[12848] in Hotline Meeting

home help back first fref pref prev next nref lref last post

Rescheduled Shutdown NW17

daemon@ATHENA.MIT.EDU (Hasan Sharif)
Thu Jan 14 14:32:12 1993

Date: Thu, 14 Jan 93 15:40:23
From: has@MIT.EDU (Hasan Sharif)
To: shutdowns@Athena.MIT.EDU

Lee-Ann called in and said that the Supply Fans 1 through 5 in building 
NW17 would be shut down on Thursday the 21st from 8:30am to 11am. The 
shut down will affect the basement, the 1st floor and the 2nd floor east 
and west.

home help back first fref pref prev next nref lref last post