[157650] in Hotline Meeting
Building NW14-2nd floor Fire Protection Water system shutdown notification
daemon@ATHENA.MIT.EDU (shutdown-response@MIT.EDU)
Fri Apr 20 10:28:33 2012
From: shutdown-response@MIT.EDU
To: <undisclosed_recipients@MIT.EDU>
Cc: <jcombs@MIT.EDU>
Date: Fri, 20 Apr 2012 10:28:28 -0400
Message-ID: <B6BA804C2B8F4AA1BE6332B8C2FFB227@facilities.ms.mit.edu>
MIME-Version: 1.0
Content-Type: text/plain;
charset="iso-8859-1"
Content-Transfer-Encoding: 7bit
Content-Class: urn:content-classes:message
The following Fire Protection Water system shutdown notification for Building NW14-2nd floor on Monday, April 23, 2012 through Friday, April 28, 2012 from 5pm through 5 am each regular work day is for your information. No response is required to this notification. Any questions please contact Billy Homeyer at 8-0432.
We appreciate your patience while the repairs/renovations are in progress.
Thank you,
Linda Bradford
Operation Center
Type: Normal
Date: April 23, 2012
Day: Monday
Time: 5pm
Building(s): NW14
Room(s): 2nd floor
System: Fire Protection Water
Duration: 12 hours
Reason:
We request bldg NW14-2nd floor (both risers) sprinkler shutdowns from 5 PM to 1 AM each evening, Monday, April 23rd thru Friday, April 27th, 2012 (Saturday morning 4/28 at 5 AM) as a precautionary measure associated with asbestos abatement and wall demo in NW14-2215, 2216, 2217 and 2218 and as part of the Prof Ju Li lab/office renovation project's abatement phase by ABS.
Effect:
Loss of fire protection water in Building NW14-2nd floor (2215, 2216, 2217, 2218) The Safety Office will be advised and notify the Fire department.