[158907] in Hotline Meeting
Bldg. 3 - All, Normal Building Power (All normal 480V/208V/120V) Shutdown Request
daemon@ATHENA.MIT.EDU (shutdown-response@MIT.EDU)
Mon May 21 13:36:50 2012
From: shutdown-response@MIT.EDU
To: <undisclosed_recipients@MIT.EDU>
Cc: <pisanin@MIT.EDU>
Date: Mon, 21 May 2012 13:36:45 -0400
Message-ID: <C30E5E2091154CC9BC53F877AFAA1DF5@facilities.ms.mit.edu>
MIME-Version: 1.0
Content-Type: text/plain;
charset="iso-8859-1"
Content-Transfer-Encoding: 7bit
Content-Class: urn:content-classes:message
The following normal building power (all normal 480V/208V/120V) shutdown request for Bldg. 3 - All, on Friday, June 1, 2012, 12:00am - 6:00am, is for your information and response. Any questions, please contact Billy Homeyer, x8-0432.
Please let us know whether this does or does not have your approval.
Thank you,
Jani Findlay
Repair and Maintenance
x3-6381
Type: Normal
Date: June 1, 2012
Day: Friday
Time: 12:00am - 6:00am
Building(s): 3
Room(s): All
System: Normal Building Power (All normal 480V/208V/120V)
Duration: 6 hours
Reason:
We request a bldg 3-all normal 480V/208V/120V bldg power shutdown from 12 midnight to 6 AM on Friday morning, June 1st, 2012 for Broadway Electric (Bob LeBlond 617-908-8550) to refeed the 3-442E slate board with cable in conduit per code and as part of the ECM/Nexus Labs renovation project by O'Connor Constructors (Paul Daley 617-828-4537). Nicole Pisani 5-5157 and Joe Collins 3-3621 are the MIT project managers.
Please note the power for tel/data closets 3-357T, 259T and 085T is fed out of bldg 1 normal power and will not be affected by this shutdown.
Effect:
Loss of normal building power, elevators, computers, telephones, lighting, supply ventilation/cooling/heating air, laboratory/general exhaust, condensate return, lab waste drainage, and exhaust hoods for the duration of the shutdown.