[157896] in Hotline Meeting
Emergency Shutdown - Fan Supply AHB1 - E19-2nd & 3rd floor
daemon@ATHENA.MIT.EDU (shutdown-response@MIT.EDU)
Mon Apr 30 12:07:18 2012
From: shutdown-response@MIT.EDU
To: <undisclosed_recipients@MIT.EDU>
Cc: <plyons@plant.mit.edu>, <shutdowns@MIT.EDU>, <Operators@plant.mit.edu>,
<dof-csc@MIT.EDU>, <rm-shutdown@MIT.EDU>, <safety@MIT.EDU>
Date: Mon, 30 Apr 2012 12:07:15 -0400
Message-ID: <DF710A07555946D5953E1385200B2CF7@facilities.ms.mit.edu>
MIME-Version: 1.0
Content-Type: text/plain;
charset="iso-8859-1"
Content-Transfer-Encoding: 7bit
Content-Class: urn:content-classes:message
Emergency Shutdown of Fan Supply AHB1 on Monday, April 30, 2012 from 12:30pm - 3:00pm due to a broken air duct.
Thank you for your patience while the repairs were in progress.
Sincerely,
Bernadette Drinkwater
Repair and Maintenance
X3-0938
Type: Normal
Date: April 30, 2012
Day: Monday
Time: 12:30pm - 3:00pm
Building(s): E19
Room(s): 2 & 3rd floor
System: AHB1
Duration: 2.5 hours
Reason:
Repair broken duct
Effect:
Loss of supply air E19 - 2nd & 3rd floors
This message was sent the following recipients: alimart@mit.edu; Swetzel@mit.edu; tswartz@mit.edu; rm-ecs@mit.edu; mfahie@plant.mit.edu; mobrien@plant.mit.edu; rm-org@mit.edu; maustin@mit.edu; mcpierce@MIT.EDU; wturner@mit.edu; opsnote@mit.edu; pconnell@MIT.EDU; annm@mit.edu; heatherg@mit.edu; ejstratt@mit.edu; lab-manager@mit.edu; mscoppa@MIT.EDU; wbarrett@mit.edu; kshikes@MIT.EDU; tquinn@mit.edu;