[159685] in Hotline Meeting
Bldg. 62 and 64 - All, Normal Building Power and Lighting Shutdown Request
daemon@ATHENA.MIT.EDU (shutdown-response@MIT.EDU)
Tue Jun 26 10:02:55 2012
From: shutdown-response@MIT.EDU
To: <undisclosed_recipients@MIT.EDU>
Cc: <rlucas@MIT.EDU>
Date: Tue, 26 Jun 2012 10:02:52 -0400
Message-ID: <57EE7CB535064149AC95869160EAF4D5@facilities.ms.mit.edu>
MIME-Version: 1.0
Content-Type: text/plain;
charset="iso-8859-1"
Content-Transfer-Encoding: 7bit
Content-Class: urn:content-classes:message
The following normal building power and lighting shutdown request for Bldg. 62 and 64 - All, on Monday, July 16, 2012, at 6:00am through 4:00pm on Friday, July 20, 2012, is for your information and response. Any questions, please contact Rich Lucas, x4-6801.
Please let us know whether this does or does not have your approval.
Thank you,
Jani Findlay
Repair and Maintenance
x3-6381
Type: Normal
Date: July 16, 2012
Day: Monday
Time: 6:00am (7/16) through 4:00pm (7/20)
Building(s): 62 and 64
Room(s): All
System: Normal Building Power and Lighting
Duration: 5 days
Reason:
Shutdown of All Normal Power & Lighting in Buildings 62 & 64 is requested in order to perform a major repair and PM of the Switchgear. This repair will take up to 5 days so I've worked out this schedule with Dennis Collins of Housing to have the building empty during this week. Shutdown would begin Monday 6:00 AM July 16 and continue until Friday 4:00 PM July 20.
Emergency Power will remain on during this shutdown.
The buildings should be empty during this time except for the Main Electrical room 62-001A.
Effect:
Loss of emergency generator, building power, elevators, computers, telephones, lighting (including corridors/stairs), supply ventilation/cooling air, general/toilet exhaust, storm drain/sanitary drainage, and smoke detectors (daily) for the duration of the shutdown.