[158873] in Hotline Meeting

home help back first fref pref prev next nref lref last post

Bldg. 13 - (see list below for rooms/areas affected), Normal Building Power (208V/120V) Shutdown Request

daemon@ATHENA.MIT.EDU (shutdown-response@MIT.EDU)
Mon May 21 09:43:01 2012

From: shutdown-response@MIT.EDU
To: <undisclosed_recipients@MIT.EDU>
Cc: <biss@MIT.EDU>
Date: Mon, 21 May 2012 09:42:56 -0400
Message-ID: <1F2E20D5D9A64537BAF7CC45172F85C8@facilities.ms.mit.edu>
MIME-Version: 1.0
Content-Type: text/plain;
	charset="iso-8859-1"
Content-Transfer-Encoding: 7bit
Content-Class: urn:content-classes:message

The following normal building power (208V/120V) shutdown request for Bldg. 13 - (see list below for rooms/areas affected), on Friday, May 25, 2012, 12:00am - 6:00am, is for your information and response.  Any questions, please contact Biss Teelucksingh, x2-5962.

Please let us know whether this does or does not have your approval.

Thank you,

Jani Findlay
Repair and Maintenance
x3-6381

Type: Normal
Date: May 25, 2012
Day: Friday
Time: 12:00am - 6:00am
Building(s): 13
Room(s): (see list below for rooms/areas affected
System: Normal Building Power (208V/120V)
Duration: 6 hours
Reason: 
We request a bldg 13 normal 208V/120V building power shutdown from midnight to 6 AM on Friday morning, May 25th, 2012 in order to install circuit breakers and tie-in in sub panels for the 13-3rd floor NSF funded labs renovation project. We need to de-energize three of the 208V feeder risers (#'s 200, 203 and 213) in order to work in 3rd floor power panels 13C, 21C and 49. The following laboratories and offices will be affected and experience a loss of 120V and 208V power during the shutdown period; 480V power and all other building utilities will not be affected.

All room numbers 2012 to 2080
All room numbers 3011 to 3080
All room numbers 4011 to 4080
All room numbers 5016 to 5076
2148
3147
3148
3123 - 225A 208V disconnect only
4137
4139
4147
4148
5137
5147
5148

Barr and Barr Builders is the general contractor; John Bidgood 508-686-0870
Bennett Electric is the electrical subcontractor; Jim Vella 781-706-2920
MIT's project manager is Biss Teelucksingh 617-447-5081


Effect: 
Loss of normal building power (208V/120V) for the duration of the shutdown.