[158042] in Hotline Meeting
Bldg. E25-All, Heating Hot Water & E23/E25 lab process hot/cold water shutdown request
daemon@ATHENA.MIT.EDU (shutdown-response@MIT.EDU)
Thu May 3 09:21:24 2012
From: shutdown-response@MIT.EDU
To: <undisclosed_recipients@MIT.EDU>
Cc: <whomeyer@MIT.EDU>, <shutdowns@MIT.EDU>, <mmcorrei@plant.mit.edu>
Date: Thu, 3 May 2012 09:21:19 -0400
Message-ID: <9379904A3BCE4D7480BE8B7C7625CC12@facilities.ms.mit.edu>
MIME-Version: 1.0
Content-Type: text/plain;
charset="iso-8859-1"
Content-Transfer-Encoding: 7bit
Content-Class: urn:content-classes:message
The following E25 Heating Hotwater & E23/E25 lab process hot/cold shutdown request for Saturday, May 12, 2012 6:00am - 6:00pm. Contact Billy Homeyer x8-0432.
Would you please let us know if this does or does not have approval.
Thank you,
Bernadette Drinwkater
Repair and Maintenance
x3-0938
We request bldg E25 heating hot water and bldgs E23/E25 lab process hot/cold water shutdowns from 6 AM to 6 PM on Saturday, May 12th, 2012 for the installation of a new summer/winter heating/cooling system blending valve in the 006 mech room and for continued work on the underslab lab waste drain piping in the main construction area as part of the E25-bsmt AQ's renovation project by Bond Brothers (Andy Cogliano 617-839-8965). Jon Himmel 2-2402 is the MIT project manager.
FYI E23 LPH/C water needs to go down due to the new forced main being part of E25 lab waste.
Type: Normal
Date: May 12, 2012
Day: Saturday
Time: 6:00AM - 6:00PM
Building(s): E23 & E25
Room(s): ALL
System: E25 Heating Hot Water/E23 & E25 lab process hot/cold water
Duration: 12 hours
Reason:
Install new summer/winter mixing valve, work underslab lab waste piping
Effect:
Loss of heating hot water & hot/cold lab process