[158219] in Hotline Meeting
*Extended - Approved - Bldg. 31 - Fire Alarm Testing with Live
daemon@ATHENA.MIT.EDU (Bernadette Drinkwater)
Mon May 7 14:09:40 2012
From: Bernadette Drinkwater <BDrink@plant.mit.edu>
To: "jmletend@mit.edu" <jmletend@mit.edu>,
"oconaill@mit.edu"
<oconaill@mit.edu>,
"DICKP@MIT.EDU" <DICKP@mit.edu>,
"OPS RM Campus Services
Main" <rm-mcs@mit.edu>,
"thane@mit.edu" <thane@mit.edu>
CC: "shutdowns@mit.edu" <shutdowns@mit.edu>,
"whomeyer@mit.edu"
<whomeyer@mit.edu>,
"cp-command@mit.edu" <cp-command@mit.edu>,
"safety@mit.edu" <safety@mit.edu>, Operators <Operators@plant.mit.edu>,
"DOF
Customer Service Center" <dof-csc@mit.edu>,
Ops RM Shutdown
<rm-shutdown@mit.edu>,
Ops RM Fire Protection Team
<rm-fire-prot-team@mit.edu>
Date: Mon, 7 May 2012 14:09:36 -0400
Message-ID: <4EEA516695C10541B7CB963FF54A56AF0CE128897F@dof-exchmbx01.facilities.ms.mit.edu>
Content-Language: en-US
Content-Type: text/plain; charset="us-ascii"
MIME-Version: 1.0
Content-Transfer-Encoding: 8bit
This has been extended for one more day on include Tuesday, May 8th, 2012 from 6:00am - 8:00am. Thank you for your understanding.
Thank you,
Bernadette Drinkwater
Repair and Maintenance
X3-0938
Dear all, I need to extend this Bldg. 31 fire alarm shutdown to include tomorrow, Tuesday, May 8th, 2012 from 6 AM to 8 AM to conduct an NFPA required acceptance test and begin the 3rd party test. We were unable to live test today 5/7; some wire needed to be replaced and the live test window expired at 10 AM. Both the shutdown form and work order 5098549 have been modified to reflect this extension, Billy H. 8-0432
Wise, MacNichol, MIT Fire, JMBCo required
-----Original Message-----
From: Bernadette Drinkwater
Sent: Friday, May 04, 2012 2:23 PM
To: 'jmletend@mit.edu'; 'oconaill@mit.edu'; 'DICKP@MIT.EDU'; OPS RM Campus Services Main; 'thane@mit.edu'
Cc: shutdowns@mit.edu; whomeyer@mit.edu; cp-command@mit.edu; safety@mit.edu; Operators; DOF Customer Service Center; 'rm-shutdown@mit.edu' (rm-shutdown@mit.edu)
Subject: Approved - Bldg. 31 - Fire Alarm Testing with Live Audible shutdown
The following Approved Bldg. 31-All Fire Alarm Testing with live audible shutdown on Monday, May 7, 2012 is for your information. Any questions please contact Billy Homeyer x8-0432.
Thank you,
Bernadette Drinkwater
Repair & Maintenance
x3-0938
We request a bldg 31-all fire alarm shutdown from 6 AM to 10 AM on Monday, May 7th, 2012 for MacNichol Electric (Jim 978-273-7931) and Fire Command Systems (Ara Bernstein 978-473-9964) to tie-in, program and *live test* new speaker/strobes and gas sensor system cross trips/relays and addressable fire alarm modules w/LED's as part of the 31-037 Prof. Ghoniem Lab test cell renovation project by Wise Construction (Chris Luongo 781-389-5749). Gerhard Sinani 4-1705 is the MIT project manager.
Type: Normal
Date: May 7, 2012
Day: Monday
Time: 6:00am - 10:00am
Building(s): Bldg. 31
Room(s): All
System: Fire Alarm with Live Audible
Duration: 4 hours
Reason:
tie in two speaker/strobes: tie in and program gas sensor system modules, *live test
Effect:
Fire Alarms.