[14683] in Hotline Meeting
E40-008 & 16-034 Flood
daemon@ATHENA.MIT.EDU (larugsi@Athena.MIT.EDU)
Mon Mar 29 22:50:02 1993
From: larugsi@Athena.MIT.EDU
To: hotline@Athena.MIT.EDU
Cc: dcns-cluster@Athena.MIT.EDU, op@Athena.MIT.EDU
Date: Mon, 29 Mar 93 22:49:48 EST
I have been cordinating/working these 2 floods this evening. 16-034 is not
half as bad as E40-008. I am about to meet with Kim, to see that the transition
to 3rd shift goes smooth, regarding the water pickup at these locations.
The water appears to be coming in very fast in the E40 machine room. After
discussing this flow with one of the Bldg Services supervisors, I asked him to
call the structural dept. on Tuesday. I want to make sure that the integrity
of the structure/foundation is not culprit at this point. Also, if a work order
is issued, 1410 or myself with receive the work order #, if one is actualy
needed.
--Lou