[160384] in Hotline Meeting

home help back first fref pref prev next nref lref last post

Bldg. 26 - All, Normal Building Power and Lighting Shutdown Request

daemon@ATHENA.MIT.EDU (shutdown-response@MIT.EDU)
Wed Jul 25 07:21:38 2012

From: shutdown-response@MIT.EDU
To: <undisclosed_recipients@MIT.EDU>
Cc: <rlucas@MIT.EDU>
Date: Wed, 25 Jul 2012 07:21:21 -0400
Message-ID: <BF62E65116E44EDBB2D6E8C0234A70BC@facilities.ms.mit.edu>
MIME-Version: 1.0
Content-Type: text/plain;
	charset="iso-8859-1"
Content-Transfer-Encoding: 8bit
Content-Class: urn:content-classes:message

The following normal building power and lighting shutdown request for Bldg. 26 - All, on Wednesday, August 15, 2012, 8:00am - 9:00am, is for your information and response.  Any questions, please contact Rich Lucas, x4-6801.

Please let us know whether this does or does not have your approval.

Thank you,

Jani Findlay
Repair and Maintenance
x3-6381

Type: Normal
Date: August 15, 2012
Day: Wednesday
Time: 8:00am - 9:00am
Building(s): 26
Room(s): All
System: Normal Building Power and Lighting
Duration: 1 hour total (10 minutes per circuit breaker)
Reason: 
Since testing the main electrical equipment in building 26 earlier this year the test reports came back to me and there are a bunch of circuit breakers that failed to meet the manufacturer's specifications on trip times.  To streamline the process of replacing them I had five replacements made and I'd like to start scheduling the replacements five at a time.  Doing it this way is the fastest solution to changing out the circuit breakers.  This will have to happen several times over the next year because these are custom circuit breakers and even getting our hands on 5 to start the process was expensive and difficult.

Fortunately these shutdowns are all brief¬ - 10 minutes from beginning to end (for each circuit).  Since there are five to do I'm requesting a one hour span to do the first five.  It is impossible to know for sure what equipment will be affected so everyone must be prepared for a complete shutdown during the timeframe.  Please have someone in your lab or office check your critical equipment to make sure it reset and came back on.
Shutdown # 1 - Wednesday, 8:00 to 9:00 AM, August 15, 2012.

Thank you for understanding and let me know any questions you might have.

Emergency Power has been taken care of so it will not be affected.
The duration is so short I don't see the need to any extension cords to be run.

Thank you,
Rich Lucas
Sr. Electrical Engineer ¬ Utilities
MIT Department of Facilities
Phone: 617-324-6801


Effect: 
Loss of access controls, normal building power, elevators, computers, telephones, lighting (including corridors/stairs), chilled water, condenser water, supply ventilation and cooling air, laboratory, general, and toilet exhaust, and exhaust hoods for the duration of the shutdown.