[15417] in Hotline Meeting
shutdowns
daemon@ATHENA.MIT.EDU (wliang@Athena.MIT.EDU)
Tue Apr 27 12:29:48 1993
From: wliang@Athena.MIT.EDU
To: shutdowns@Athena.MIT.EDU
Date: Tue, 27 Apr 93 12:29:35 EDT
Liane from the operations center called.
Bldg. W4-McCormick Hall-West Tower-There will be a heat shutdown on April 28,
starting at 9am and will end in 6 hours.
Bldg. W4-McCormick Hall-East Tower-There will be a heat shutdown starting on
April 29 at 12 midnight, and ending at midnight the next day, April 30.
Bldg. 12- There will be a hot water shutdowns to the labs on April 28 from 7am
to 11am.
Bldg. 36-There will be a fan hood shutdown on April 30 from 3am to 7am. It will
affect the rooms 252, 330, 828, 862, 888.
Bldg. 26-There will be a fan hood shutdown on April 29 from 11pm to 3am, April
30. This will affect the rooms 031, 040, 240, 540A.
Winnie