Bldg. 9 - All, Normal and Emergency 208V/120V Building Power Shutdown Request
daemon@ATHENA.MIT.EDU (shutdown-response@MIT.EDU)
Fri Jun 8 14:03:26 2012
From: shutdown-response@MIT.EDU
To: <undisclosed_recipients@MIT.EDU>
Cc: <jcombs@MIT.EDU>
Date: Fri, 8 Jun 2012 14:03:21 -0400
Message-ID: <F91F34A3DB0C42F2BEEF21F09061A9CA@facilities.ms.mit.edu>
MIME-Version: 1.0
Content-Type: text/plain;
charset="iso-8859-1"
Content-Transfer-Encoding: 7bit
Content-Class: urn:content-classes:message
The following normal and emergency 208v/120v building power shutdown request for Bldg. 9 - All, on Monday, June 18, 2012, at 11:00pm through 6:00am on Tuesday, June 19, 2012, is for your information and response. Any questions, please contact Billy Homeyer, x8-0432.
Please let us know whether this does or does not have your approval.
Thank you,
Jani Findlay
Repair and Maintenance
x3-6381
Type: Normal
Date: June 18, 2012
Day: Monday
Time: 11:00pm (6/18) - 6:00am (6/19)
Building(s): 9
Room(s): All
System: Normal and Emergency 208V/120V Building Power
Duration: 7 hours
Reason:
We request a bldg 9-all normal and emergency 120V/208V power shutdown from 11 PM on Monday evening, June 18th to 6 AM on Tuesday morning, June 19th, 2012 for Reilly Electric to install fire alarm related power monitoring relays within the main 208V switchgear, remove an existing ATS, install a new standby power panel and transfer all non life-safety loads from the existing emergency power panel (becomes life-safety) to the new stand-by panel and all as part of the bldg 9-fire alarm upgrades project by Elaine Construction (Mike Grandmaison 617-756-1077). Jennifer Combs 3-7671 is the MIT project manager.
Effect:
Loss of emergency power, building power, elevators, computers, telephones, lighting, compressed control air, condensate return, and sanitary and storm drain drainage for the duration of the shutdown.