Re: cleared these.......

daemon@ATHENA.MIT.EDU (Jerry Burke)
Fri Oct 30 11:54:01 1992

Date: Fri, 30 Oct 92 11:56:13 EST
From: burke@MIT.EDU (Jerry Burke)
To: sampson@MIT.EDU (Mike Sampson)
Cc: shutdowns@MIT.EDU

> Date: Thu, 29 Oct 92 13:34:32 EST
> From: sampson@MIT.EDU (Mike Sampson)
> To: shutdowns@MIT.EDU
> Subject: Shutdown Notice #1
> 
> Shutdown Notice #1
> 
> Building#       W1   all floors
> Date:           Friday October 30, 1992
> Time:           From 7 AM to 3 PM
> Purpose:        Replace 200 lb steam boiler
> Inpack:         No steam, no heat, no hot water

Shutdown Notice #2

Building#       1-214
Date:           Friday October 30, 1992 thru Sunday November 1, 1992
Time:           57 hour shutdown
Purpose:        Asbestos removal
Inpack:         No use of room

Shutdown Notice #3

Building#       8-113, 8-215, 8-313 and 8-415
Date:           Friday October 30, 1992 
Time:           start at 7:30 AM  for 8 hours 
Purpose:        Cold water shutdown
Inpack:         No cold water

Shutdown Notice #4

Building#       E38   all floors
Date:           Saturday November 7, 1992 
Time:           6 AM to 6 PM 
Purpose:        All steam heat
Inpack:         No heat


Building#       E18-645  Animal quarters (mixing room/dating bar)
Date:           Sunday  November 1, 1992, Monday November 2, 1992 
Time:           11PM Sunday to 2AM Monday
Purpose:        Replace fan hood exhaust
Inpack:         No ventilation


Building#       E38-4th  
Date:           Monday November 2, 1992 
Time:           7AM to 3PM Monday
Purpose:        shutdown All electricity

Building#       E38 
Date:           Monday November 2, 1992 
Time:           8AM to noon Monday
Purpose:        shutdown steam
Inpack:         No heat


> Contact:        Mary Files, Physical Plant, X3-1500, if problem
> 