Bldg. 66 - Subbasement through 2nd Floor - Normal 480V Building Power (277v lighting; normal lighting only) Shutdown Request
daemon@ATHENA.MIT.EDU (shutdown-response@MIT.EDU)
Tue Jun 12 13:12:23 2012
From: shutdown-response@MIT.EDU
To: <undisclosed_recipients@MIT.EDU>
Cc: <koskae@MIT.EDU>
Date: Tue, 12 Jun 2012 13:12:19 -0400
Message-ID: <FD29073E347C4C329E274576CF072152@facilities.ms.mit.edu>
MIME-Version: 1.0
Content-Type: text/plain;
charset="iso-8859-1"
Content-Transfer-Encoding: 7bit
Content-Class: urn:content-classes:message
The following normal 480V building power (277v lighting; normal lighting only) shutdown request for Bldg. 66 - Subbasement through 2nd Floor, on Monday, June 18, 2012, 5:00am - 6:00am, is for your information and response. Any questions, please contact Billy Homeyer, x8-0432.
Please let us know whether this does or does not have your approval.
Thank you,
Jani Findlay
Repair and Maintenance
x3-6381
Type: Normal
Date: June 18, 2012
Day: Monday
Time: 5:00am - 6:00am
Building(s): 66
Room(s): Subbasement through 2nd Floor
System: Normal 480V Building Power (277v lighting; normal lighting only)
Duration: 1 hour
Reason:
We request a bldg 66-subbsmt, bsmt, 1st and 2nd floor normal 277V lighting shutdown from 5 AM to 6 AM on Monday morning, June 18th, 2012 for Crocker Electric (Chris Hamil 617-224-2492) to splice a 60A connection off the feeders cables for the 480V/277V lighting panel L-1, located in 66-117E, for temporary construction power required for the 66-125 Prof Tisdale renovation project by Elaine Construction (Nick Murray 617-799-7913). Evan Koska 4-6173 and Kim Sutherland 8-5962 are the MIT project managers.
Normal lighting on floors 66-SB, B, 1 and 2 will be the only thing affected.
Effect:
Loss of normal 480V building power (277v lighting; normal lighting only) for the duration of the shutdown.