Bldg. 5 - Basement Labs/Offices, 1st and 2nd Floor Classrooms, Air Handler 1, Exhaust Fan 1 (PM #717434) Shutdown Request
daemon@ATHENA.MIT.EDU (shutdown-response@MIT.EDU)
Thu Jun 7 08:12:25 2012
From: shutdown-response@MIT.EDU
To: <undisclosed_recipients@MIT.EDU>
Cc: <sinanig@MIT.EDU>
Date: Thu, 7 Jun 2012 08:12:21 -0400
Message-ID: <189B2A8494CB4B8990318DC7A121E764@facilities.ms.mit.edu>
MIME-Version: 1.0
Content-Type: text/plain;
charset="iso-8859-1"
Content-Transfer-Encoding: 7bit
Content-Class: urn:content-classes:message
The following air handler 1, exhaust fan 1 (PM #717434) shutdown request for Bldg. 5 - Basement Labs/Offices, 1st and 2nd Floor Classrooms, on Saturday, June 9, 2012, at 6:00am through 6:00am on Monday, June 11, 2012, is for your information and response. Any questions, please contact Billy Homeyer, x8-0432.
Please let us know whether this does or does not have your approval.
Thank you,
Jani Findlay
Repair and Maintenance
x3-6381
Type: Normal
Date: June 9, 2012
Day: Saturday
Time: 6:00am (6/9) through 6:00am (6/11)
Building(s): 5
Room(s): Basement Labs/Offices, 1st and 2nd Floor Classrooms
System: Air Handler 1, Exhaust Fan 1 (PM #717434)
Duration: 48 hours
Reason:
We request bldg 5-AH1/EF1 shutdowns from 6 AM on Saturday, June 9th to 6 AM on Monday, June 11th, 2012 for Ducts Inc (Darren King 617-908-7370)/AHC Mechanical (Guy Fossiano 781-844-7815) to install and seal new supply air and general/fume hood exhaust ductwork in 5-034, 026, 022 as part of a Mech E project, that properly balances air flows in these labs, by Renovations Inc. (Jim Abbisso 617-594-7650). Gerhard Sinani 617-233-1413/4-1705 is the MIT project manager.
*note a minimum of 24 hours is required to allow the duct sealant product to set and cure properly. AH1 also serves 1st and 2nd floor classrooms.
Effect:
Loss of supply ventilation and heating air for the duration of the shutdown.