Hi All-

The electricians did their testing and have found a problem.
Chris Salter will be getting in touch with Jerry about what
was found.  

What happen'd:

1. Power tested
2. Systems shutdown 11-113/116
3. Power tested
4. Equip turned back on, no fatalities

JJ