[16290] in Hotline Meeting

home help back first fref pref prev next nref lref last post

June 10 11pm to June 11 7am. Fourth floor of 39

daemon@ATHENA.MIT.EDU (Susan Kim)
Fri Jun 4 09:24:45 1993

Date: Fri, 04 Jun 93 09:24:53 -700
From: hykim@MIT.EDU (Susan Kim)
To: shutdowns@MIT.EDU

Mike from physical plant called with shutdown to occur June 10 11pm to 
June 11 7am in 39-4th floor clean room.  They will be shutting down the 
RO pumps and the return coil fans.  
Please confirm.

Susan Kim 
Network Help Desk

home help back first fref pref prev next nref lref last post