[168815] in Hotline Meeting

home help back first fref pref prev next nref lref last post

Approved Bldg. E23 - 1st Floor Sprinkler System Shutdown Notification

daemon@ATHENA.MIT.EDU (shutdown-response@MIT.EDU)
Thu May 2 16:09:03 2013

From: shutdown-response@MIT.EDU
To: <undisclosed_recipients@MIT.EDU>
Cc: <biss@MIT.EDU>
Date: Thu, 2 May 2013 16:03:47 -0400
Message-ID: <984B29D5F38443859C9306EDEF9B0FCD@facilities.ms.mit.edu>
MIME-Version: 1.0
Content-Type: text/plain;
	charset="iso-8859-1"
Content-Transfer-Encoding: 7bit
Content-Class: urn:content-classes:message

The following sprinkler system, shutdown notification for Bldg. E23 - 1st Floor on Saturday, May 4, 2013 from 6am to 3pm is for your information. No response required to this notification. Any question please contact Billy Homeyer @ 8-0432

We appreciate your patience while the repairs/renovations are in progress.

Thank you
Bill Lombard
Operations Center


Type: Normal
Date: March 4, 2013
Day: Saturday
Time: 6am
Building(s): E23
Room(s): 1st Floor
System: Fire Protection Water
Duration: 9 hours
Reason: 
As a precautionary measure to remove existing metal hung ceiling in Member Services

Effect: 
Loss of fire protection system. The Safety Office will be advised of this and notify the Fire Department.

home help back first fref pref prev next nref lref last post