[11848] in Hotline Meeting
pollux back in service
daemon@ATHENA.MIT.EDU (Darrin E. Robinson)
Thu Nov 19 16:07:04 1992
To: op@Athena.MIT.EDU, hotline@Athena.MIT.EDU
Date: Thu, 19 Nov 92 16:06:52 EST
From: Darrin E. Robinson <darrin@Athena.MIT.EDU>
pollux is now back in service. There was a bad power supply on the main
bus. The power supply was the right hand supply that powers the CPU. Bill
replaced this and the machine came back to life. Total downtime was from
~11:00am to 4:05pm -- 4 hours 5 minutes.
Darrin