[169159] in Hotline Meeting
Approved - -- Extended - Bldg. 6- All Hot and Cold Lab Process
daemon@ATHENA.MIT.EDU (Jennifer Garland)
Fri May 10 14:50:38 2013
From: Jennifer Garland <jennygar@plant.mit.edu>
To: "jdoughty@mit.edu" <jdoughty@MIT.EDU>, "swade@mit.edu" <swade@MIT.EDU>,
"rjwilk@mit.edu" <rjwilk@MIT.EDU>, "galanek@mit.edu" <galanek@MIT.EDU>,
"bobk@mit.edu" <bobk@MIT.EDU>, "nmorriso@MIT.EDU" <nmorriso@MIT.EDU>,
"Paul
Lyons" <plyons@plant.mit.edu>,
OPS RM Campus Services Main <rm-mcs@MIT.EDU>,
Gerry Hughes <ghughes@MIT.EDU>, "Tarky@mit.edu" <Tarky@MIT.EDU>,
"khewitt@mit.edu" <khewitt@MIT.EDU>, "elsye@MIT.EDU" <elsye@MIT.EDU>,
"cmodica@mit.edu" <cmodica@MIT.EDU>, "morley@mit.edu" <morley@MIT.EDU>,
"MIT
Schedules Office" <schedules@MIT.EDU>,
"scottide@MIT.EDU" <scottide@MIT.EDU>,
"jimwhite@MIT.EDU" <jimwhite@MIT.EDU>,
"heatherg@mit.edu" <heatherg@MIT.EDU>,
"chibcha@MIT.EDU" <chibcha@MIT.EDU>, "zqueen@mit.edu" <zqueen@MIT.EDU>,
"shutdowns@mit.edu" <shutdowns@MIT.EDU>,
"whomeyer@mit.edu"
<whomeyer@MIT.EDU>,
"ksemerj@mit.edu" <ksemerj@MIT.EDU>,
David Hingston
<dhingsto@plant.mit.edu>,
Ops RM Shutdown <rm-shutdown@MIT.EDU>, DOF EHS
<dof-ehs@MIT.EDU>,
"cp-command@mit.edu" <cp-command@MIT.EDU>,
"safety@mit.edu" <safety@MIT.EDU>, Operators <Operators@plant.mit.edu>,
"DOF
Customer Service Center" <dof-csc@MIT.EDU>,
"Ops Custodial Admin & Support
Staff" <cust-staff@MIT.EDU>
CC: "jennygar@mit.edu" <jennygar@MIT.EDU>, "healyb@mit.edu" <healyb@MIT.EDU>
Date: Fri, 10 May 2013 14:50:29 -0400
Message-ID: <4EEA516695C10541B7CB963FF54A56AF13AD41F093@dof-exchmbx01.facilities.ms.mit.edu>
Content-Language: en-US
Content-Type: multipart/alternative;
boundary="_000_4EEA516695C10541B7CB963FF54A56AF13AD41F093dofexchmbx01f_"
MIME-Version: 1.0
--_000_4EEA516695C10541B7CB963FF54A56AF13AD41F093dofexchmbx01f_
Content-Type: text/plain; charset="us-ascii"
Content-Transfer-Encoding: quoted-printable
The following APPROVED - EXTENDED Hot and Cold Lab Process Water (lab sink=
s) Shutdown is for bldg. 6 - all on Monday, May 13, 2013 - at 11:00PM til T=
uesday, May 14, 2013 at 7:00AM//**EXTENDED to include 11:00pm to 7:00am on =
Wednesday May 15th til Friday May 17th into Saturday morning and then again=
on Monday, May 20th is for your information. Any questions please contact=
Billy Homeyer x8-0432.
Thank you,
Jennifer M. Garland
Repair and Maintenance
4-4350
Type: Normal
Date: May 13, 2013
Day: Monday
Time: 11:00PM (Mon) - 7:00AM (Tue)--- extended to include 11PM - 7AM Wednes=
day, May 15th til Friday, May 17th into Saturday, then again on Monday, May=
20th***
Building(s): 6
Room(s): All
System: hot/cold lab process water
Duration: 11:00PM (Mon) - 7:00AM (Tue) ---- extended to include 11PM - 7AM=
Wednesday, May 15th til Friday, May 17th into Saturday, then again on Mond=
ay, May 20th***
Reason: NEED APPROVAL
**EXTENDED: We would like to extend the bldg 6-all hot & cold lab process =
(lab sinks) shutdowns at 11 PM to 7 AM to include Wednesday, May 15th thro=
ugh Friday, May 17th (into Saturday morning) and Monday, May 20th, 2013 as=
more work has been anticipated to demo glass waste piping throughout the 2=
nd floor (NOTE: all bldg 6 lab sinks will be without water during this tim=
e) part of the bldg 6-lab waste transfer system installation project by AHC=
Mechanical (Guy Fossiano 781-844-7815). Both the shutdown request form an=
d work order #5186017 has been modified to reflect this change.
