[16640] in Hotline Meeting

home help back first fref pref prev next nref lref last post

Shutdown re: Cogen Project

daemon@ATHENA.MIT.EDU (aafia@MIT.EDU)
Wed Jun 23 15:04:20 1993

From: aafia@MIT.EDU
Date: Wed, 23 Jun 93 15:04:17
To: shutdowns@MIT.EDU

In The Name of Allah, The Compassionate, The Merciful:

Mary Files from Phy. Plant:

Bldg. 2 No power to the entire building, no cooling, no ventilation, no 
hood exhaust.

Bldg. 4 No 480 volt lab power

Bldg. 10, Chilled water pumps serving bldg. 10 and the president's 
office area will be off. No air conditioning except for the Barker 
library 5th through the 8th floors.

Bldg 20, No power to the entire building, no cooling, no steam to the 
building, no domestic hot water.

Bldg. 26, No 480 volt lab power, but the HVAC systems will not be 
affected.

Bldg 31, The east end will be without power and no domestic hot water.

Bldg 70 (east garage) No lighting.

Sunday 6/27/93 from 7 am till 9 pm. Things could possibly go on earlier 
as well.

Please call Mary Files 3-1500 and OK this.

Thanks

home help back first fref pref prev next nref lref last post