[158461] in Hotline Meeting
3-3rd floor, Fire Protection Water Shutdown Notification
daemon@ATHENA.MIT.EDU (shutdown-response@MIT.EDU)
Fri May 11 09:54:45 2012
From: shutdown-response@MIT.EDU
To: <undisclosed_recipients@MIT.EDU>
Cc: <pisaninmit.edu@MIT.EDU>
Date: Fri, 11 May 2012 09:54:37 -0400
Message-ID: <B74CB09A64AB402C91B057FDCB8B0C7E@facilities.ms.mit.edu>
MIME-Version: 1.0
Content-Type: text/plain;
charset="iso-8859-1"
Content-Transfer-Encoding: 7bit
Content-Class: urn:content-classes:message
The following fire protection water shutdown notification for building 3-3rd floor on Monday, May 14, 2012 from 6:00am - 2:00pm is for your information. No response required to this notification. Any question please contact Billy Homeyer x 8-0432.
We appreciate your patience while the repairs/renovations are in progress.
Thank you
Nicole McKenna
Operations Center
The Safety Office will be advised of this and notify the Fire Department.
Type: Normal
Date: May 14, 2012
Day: Monday
Time: 6:00am - 2:00pm
Building(s): 3
Room(s): 3rd floor
System: Fire Protection Water
Duration: 8 hours
Reason:
We request a building 3-3rd floor south and center risers sprinkler shutdown from 6am - 2pm on Monday, May 14th, 2012 as a precautionary measure while damaged construction area ceiling tiles are being replaced in spaces along the 3-3rd floor long corridor and as part of the ECM/Nexus Labs (working offices) project.
Effect:
Loss of fire protection water.