[160417] in Hotline Meeting
Bldg. W71 - All, Normal Emergency Building Power Shutdown Request
daemon@ATHENA.MIT.EDU (shutdown-response@MIT.EDU)
Wed Jul 25 14:38:04 2012
From: shutdown-response@MIT.EDU
To: <undisclosed_recipients@MIT.EDU>
Cc: <kdiggans@MIT.EDU>
Date: Wed, 25 Jul 2012 14:38:00 -0400
Message-ID: <40366428F7B04F71ADA96E948688A02E@facilities.ms.mit.edu>
MIME-Version: 1.0
Content-Type: text/plain;
charset="iso-8859-1"
Content-Transfer-Encoding: 7bit
Content-Class: urn:content-classes:message
The following normal emergency building power shutdown request for Bldg. W71 - All, on Friday, July 27, 2012, 6:00am - 7:00am, is for your information and response. Any questions, please contact Billy Homeyer, x8-0432.
Please let us know whether this does or does not have your approval.
Thank you,
Jani Findlay
Repair and Maintenance
x3-6381
Type: Normal
Date: July 27, 2012
Day: Friday
Time: 6:00am - 7:00am
Building(s): W71
Room(s): All
System: Normal Emergency Building Power
Duration: 1 hour
Reason:
We request a bldg W71 normal emergency power shutdown from 6 AM to 7 AM on Friday morning, July 27th, 2012 for JMBCo (Tom Rose 617-799-7171) to replace the 30A jockey pump circuit breaker (pump has been removed) with a 20A breaker and feed an air compressor for the dry sprinkler system at the 1st floor loading dock (EP panel is near loading dock also) and as part of the W71 life-safety upgrades project by Shawmut Construction (Tom Ploude 781-983-3850). Keith Diggans 4-6174 is the MIT project manager.
Effect:
Loss of normal emergency building power for the duration of the shutdown.