 13th to Tuesday, May 14th (into Tues=
day morning) to demo glass lab waste pipe on 2nd floor (NOTE:  all bldg 6 l=
ab sinks will be without water during this time) as part of the bldg 6-lab =
waste transfer system installation project by AHC Mechanical (Guy Fossiano =
781-844-7815).  Brian Healy 8-8565 is the MIT project manager on behalf of =
Billy Homeyer.

Effect:
Loss of hot/cold lab process water for the duration of this shutdown.



--_000_4EEA516695C10541B7CB963FF54A56AF13AD41F093dofexchmbx01f_
Content-Type: text/html; charset="us-ascii"
Content-Transfer-Encoding: quoted-printable

<html>
<head>
<meta http-equiv=3D"Content-Type" content=3D"text/html; charset=3Dus-ascii"=
>
<meta name=3D"Generator" content=3D"Microsoft Exchange Server">
<!-- converted from rtf -->
<style><!-- .EmailQuote { margin-left: 1pt; padding-left: 4pt; border-left:=
 #800000 2px solid; } --></style>
</head>
<body>
<font face=3D"Calibri, sans-serif" size=3D"2">
<div>The following<font color=3D"#1F497D"> APPROVED&nbsp; - </font>EXTENDED=
 Hot and Cold Lab Process Water (lab sinks) Shutdown is for bldg. 6 - all o=
n Monday, May 13, 2013 - at 11:00PM til Tuesday, May 14, 2013 at 7:00AM//**=
<b>EXTENDED to include 11:00pm to 7:00am
on Wednesday May 15th til Friday May 17th into Saturday morning and then ag=
ain on Monday, May 20th </b>is for your information.&nbsp; Any questions pl=
ease contact Billy Homeyer x8-0432.</div>
<div>&nbsp;</div>
<div>&nbsp;</div>
<div>&nbsp;</div>
<div>Thank you,</div>
<div>&nbsp;</div>
<div>&nbsp;</div>
<div>Jennifer M. Garland</div>
<div>Repair and Maintenance</div>
<div>4-4350</div>
<div>&nbsp;</div>
<div>Type: Normal</div>
<div>Date: May 13, 2013</div>
<div>Day: Monday</div>
<div>Time: 11:00PM (Mon) - 7:00AM (Tue)--- extended to include 11PM &#8211;=
 7AM Wednesday, May 15<font size=3D"1"><sup>th</sup></font> til Friday, May=
 17<font size=3D"1"><sup>th</sup></font> into Saturday, then again on Monda=
y, May 20<font size=3D"1"><sup>th</sup></font>***</div>
<div>Building(s): 6</div>
<div>Room(s): All</div>
<div>System: hot/cold lab process water</div>
<div>Duration: 11:00PM (Mon) - 7:00AM (Tue)&nbsp; ---- extended to include =
11PM &#8211; 7AM Wednesday, May 15<font size=3D"1"><sup>th</sup></font> til=
 Friday, May 17<font size=3D"1"><sup>th</sup></font> into Saturday, then ag=
ain on Monday, May 20<font size=3D"1"><sup>th</sup></font>***</div>
<div>&nbsp;</div>
<div>Reason:&nbsp;&nbsp; <b>NEED APPROVAL</b></div>
<div><b>**EXTENDED:&nbsp; We would like to extend the bldg 6-all hot &amp; =
cold lab process (lab sinks) shutdowns at </b><b>11 PM to 7 AM to include W=
ednesday, May 15</b><font size=3D"1"><sup><b>th</b></sup></font><b> &nbsp;t=
hrough Friday, May 17th (into Saturday morning)
and Monday, May 20</b><font size=3D"1"><sup><b>th</b></sup></font><b>, 2013=
</b><b> &nbsp;as more work has been anticipated to demo glass waste piping =
throughout the 2</b><font size=3D"1"><sup><b>nd</b></sup></font><b> floor (=
NOTE:&nbsp; all bldg 6 lab sinks will be without
water during this time) part of the bldg 6-lab waste transfer system instal=
lation project by AHC Mechanical (Guy Fossiano 781-844-7815).&nbsp; Both th=
e shutdown request form and work order #5186017 has been modified to reflec=
t this change.</b></div>
<div><font color=3D"#1F497D">&nbsp;</font></div>
<div><font color=3D"#1F497D"><b>Lock-out/tag-out is required.***</b></font>=
</div>
<div>&nbsp;</div>
<div>&nbsp;</div>
<div>We request bldg 6-all hot &amp; cold lab process water (lab sinks) shu=
tdowns at 11 PM to 7 AM starting on Monday ,May 13th to Tuesday, May 14th (=
into Tuesday morning) to demo glass lab waste pipe on 2nd floor (NOTE:&nbsp=
; all bldg 6 lab sinks will be without water
during this time) as part of the bldg 6-lab waste transfer system installat=
ion project by AHC Mechanical (Guy Fossiano 781-844-7815).&nbsp; Brian Heal=
y 8-8565 is the MIT project manager on behalf of Billy Homeyer.</div>
<div>&nbsp;</div>
<div>Effect: </div>
<div>Loss of hot/cold lab process water for the duration of this shutdown. =
</div>
<div>&nbsp;</div>
<div>&nbsp;</div>
</font>
</body>
</html>

--_000_4EEA516695C10541B7CB963FF54A56AF13AD41F093dofexchmbx01f_--

home help back first fref pref prev next nref lref last post