Lock-out/tag-out is required.***
We request bldg 6-all hot & cold lab process water (lab sinks) shutdowns at=
11 PM to 7 AM starting on Monday ,May 13th to Tuesday, May 14th (into Tues=
day morning) to demo glass lab waste pipe on 2nd floor (NOTE: all bldg 6 l=
ab sinks will be without water during this time) as part of the bldg 6-lab =
waste transfer system installation project by AHC Mechanical (Guy Fossiano =
781-844-7815). Brian Healy 8-8565 is the MIT project manager on behalf of =
Billy Homeyer.
Effect:
Loss of hot/cold lab process water for the duration of this shutdown.
--_000_4EEA516695C10541B7CB963FF54A56AF13AD41F093dofexchmbx01f_
Content-Type: text/html; charset="us-ascii"
Content-Transfer-Encoding: quoted-printable
<html>
<head>
<meta http-equiv=3D"Content-Type" content=3D"text/html; charset=3Dus-ascii"=
>
<meta name=3D"Generator" content=3D"Microsoft Exchange Server">
<!-- converted from rtf -->
<style><!-- .EmailQuote { margin-left: 1pt; padding-left: 4pt; border-left:=
#800000 2px solid; } --></style>
</head>
<body>
<font face=3D"Calibri, sans-serif" size=3D"2">
<div>The following<font color=3D"#1F497D"> APPROVED - </font>EXTENDED=
Hot and Cold Lab Process Water (lab sinks) Shutdown is for bldg. 6 - all o=
n Monday, May 13, 2013 - at 11:00PM til Tuesday, May 14, 2013 at 7:00AM//**=
<b>EXTENDED to include 11:00pm to 7:00am
on Wednesday May 15th til Friday May 17th into Saturday morning and then ag=
ain on Monday, May 20th </b>is for your information. Any questions pl=
ease contact Billy Homeyer x8-0432.</div>
<div> </div>
<div> </div>
<div> </div>
<div>Thank you,</div>
<div> </div>
<div> </div>
<div>Jennifer M. Garland</div>
<div>Repair and Maintenance</div>
<div>4-4350</div>
<div> </div>
<div>Type: Normal</div>
<div>Date: May 13, 2013</div>
<div>Day: Monday</div>
<div>Time: 11:00PM (Mon) - 7:00AM (Tue)--- extended to include 11PM –=
7AM Wednesday, May 15<font size=3D"1"><sup>th</sup></font> til Friday, May=
17<font size=3D"1"><sup>th</sup></font> into Saturday, then again on Monda=
y, May 20<font size=3D"1"><sup>th</sup></font>***</div>
<div>Building(s): 6</div>
<div>Room(s): All</div>
<div>System: hot/cold lab process water</div>
<div>Duration: 11:00PM (Mon) - 7:00AM (Tue) ---- extended to include =
11PM – 7AM Wednesday, May 15<font size=3D"1"><sup>th</sup></font> til=
Friday, May 17<font size=3D"1"><sup>th</sup></font> into Saturday, then ag=
ain on Monday, May 20<font size=3D"1"><sup>th</sup></font>***</div>
<div> </div>
<div>Reason: <b>NEED APPROVAL</b></div>
<div><b>**EXTENDED: We would like to extend the bldg 6-all hot & =
cold lab process (lab sinks) shutdowns at </b><b>11 PM to 7 AM to include W=
ednesday, May 15</b><font size=3D"1"><sup><b>th</b></sup></font><b> t=
hrough Friday, May 17th (into Saturday morning)
and Monday, May 20</b><font size=3D"1"><sup><b>th</b></sup></font><b>, 2013=
</b><b> as more work has been anticipated to demo glass waste piping =
throughout the 2</b><font size=3D"1"><sup><b>nd</b></sup></font><b> floor (=
NOTE: all bldg 6 lab sinks will be without
water during this time) part of the bldg 6-lab waste transfer system instal=
lation project by AHC Mechanical (Guy Fossiano 781-844-7815). Both th=
e shutdown request form and work order #5186017 has been modified to reflec=
t this change.</b></div>
<div><font color=3D"#1F497D"> </font></div>
<div><font color=3D"#1F497D"><b>Lock-out/tag-out is required.***</b></font>=
</div>
<div> </div>
<div> </div>
<div>We request bldg 6-all hot & cold lab process water (lab sinks) shu=
tdowns at 11 PM to 7 AM starting on Monday ,May 13th to Tuesday, May 14th (=
into Tuesday morning) to demo glass lab waste pipe on 2nd floor (NOTE: =
; all bldg 6 lab sinks will be without water
during this time) as part of the bldg 6-lab waste transfer system installat=
ion project by AHC Mechanical (Guy Fossiano 781-844-7815). Brian Heal=
y 8-8565 is the MIT project manager on behalf of Billy Homeyer.</div>
<div> </div>
<div>Effect: </div>
<div>Loss of hot/cold lab process water for the duration of this shutdown. =
</div>
<div> </div>
<div> </div>
</font>
</body>
</html>
--_000_4EEA516695C10541B7CB963FF54A56AF13AD41F093dofexchmbx01f_--