[15579] in Hotline Meeting
No subject found in mail header
daemon@ATHENA.MIT.EDU (jjmorey@Athena.MIT.EDU)
Tue May 4 09:50:01 1993
From: jjmorey@Athena.MIT.EDU
Date: Tue, 4 May 93 09:49:54 -0400
To: shutdowns@Athena.MIT.EDU
/***** hector:hotline / priam!jjmorey / 9:49 am May 4, 1993*/
/***** hector:hotline / priam!hykim / 9:21 am Apr 27, 1993*/
From hykim@MIT.EDU Tue Apr 27 09:21:18 1993
Date: Tue, 27 Apr 93 09:20:56 -700
From: hykim@MIT.EDU (Susan Kim)
To: shutdowns@MIT.EDU
Subject: 11-135, May 3 6-9pm
Bill from Operations called with a shutdown to occur on May 3 from 6 - 9
pm in bldg 11-135. The Daytek air conditioning unit will be shutdown.
Susan Kim
Network Help Desk
/* ---------- */
I've given Bill the Ok.
4-27-93
10:20am
JJ
The above A/C shutdown has not taken place this evening. The person
scheduled to do the job was hurt on the job at another location. This will
be re-scheduled by P.P. Operations.
--Lou 5/3 18:20
P.P. had just contacted me, (20:55), and would like to at least inspect the
A/C unit and re-tighten the belts, until the job can be re-scheduled.
I have given them the o.k. and with initialy meet with them at the 11-135
location.
--Lou 5/3 21:00
Work is scheduled to be done Mon 10th 4pm-7:30pm. Backup unit should
remain running while primary being worked on.
Lou could you be on site when they get there and just followup with
later in the night.
5-4-93
9:50am
Thanks
JJ
/* ---------- */