[160086] in Hotline Meeting
Approved - Bldg. W2 - All Fire Alarm w/live audible testing
daemon@ATHENA.MIT.EDU (Bernadette Drinkwater)
Thu Jul 12 14:34:24 2012
From: Bernadette Drinkwater <BDrink@plant.mit.edu>
To: OPS RM Campus Services West <rm-wcs@MIT.EDU>, "src@MIT.EDU" <src@MIT.EDU>,
"hmgr@mit.edu" <hmgr@MIT.EDU>, "kcn@mit.edu" <kcn@MIT.EDU>,
"mwhelan@mit.edu"
<mwhelan@MIT.EDU>
CC: "shutdowns@mit.edu" <shutdowns@MIT.EDU>,
Billy Homeyer
<whomeyer@plant.mit.edu>,
"cp-command@mit.edu" <cp-command@MIT.EDU>,
"safety@mit.edu" <safety@MIT.EDU>, Operators <Operators@plant.mit.edu>,
"DOF
Customer Service Center" <dof-csc@MIT.EDU>,
Ops RM Shutdown
<rm-shutdown@MIT.EDU>,
Ops RM Fire Protection Team
<rm-fire-prot-team@MIT.EDU>
Date: Thu, 12 Jul 2012 14:34:20 -0400
Message-ID: <4EEA516695C10541B7CB963FF54A56AF0CEADE4152@dof-exchmbx01.facilities.ms.mit.edu>
Content-Language: en-US
Content-Type: text/plain; charset="us-ascii"
MIME-Version: 1.0
Content-Transfer-Encoding: 8bit
The following Approved Fire Alarm Testing with live Audible shutdown for Bldg. W2 - All on Friday, July 13, 2012 is for your information. Any questions, please contact Billy Homeyer x8-0432.
Thank you,
Bernadette Drinkwater
Repair and Maintenance
x3-0938
We request a Bldg W2-all fire alarm shutdown from 6 AM to 2 PM for JMBCo to identify fire alarm panel wiring in preparation for the installation of a new panel. JMBCo requests MIT jack-out the DGP and power down of the main fire alarm panel as part of the W2 life-safety and suite upgrades/renovation project by Shawmut Construction (Pat Coburn 617-594-1500). Sudy Nally 8-8010 and Biss Teelucksingh 2-5972 are the MIT project managers.
We will conduct *live audible testing of the bldg W2 fire alarm system once the system has been restored, 1 PM to 2 PM*.
Type: Normal
Date: July 13, 2012
Day: Friday
Time: 6:00am - 2:00pm
Building(s): W2
Room(s): All
System: Fire Alarms
Duration: 8 hours
Reason:
JMBCO to power down panel, pull cards, identify wiring. live test.
Effect:
Fire Alarms.